The Prospector News

Ellis Martin Report – “ION Energy Provides Operational Update on Urgakh Naran Exploration Program” (Audio)

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Ellis Martin Report – “ION Energy Provides Operational Update on Urgakh Naran Exploration Program” (Audio)

 

 

 

https://youtu.be/IEB_Oeu3Ffg

 

 

In this segment of The Ellis Martin Report we speak with Ion Energy’s CEO Ali Haji as we provide a report on a recent site visit to Mongolia’s very promising premiere lithium exploration project with an inferred resource estimate out by likely by the end of the year.

 

ION Energy Limited (TSX-V: ION) (OTCQB: IONGF) (FRA: 5YB) is very pleased to provide an update on drilling operations at Urgakh Naran in Mongolia, following the Company’s previously announced site visit in September.

 

Highlights:

Ø  Drilling of two lithological diamond core holes has been completed at Urgakh Naran with a total depth of 702m, third hole currently at 185m;

Ø  Drilling of one water well down to 300m has been completed using a tricone bit, slotted casings, with a diameter of 6 inches;

Ø  Total cumulated gravelite, porous and permeable zones starting at 184m seen at UNDH-02 show thickness of at least 80m; and

Ø  Site visit concluded in September 2022 with a second visit planned for October 2022; inferred resource calculation ongoing.

 

“Onsite advancements at Urgakh Naran continue to be highly encouraging. Being able to report on lithology which is indicative of permeability, further validates the low resistivity zones identified by the TEM conducted this summer. We continue to advance the asset at breakneck speed.” said Ali Haji, CEO & Director of ION Energy. Efforts steadily progress at Urgakh Naran to complete the diamond holes as well as the monitoring wells, allowing the Company to progress inferred resource calculations.

 

About ION Energy Ltd.

 

ION Energy Ltd. is committed to exploring and developing Mongolia’s lithium salars. ION’s flagship, 81,000+ hectare Baavhai Uul lithium brine project, represents the largest and first lithium brine exploration licence award in Mongolia. ION also holds the 29,000+ hectare Urgakh Naran highly prospective Lithium Brine licence in Dorngovi Province in Mongolia. ION is well-poised to be a key player in the clean energy revolution, positioned well to service the world’s increased demand for lithium.

 

Courtesy of the Ellis Martin Report

Posted October 20, 2022

Share this news article

MORE or "UNCATEGORIZED"


TomaGold Continues to Intersect Wide Zones of Zinc, Gold and Silver on Optioned Chibougamau Independent Claims

Chibougamau Independent Mines Inc. (TSX-V: CBG) (Germany: CLL1) (OTCMKTS: CMAUF), herein called Chib... READ MORE

September 30, 2026

Libra Closes Strategic Institutional Financing Led by SIDEX and NQ Mining Investment

Libra Energy Materials Inc. (CSE: LIBR) (OTCQB: LIBRF) (FSE: W0R0) is pleased to announce that it ha... READ MORE

September 30, 2026

Atico Announces US$95 Million Project Finance Facility and US$16.4 Million Convertible Debenture Private Placement for a Total of US$111.4 Million

Atico Mining Corporation (TSX-V: ATY) (OTC: ATCMF) is pleased to announce the Company’s ent... READ MORE

September 30, 2026

Largo Announces Closing of US$5.7 Million Registered Direct Offering

Largo Inc. (TSX: LGO) (NASDAQ: LGO) announces the closing of its previously announced registered di... READ MORE

September 30, 2026

ICG Silver & Gold Intersects 24.3 Meters of 10.14 g/t Gold, Including 4.6 Meters of 51.84 g/t Gold and 10.2 g/t Silver, at the Tuscarora District, Nevada

ICG Silver & Gold Ltd. (CSE: ICG) (FSE: JI0) (OTC Pink: ICGSF) is pleased to announce assay resu... READ MORE

September 30, 2026

Copyright 2026 The Prospector News