The Prospector News

Ellis Martin Report – “ION Energy Provides Operational Update on Urgakh Naran Exploration Program” (Audio)

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Ellis Martin Report – “ION Energy Provides Operational Update on Urgakh Naran Exploration Program” (Audio)

 

 

 

https://youtu.be/IEB_Oeu3Ffg

 

 

In this segment of The Ellis Martin Report we speak with Ion Energy’s CEO Ali Haji as we provide a report on a recent site visit to Mongolia’s very promising premiere lithium exploration project with an inferred resource estimate out by likely by the end of the year.

 

ION Energy Limited (TSX-V: ION) (OTCQB: IONGF) (FRA: 5YB) is very pleased to provide an update on drilling operations at Urgakh Naran in Mongolia, following the Company’s previously announced site visit in September.

 

Highlights:

Ø  Drilling of two lithological diamond core holes has been completed at Urgakh Naran with a total depth of 702m, third hole currently at 185m;

Ø  Drilling of one water well down to 300m has been completed using a tricone bit, slotted casings, with a diameter of 6 inches;

Ø  Total cumulated gravelite, porous and permeable zones starting at 184m seen at UNDH-02 show thickness of at least 80m; and

Ø  Site visit concluded in September 2022 with a second visit planned for October 2022; inferred resource calculation ongoing.

 

“Onsite advancements at Urgakh Naran continue to be highly encouraging. Being able to report on lithology which is indicative of permeability, further validates the low resistivity zones identified by the TEM conducted this summer. We continue to advance the asset at breakneck speed.” said Ali Haji, CEO & Director of ION Energy. Efforts steadily progress at Urgakh Naran to complete the diamond holes as well as the monitoring wells, allowing the Company to progress inferred resource calculations.

 

About ION Energy Ltd.

 

ION Energy Ltd. is committed to exploring and developing Mongolia’s lithium salars. ION’s flagship, 81,000+ hectare Baavhai Uul lithium brine project, represents the largest and first lithium brine exploration licence award in Mongolia. ION also holds the 29,000+ hectare Urgakh Naran highly prospective Lithium Brine licence in Dorngovi Province in Mongolia. ION is well-poised to be a key player in the clean energy revolution, positioned well to service the world’s increased demand for lithium.

 

Courtesy of the Ellis Martin Report

Posted October 20, 2022

Share this news article

MORE or "UNCATEGORIZED"


First Quantum Minerals Reports Third Quarter 2026 Results

First Quantum Minerals Ltd. (TSX: FM) today reports results for the three and nine months ended Sept... READ MORE

October 29, 2026

Eldorado Gold Reports Q3 2026 Financial and Operational Results and Updates 2026 Guidance; Skouries and McIlvenna Bay Advancing Toward Commercial Production

Eldorado Gold Corporation (TSX: ELD) (NYSE: EGO) today reports the Company’s financial and operati... READ MORE

October 29, 2026

Alamos Gold Reports Third Quarter 2026 Results

Alamos Gold Inc. (TSX:AGI) (NYSE:AGI) today reported its financial results for the quarter e... READ MORE

October 29, 2026

Kinross reports 2026 third-quarter results

Kinross Gold Corporation (TSX: K) (NYSE: KGC) today announced its results for the third quarter ende... READ MORE

October 29, 2026

Imperial Intersects 5 Metres of 5.51 Grams Per Tonne Gold at the Porcher Island Property

Imperial Metals Corporation (TSX:III) reports assay results from its spring 2026 diamond drilling pr... READ MORE

October 29, 2026

Copyright 2026 The Prospector News