The Prospector News

Eloro Resources Makes a US$1.5 Million Option Payment for the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Eloro Resources Makes a US$1.5 Million Option Payment for the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

 

 

 

 

 

Eloro Resources Ltd. (TSX: ELO) (OTCQX: ELRRF) (FSE: P2QM) is pleased to announce that it made a US$1,500,000 option payment to Empresa Minera Villegas S.R.L. the title holder of the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia, leaving a final cash payment of US$1,150,000 due on January 6, 2026.

 

Pursuant to the amended terms of the option agreement to acquire Iska Iska, the payment schedule for the aggregate US$10,000,000 payment required for Eloro to earn a 100% interest in Iska Iska, includes a credit for the US$1,800,000 incurred by the Company in exploration expenditures on the adjacent Mina Casiterita property, which will be applied towards the Mina Casiterita / Mina Hoyada option agreement, as amended (see Eloro’s press releases dated November 22, 2022 and June 30, 2025). In order to earn a 100% interest in the Mina Casiterita / Mina Hoyada properties, the Company is required to make a cash payment of US$1,800,000 within 12 months from the date on which the mining rights for Mina Casiterita and Mina Hoyada are duly obtained and, subject to all required regulatory approval, issue the titleholder 200,000 common shares of the Company when the transfer of the properties is completed.

 

About Eloro Resources Ltd.

 

Eloro is an exploration and mine development company with a portfolio of gold and base-metal properties in Bolivia, Peru and Quebec. Eloro has an option to acquire a 100% interest in the highly prospective Iska Iska Property, which can be classified as a polymetallic epithermal-porphyry complex, a significant mineral deposit type in the Potosi Department, in southern Bolivia. A NI 43-101 Technical Report on Iska Iska, which was completed by Micon International Limited, is available on Eloro’s website and under its filings on SEDAR+. Iska Iska is a road-accessible, royalty-free property. Eloro also owns an 82% interest in the La Victoria Gold/Silver Project, located in the North-Central Mineral Belt of Peru some 50 km south of the Lagunas Norte Gold Mine and the La Arena Gold Mine.

Posted July 22, 2025

Share this news article

MORE or "UNCATEGORIZED"


Mithril Silver & Gold Announces Closing of C$11.5 Million Brokered Private Placement of Ordinary Shares

Mithril Silver and Gold Limited (TSX-V: MSG) (ASX: MTH) is please... READ MORE

July 24, 2025

American Tungsten Corp. Announces Closing of Upsized $7m Financing

American Tungsten Corp. (CSE:TUNG) (OTCQB:DEMRF) (FSE:RK9) is ple... READ MORE

July 24, 2025

Aya Gold & Silver Reports Q2-2025 and Mid-July Production Results

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) is pleased t... READ MORE

July 24, 2025

NexGold Continues to Intersect High-Grade Gold Mineralization at the Goldboro Open Pit Gold Project, Including 108.76 g/t Au over 1.40 metres and 67.23 g/t gold over 2.20 metres

NexGold Mining Corp. (TSX-V: NEXG) (OTCQX: NXGCF) is pleased to p... READ MORE

July 24, 2025

Awalé Confirms Gold and Copper Mineralization Over 2 km of Strike at Lando, Odienné Project

HIGHLIGHTS Diamond and initial RC drilling at Lando have confirme... READ MORE

July 24, 2025

Copyright 2025 The Prospector News