The Prospector News

Eloro Resources Makes a US$1.5 Million Option Payment for the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Eloro Resources Makes a US$1.5 Million Option Payment for the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

 

 

 

 

 

Eloro Resources Ltd. (TSX: ELO) (OTCQX: ELRRF) (FSE: P2QM) is pleased to announce that it made a US$1,500,000 option payment to Empresa Minera Villegas S.R.L. the title holder of the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia, leaving a final cash payment of US$1,150,000 due on January 6, 2026.

 

Pursuant to the amended terms of the option agreement to acquire Iska Iska, the payment schedule for the aggregate US$10,000,000 payment required for Eloro to earn a 100% interest in Iska Iska, includes a credit for the US$1,800,000 incurred by the Company in exploration expenditures on the adjacent Mina Casiterita property, which will be applied towards the Mina Casiterita / Mina Hoyada option agreement, as amended (see Eloro’s press releases dated November 22, 2022 and June 30, 2025). In order to earn a 100% interest in the Mina Casiterita / Mina Hoyada properties, the Company is required to make a cash payment of US$1,800,000 within 12 months from the date on which the mining rights for Mina Casiterita and Mina Hoyada are duly obtained and, subject to all required regulatory approval, issue the titleholder 200,000 common shares of the Company when the transfer of the properties is completed.

 

About Eloro Resources Ltd.

 

Eloro is an exploration and mine development company with a portfolio of gold and base-metal properties in Bolivia, Peru and Quebec. Eloro has an option to acquire a 100% interest in the highly prospective Iska Iska Property, which can be classified as a polymetallic epithermal-porphyry complex, a significant mineral deposit type in the Potosi Department, in southern Bolivia. A NI 43-101 Technical Report on Iska Iska, which was completed by Micon International Limited, is available on Eloro’s website and under its filings on SEDAR+. Iska Iska is a road-accessible, royalty-free property. Eloro also owns an 82% interest in the La Victoria Gold/Silver Project, located in the North-Central Mineral Belt of Peru some 50 km south of the Lagunas Norte Gold Mine and the La Arena Gold Mine.

Posted July 22, 2025

Share this news article

MORE or "UNCATEGORIZED"


Brixton Metals Drills 13.0m of 594 g/t Silver Including 0.5m of 7,900 g/t Silver at its Langis Project

Brixton Metals Corporation (TSX-V: BBB) (OTCQX: BBBXF) is pleased to ann... READ MORE

May 11, 2026

Barrick Reports First Quarter 2026 Results

Disciplined execution drives strong operational and financial per... READ MORE

May 11, 2026

Capitan Silver Intersects 935 g/t Silver Equivalent over 1.3 Metres, Within a Wider Zone of 157 g/t Silver Equivalent over 20.0 Metres at the Cruz De Plata Project

Capitan Silver Corp. (TSX-V: CAPT) (OTCQX: CAPTF) is pleased to r... READ MORE

May 11, 2026

Orla Mining Reports First Quarter 2026 Financial Results

Strong start to 2026 driven by Musselwhite Orla Mining Ltd... READ MORE

May 11, 2026

Wallbridge Reports Initial Results from 2026 Martiniere Drill Program Expanding Mineralization along Dragonfly Corridor

Wallbridge Mining Company Limited (TSX: WM) (OTCQB:WLBMF) is plea... READ MORE

May 11, 2026

Copyright 2026 The Prospector News