The Prospector News

Ellis Martin Report – “ION Energy Provides Operational Update on Urgakh Naran Exploration Program” (Audio)

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Ellis Martin Report – “ION Energy Provides Operational Update on Urgakh Naran Exploration Program” (Audio)

 

 

 

https://youtu.be/IEB_Oeu3Ffg

 

 

In this segment of The Ellis Martin Report we speak with Ion Energy’s CEO Ali Haji as we provide a report on a recent site visit to Mongolia’s very promising premiere lithium exploration project with an inferred resource estimate out by likely by the end of the year.

 

ION Energy Limited (TSX-V: ION) (OTCQB: IONGF) (FRA: 5YB) is very pleased to provide an update on drilling operations at Urgakh Naran in Mongolia, following the Company’s previously announced site visit in September.

 

Highlights:

Ø  Drilling of two lithological diamond core holes has been completed at Urgakh Naran with a total depth of 702m, third hole currently at 185m;

Ø  Drilling of one water well down to 300m has been completed using a tricone bit, slotted casings, with a diameter of 6 inches;

Ø  Total cumulated gravelite, porous and permeable zones starting at 184m seen at UNDH-02 show thickness of at least 80m; and

Ø  Site visit concluded in September 2022 with a second visit planned for October 2022; inferred resource calculation ongoing.

 

“Onsite advancements at Urgakh Naran continue to be highly encouraging. Being able to report on lithology which is indicative of permeability, further validates the low resistivity zones identified by the TEM conducted this summer. We continue to advance the asset at breakneck speed.” said Ali Haji, CEO & Director of ION Energy. Efforts steadily progress at Urgakh Naran to complete the diamond holes as well as the monitoring wells, allowing the Company to progress inferred resource calculations.

 

About ION Energy Ltd.

 

ION Energy Ltd. is committed to exploring and developing Mongolia’s lithium salars. ION’s flagship, 81,000+ hectare Baavhai Uul lithium brine project, represents the largest and first lithium brine exploration licence award in Mongolia. ION also holds the 29,000+ hectare Urgakh Naran highly prospective Lithium Brine licence in Dorngovi Province in Mongolia. ION is well-poised to be a key player in the clean energy revolution, positioned well to service the world’s increased demand for lithium.

 

Courtesy of the Ellis Martin Report

Posted October 20, 2022

Share this news article

MORE or "UNCATEGORIZED"


Cassiar Gold Corp. Announces Exploration Agreement with Dease River First Nation

Cassiar Gold Corp. (TSX-V: GLDC) (OTCQX: CGLCF) is pleased to announce the signing of an Exploration... READ MORE

September 22, 2026

Elemental Royalty Announces US$290 Million Acquisition of Royalty and Streaming Portfolio, Strategic Divestment of Generation Business and Management Succession

Elemental Royalty Corporation (NASDAQ: ELE) (TSX: ELE) is pleased to announce that it has entered i... READ MORE

September 22, 2026

Cambria Gold Mines Announces 166.2 g/t Au and 3,383 g/t Ag over 3.1 Meters at Premier and Expanded Drilling Program

Cambria Gold Mines Inc.(TSX-V: CAMB) (OTCQX: CAMVF) is pleased to announce new assay results from th... READ MORE

September 22, 2026

Meridian Mining's Definitive Feasibility Study for Cabaçal Delivers After-Tax NPV5 of USD 2.09 Billion, 108% IRR, and 0.9 Year Payback

Meridian Mining plc (LSE: MNO) (TSX: MNO) (FSE: N2E0) (Tradegate: N2E0) (OTCQX: MRRDF) is ple... READ MORE

September 22, 2026

Goliath Successfully Completes 48,443 Meters Of Drilling in 97 Drill Holes in 94 Days, With A 100% Hit Rate And Expands Footprint Of High-Grade Surebet Gold Discovery To 2.01 Km2 That Remains Open, Golddigger Property, Golden Triangle, B.C.

Goliath Resources Limited (TSX-V: GOT) (OTCQB: GOTRF) (FSE: B4IF) is pleased to announce that the 2... READ MORE

September 22, 2026

Copyright 2026 The Prospector News