The Prospector News

Ellis Martin Report: Steppe Gold reports 28% Increase in Gold Production

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Ellis Martin Report: Steppe Gold reports 28% Increase in Gold Production

 

 

 

https://youtu.be/t-aNuLeajWo

 

 

Join Ellis Martin now for a conversation with Aneel Waraich the Executive Vice President and Director of Steppe Gold (OTCQX:STPGF) (TSX:STGO). We take a look at a demonstrated explorer, developer and gold producer in Mongolia employing approximately 250 individuals locally. Production costs all in are about $750-800 per ounce. Mr. Waraich reviews recent increases in gold production at the company’s ATO Gold Mine.

 

We also take a broad look at the gold market and the equities. Gold production was approximately 13,300 oz, up 28% from second quarter Mined 266,292 tonnes and 230,399 tonnes crushed and stacked in third quarter At September 30, total estimated recoverable gold in inventory is 71,000 ounces Gold production in the third quarter was approximately 13,300 oz, up 28% from the second quarter where the Company produced 10,400 oz.

 

The Company has continued with its regular pour schedule, twice per month. Ongoing deliveries to MongolBank attract a 5% premium to the LME Spot price. Mining and stacking activities were on plan for the third quarter and we are now stacking ore on the second lift of the leach pad. Mining activities decreased in September as the planned fall and winter slowdown commenced, with 266,292 tonnes mined across ATO2, ATO1 and ATO4, and 230,399 tonnes crushed and stacked in the third quarter.

 

As of September 30, 2022 the Company has now mined 3.29 million tonnes, crushed and stacked 2.56 million tonnes @ 1.93 g/t for approximately 158,884 ounces of gold on the leach pad and 684,000 tonnes of ore at an average grade of 1.0 g/t on the ROM pad. At an estimated 70% recovery, the total inventory on the leach pad, ROM pad and pit floors is approximately 71,000 ounces of recoverable gold.

 

Courtesy of the Ellis Martin Report

Posted November 2, 2022

Share this news article

MORE or "UNCATEGORIZED"


GR Silver Mining Extends Silver Mineralization with Step-Out Drilling at San Marcial 11.9 m @ 226 g/t Ag Eq* including 0.9m @ 716 g/t Ag Eq

GR Silver Mining Ltd. (TSX-V: GRSL) (OTCQB: GRSLF) (FRANKFURT: G... READ MORE

July 25, 2025

Big Ridge Gold Corp. Closes Upsized $5.2 Million Private Placement

Big Ridge Gold Corp. (TSX-V: BRAU) (OTCQB: ALVLF) is pleased to a... READ MORE

July 25, 2025

St. Augustine Closes Private Placement

St. Augustine Gold and Copper Limited (TSX: SAU) is pleased to announce ... READ MORE

July 25, 2025

GoldShore Intersects Additional Mineralization Beneath the Conceptual Open Pit at the Southwest Zone with 22m of 1.30 g/t Au

Goldshore Resources Inc. (TSX-V: GSHR) (OTCQB: GSHRF) (FSE: 8X00)... READ MORE

July 25, 2025

Benz Announces Closing Final Tranche of A$13.5M Financing

Benz Mining Corp. (TSX-V: BZ) (ASX: BNZ) is pleased to advise tha... READ MORE

July 25, 2025

Copyright 2025 The Prospector News