The Prospector News

Ellis Martin Report: Steppe Gold reports 28% Increase in Gold Production

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Ellis Martin Report: Steppe Gold reports 28% Increase in Gold Production

 

 

 

https://youtu.be/t-aNuLeajWo

 

 

Join Ellis Martin now for a conversation with Aneel Waraich the Executive Vice President and Director of Steppe Gold (OTCQX:STPGF) (TSX:STGO). We take a look at a demonstrated explorer, developer and gold producer in Mongolia employing approximately 250 individuals locally. Production costs all in are about $750-800 per ounce. Mr. Waraich reviews recent increases in gold production at the company’s ATO Gold Mine.

 

We also take a broad look at the gold market and the equities. Gold production was approximately 13,300 oz, up 28% from second quarter Mined 266,292 tonnes and 230,399 tonnes crushed and stacked in third quarter At September 30, total estimated recoverable gold in inventory is 71,000 ounces Gold production in the third quarter was approximately 13,300 oz, up 28% from the second quarter where the Company produced 10,400 oz.

 

The Company has continued with its regular pour schedule, twice per month. Ongoing deliveries to MongolBank attract a 5% premium to the LME Spot price. Mining and stacking activities were on plan for the third quarter and we are now stacking ore on the second lift of the leach pad. Mining activities decreased in September as the planned fall and winter slowdown commenced, with 266,292 tonnes mined across ATO2, ATO1 and ATO4, and 230,399 tonnes crushed and stacked in the third quarter.

 

As of September 30, 2022 the Company has now mined 3.29 million tonnes, crushed and stacked 2.56 million tonnes @ 1.93 g/t for approximately 158,884 ounces of gold on the leach pad and 684,000 tonnes of ore at an average grade of 1.0 g/t on the ROM pad. At an estimated 70% recovery, the total inventory on the leach pad, ROM pad and pit floors is approximately 71,000 ounces of recoverable gold.

 

Courtesy of the Ellis Martin Report

Posted November 2, 2022

Share this news article

MORE or "UNCATEGORIZED"


Volta Drills Widest TREO-Mineralized Interval to Date 0.95% TREO over 438.9m, Including 1.06% TREO over 358.6m, at Springer REE Project in Ontario, Canada

Drillhole ends in mineralization with 1.78% TREO   HIGHLIGHTS Dr... READ MORE

November 12, 2025

Trident Resources Intersects 7.03gpt Au over 43.25m Starting at 121.0m Depth, including 30.06gpt Au over 9.25m at Contact Lake Gold Project, Saskatchewan

Trident Resources Corp. (TSX-V: ROCK) (OTCQB: TRDTF) is pleased ... READ MORE

November 12, 2025

Orla Mining Reports Third Quarter 2025 Financial Results

Orla Mining Ltd. (TSX: OLA) (NYSE: ORLA) announces the results fo... READ MORE

November 12, 2025

Silverco Mining Expands on San Miguel Target, Drilling 8.6m Grading 250 g/t AgEq and 2.1m Grading 1,042 g/t AgEq at the Cusi Property, Chihuahua, Mexico

2025 San Miguel Drilling Highlights 250 g/t AgEq over 8.6 metres ... READ MORE

November 12, 2025

Aya Gold & Silver Reports Record Revenue and Net Income for Q3-2025 on Record Production

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) announced th... READ MORE

November 12, 2025

Copyright 2025 The Prospector News