Discovery Silver Corp. (TSX-V: DSV) (OTCQX: DSVSF) is pleased to announce results from its Preliminary Economic Assessment on its 100%-owned Cordero silver project located in Chihuahua State, Mexico.
Study highlights include (all figures are in USD unless otherwise noted):
Taj Singh, President and CEO, states: “With annual AgEq production averaging more than 26 Moz over a +15-year mine life we believe this PEA clearly positions Cordero as a Tier 1 silver asset. This impressive scale of production is achieved through modest development capex of $368 M and returns excellent margins with AISC averaging less than $12.50/AgEq oz over the life of the mine. These costs highlight the benefits of existing local infrastructure, excellent metallurgy, and a straight-forward open pit mine with excellent grades and a low strip ratio.
“Importantly, the outstanding metrics demonstrated in the PEA are supported by a mine plan with more than 99% of tonnes in the Measured and Indicated category, and a simple and conventional process design based on our detailed metallurgical testwork program completed earlier this year. This provides us with a huge head start as we look ahead to the delivery of a Prefeasibility Study on Cordero in 2022.”
PEA SUMMARY:
Study support:
Project Economics:
Sensitivity of the Project’s expected after-tax NPV, IRR and payback at different commodity price assumptions is outlined in the table below:
Units | Base Case | Upside Case | Base Case +15% | Base Case -15% | |||||||||
After-Tax NPV (5% discount rate) | (US$ M) | $1,160 | $1,889 | $1,692 | $622 | ||||||||
Internal Rate of Return | (%) | 38.2 | % | 54.6 | % | 49.9 | % | 25.2 | % | ||||
Payback | (yrs) | 2.0 | 1.4 | 1.6 | 3.5 |
After-Tax Free Cash Flow:
A chart summarizing the expected annual and cumulative after-tax free cash flow over the life-of-mine is provided below:
https://www.globenewswire.com/NewsRoom/AttachmentNg/d1131062-ffa4-4091-b528-d23ac46806b3
Production & Costs:
Annual production over the LOM is expected to average 26 Moz AgEq with production averaging over 33 Moz AgEq when fully ramped up (Years 5 – 12); this positions Cordero as one of the largest silver mines globally.
Units | Year 1 – 4 | Year 5 – 12 | Year 13 -16 | LOM | |
AgEq Produced – Average | (Moz) | 29 | 33 | 9 | 26 |
AgEq Payable – Average | (Moz) | 26 | 29 | 8 | 23 |
AgEq Produced – Total | (Moz) | 117 | 265 | 37 | 426 |
AgEq Payable – Total | (Moz) | 104 | 230 | 32 | 372 |
All-In Sustaining Cost (AISC) | (US$/AgEq oz) | $11.64 | $11.77 | $18.88 | $12.35 |
Note – LOM production/payable totals include production from Year -1. AgEq Produced is metal recovered in doré/concentrate. AgEq Payable is metal payable from doré/concentrate and incorporates metal payment terms outlined in the Concentrate Terms section below. See Technical Disclosure section for AgEq and AISC calculation methodology.
LOM Production & AISC:
https://www.globenewswire.com/NewsRoom/AttachmentNg/dc1da013-9e05-4a0a-a7af-78b58ef8af4a
Note – Au/Pb/Zn production is shown on an AgEq basis based on: Ag = $22/oz, Au = $1,600/oz, Pb = $1.00/lb and Zn = $1.20/lb
OPERATIONS:
Mining:
The mine plan incorporates accelerated stripping as well as stockpiling of low-grade material in order to optimize the grade profile over the LOM.
Processing:
Processing was broken into two phases to optimize the capital efficiency of the project.
Annual Throughput (Mt/a) | PHASE 1 | PHASE 2 | ||||
Year -1 | Year 1 | Year 2 | Year 3 | Year 4 | Year 5+ | |
Oxides / Heap Leach (Crushed) | 5.0 | 5.0 | 5.0 | 5.0 | – | – |
Sulphides / Milling | – | 5.8 | 7.2 | 7.2 | 10.8 | 14.4 |
Total Tonnes | 5.0 | 10.8 | 12.2 | 12.2 | 10.8 | 14.4 |
Head grades:
The mine plan focuses on feeding higher grades to the mill earlier in the mine life:
HEAD GRADES | UNIT | PHASE 1 | PHASE 2 | LOM | |
Year 1 – 4 | Year 5 – 12 | Year 13 – 16 | |||
Oxides | |||||
Tonnes processed | (Mt) | 25 | 4 | – | 29 |
Ag | (g/t) | 37 | 29 | – | 36 |
Au | (g/t) | 0.08 | 0.05 | – | 0.08 |
AgEq | (g/t) | 43 | 33 | – | 42 |
Sulphides | |||||
Tonnes processed | (Mt) | 31 | 115 | 52 | 199 |
Ag | (g/t) | 57 | 32 | 13 | 31 |
Au | (g/t) | 0.26 | 0.07 | 0.04 | 0.09 |
Pb | (%) | 0.80 | 0.50 | 0.17 | 0.46 |
Zn | (%) | 0.80 | 0.92 | 0.34 | 0.75 |
AgEq | (g/t) | 118 | 88 | 34 | 80 |
Note – Phase 1 and LOM Oxide tonnes/grades include tonnes processed on the heap leach in Year -1
Recoveries:
SULPHIDE RECOVERIES (weighted average) | PHASE 1 | PHASE 2 | LOM | |
Year 1 – 4 | Year 5 – 12 | Year 13 – 16 | ||
Ag | 92% | 83% | 67% | 84% |
Au | 19% | 19% | 19% | 19% |
Pb | 90% | 86% | 69% | 86% |
Zn | 85% | 86% | 74% | 85% |
Tailings Management Facility:
CONCENTRATE TERMS:
Metal Payable:
Ag | Au | Pb | Zn | |||||
Pb Concentrate | ||||||||
Average concentrate grade LOM | 2,900 g/t | 1.6 g/t | 52 | % | – | |||
Payable metal | 95 | % | 95 | % | 95 | % | – | |
Minimum deduction | 50 g/t | 1 g/t | 3 units | – | ||||
Zn Concentrate | ||||||||
Average concentrate grade LOM | 300 g/t | 0.5 g/t | – | 51 | % | |||
Payable metal | 70 | % | 70 | % | – | 85 | % | |
Deduction | 3 oz/t | 1 g/t | – | – |
Treatment/Refining Charges:
PARAMETER | UNITS | PEA COST | SPOT | 2021 BENCHMARK |
TREATMENT/REFINING CHARGES | ||||
Treatment charge – Pb con | $/dmt | $100 | ~$60 | $140 |
Treatment charge – Zn con | $/dmt | $200 | ~$80 | $160 |
Ag refining charge – Pb con | $/oz | $1.00 | ~$0.75 | $1.50 |
Concentrate Transportation:
CAPITAL EXPENDITURES:
Initial Capital (for parallel processing of crushed oxides and sulphides)
Expansion Capital (to expand plant to 14.4 Mtpa sulphides only)
Sustaining Capital
DESCRIPTION (all in US$ millions) | INITIAL CAPITAL | EXPANSION CAPITAL | SUSTAINING LOM CAPEX | TOTAL LOM CAPEX |
||
Year -2 | Year -1 | Year 3 | Year 8 | |||
CAPITAL EXPENDITURES | ||||||
Mining | $26 | $1 | $7 | $33 | ||
Infrastructure | $34 | $9 | $10 | $16 | $69 | |
Heap Leach + Oxide Plant | $71 | $1 | $4 | $76 | ||
Sulphide Processing Plant | $95 | $51 | $23 | $30 | $199 | |
Tailings Facility (TMF) | $15 | $95 | $110 | |||
Indirects | $22 | $30 | $17 | $6 | $4 | $78 |
Owners Costs | $6 | $6 | ||||
Closure (net of Salvage Value) | $22 | $22 | ||||
Contingency | $28 | $30 | $16 | $6 | $29 | $110 |
Capital Expenditures – Subtotals | $187 | $181 | $94 | $35 | $208 | $704 |
$368 | ||||||
PRE-SULPHIDE OPERATIONS | ||||||
Revenue | $121 | |||||
Mining Costs | ($110) | |||||
Process + G&A Costs | ($27) | |||||
Operating Cash Flow for Year -1 | ($16) | |||||
NET FUNDING REQUIREMENT | $384 | |||||
OPERATING COST ASSUMPTIONS:
Mining:
Processing and G&A Costs:
PARAMETER | UNITS | PEA COST |
OPERATING COSTS | ||
Mining – Mill Feed | $/t mined | $2.16 |
Mining – Waste | $/t mined | $2.04 |
Processing – Heap leach crushed | $/t stacked | $3.84 |
Processing – Heap leach ROM | $/t stacked | $1.39 |
Processing – Milling (7.2 Mtpa) | $/t milled | $7.01 |
Processing – Milling (14.4 Mtpa) | $/t milled | $6.57 |
Site G&A (14.4 Mtpa) | $/t milled | $0.86 |
OPPORTUNITIES:
Work completed during the preparation of the PEA outlined a number of opportunities that have the potential to improve the economic and ESG performance of the project:
Class | Tonnes | Grade | Contained Metal | ||||||||
Ag | Au | Pb | Zn | AgEq | Ag | Au | Pb | Zn | AgEq | ||
(Mt) | (g/t) | (g/t) | (%) | (%) | (g/t) | (Moz) | (koz) | (Mlb) | (Mlb) | (Moz) | |
Measured | 33 | 15 | 0.06 | 0.21 | 0.42 | 38 | 16 | 63 | 151 | 306 | 40 |
Indicated | 187 | 16 | 0.04 | 0.23 | 0.45 | 40 | 94 | 221 | 952 | 1,869 | 238 |
M&I | 220 | 16 | 0.04 | 0.23 | 0.45 | 39 | 110 | 284 | 1,103 | 2,175 | 278 |
Inferred | 106 | 14 | 0.03 | 0.19 | 0.38 | 34 | 48 | 97 | 445 | 897 | 117 |
Note – the full Resource is provided in the Appendix; further details can be found in the Company’s October 21, 2021, press release.
TECHNICAL DISCLOSURE:
About Discovery:
Discovery’s flagship project is its 100%-owned Cordero project, one of the world’s largest silver deposits. The PEA completed in November 2021 demonstrates that Cordero has the potential to be developed into a highly capital efficient mine that offers the combination of margin, size and scaleability. Cordero is located close to infrastructure in a prolific mining belt in Chihuahua State, Mexico. Continued exploration and project development at Cordero is supported by an industry leading balance sheet with cash of over C$75 million. Discovery was a recipient of the 2020 TSX Venture 50 award and the 2021 OTCQX Best 50 award.
APPENDIX A – MINERAL RESOURCE ESTIMATE
SULPHIDE RESOURCE (assumed to be processed via mill/flotation)
NSR $/t cut-off |
Class | Tonnes | Grade | Contained Metal | ||||||||
Ag | Au | Pb | Zn | AgEq | Ag | Au | Pb | Zn | AgEq | |||
(Mt) | (g/t) | (g/t) | (%) | (%) | (g/t) | (Moz) | (koz) | (Mlb) | (Mlb) | (Moz) | ||
$7.25/t | Measured | 128 | 22 | 0.08 | 0.31 | 0.52 | 52 | 89 | 328 | 881 | 1,470 | 212 |
Indicated | 413 | 19 | 0.05 | 0.28 | 0.51 | 47 | 255 | 707 | 2,543 | 4,663 | 625 | |
M&I | 541 | 20 | 0.06 | 0.29 | 0.51 | 48 | 344 | 1,035 | 3,424 | 6,132 | 837 | |
Inferred | 108 | 14 | 0.03 | 0.19 | 0.38 | 34 | 49 | 99 | 451 | 909 | 119 |
OXIDE/TRANSITION RESOURCE (assumed to be processed by heap leaching)
NSR $/t cut-off |
Class | Tonnes | Grade | Contained Metal | % Oxide / % Trans |
||||
Ag | Au | AgEq | Ag | Au | AgEq | ||||
(Mt) | (g/t) | (g/t) | (g/t) | (Moz) | (koz) | (Moz) | |||
$4.78/t | Measured | 23 | 20 | 0.06 | 25 | 15 | 43 | 19 | 92% / 8% |
Indicated | 75 | 19 | 0.05 | 23 | 45 | 125 | 56 | 87% / 13% | |
M&I | 98 | 19 | 0.05 | 23 | 60 | 168 | 74 | 88% / 12% | |
Inferred | 35 | 16 | 0.04 | 20 | 18 | 44 | 22 | 63% / 37% |
SUPPORTING TECHNICAL DISCLOSURE FOR RESOURCE:
APPENDIX B: AFTER-TAX NPV / IRR / PAYBACK SENSITIVITIES
Sensitivity of the Project’s NPV, IRR and payback at different Ag and Zn price assumptions is outlined in the table below. For these sensitivities the Au and Pb prices have been fixed at $1,600/oz and $1.00/lb respectively. The Base Case scenario for the PEA is highlighted in grey below and assumes Ag – $22.00/oz, Au – $1,600/oz, Pb – $1.00/lb and Zn – $1.20/lb.
Ag ($/oz) | |||||||||||||||||||||
$18.00 | $20.00 | $22.00 | $25.00 | $30.00 | |||||||||||||||||
NPV (5%) |
IRR | Payback | NPV (5%) |
IRR | Payback | NPV (5%) |
IRR | Payback | NPV (5%) |
IRR | Payback | NPV (5%) |
IRR | Payback | |||||||
(US$M) | (%) | (yrs) | (US$M) | (%) | (yrs) | (US$M) | (%) | (yrs) | (US$M) | (%) | (yrs) | (US$M) | (%) | (yrs) | |||||||
Zn ($/lb) |
$1.05 | $715 | 27.2 | % | 3.3 | $866 | 31.5 | % | 2.7 | $1,016 | 35.8 | % | 2.2 | $1,238 | 42.0 | % | 1.8 | $1,607 | 52.5 | % | 1.4 |
$1.10 | $765 | 28.2 | % | 3.2 | $915 | 32.4 | % | 2.6 | $1,064 | 36.6 | % | 2.1 | $1,286 | 42.8 | % | 1.8 | $1,655 | 53.2 | % | 1.4 | |
$1.20 | $863 | 30.0 | % | 3.1 | $1,013 | 34.1 | % | 2.5 | $1,160 | 38.2 | % | 2.0 | $1,382 | 44.3 | % | 1.7 | $1,751 | 54.5 | % | 1.4 | |
$1.30 | $961 | 31.7 | % | 2.9 | $1,109 | 35.8 | % | 2.3 | $1,257 | 39.7 | % | 2.0 | $1,478 | 45.7 | % | 1.7 | $1,848 | 55.8 | % | 1.4 | |
$1.45 | $1,105 | 34.2 | % | 2.7 | $1,253 | 38.1 | % | 2.2 | $1,401 | 42.0 | % | 1.9 | $1,622 | 47.8 | % | 1.6 | $1,992 | 57.8 | % | 1.3 |
APPENDIX C – PIT OPTIMISATION PARAMETERS:
The PEA mine plan was based on a pit optimization that utilised the following parameters:
PARAMETER | UNITS | Ag | Au | Pb | Zn | ||||||||
COMMODITY PRICES | $/oz or $/lb | $ | 20.00 | $ | 1,600 | $ | 0.95 | $ | 1.05 | ||||
ROYALTY | % | 0.5 | % | 0.5 | % | – | – | ||||||
PIT SLOPE ASSUMPTIONS | Five sectors were modeled based on core logging and two geotechnical holes with inter-ramp angles ranging from 40o to 59o | ||||||||||||
PROCESS RECOVERIES | |||||||||||||
Heap Leach (Oxide/Transition) | % | 60 | % | 70 | % | – | – | ||||||
Flotation (Sulphide) | |||||||||||||
Breccia – Volcanic | |||||||||||||
Recovery to Pb concentrate | % | 79 | % | 13 | % | 91 | % | – | |||||
Recovery to Zn concentrate | % | 11 | % | 7 | % | – | 88 | % | |||||
Breccia – Sedimentary | |||||||||||||
Recovery to Pb concentrate | % | 75 | % | 12 | % | 89 | % | – | |||||
Recovery to Zn concentrate | % | 9 | % | 4 | % | – | 86 | % | |||||
Volcanic | |||||||||||||
Recovery to Pb concentrate | % | 70 | % | 13 | % | 85 | % | – | |||||
Recovery to Zn concentrate | % | 13 | % | 6 | % | – | 81 | % | |||||
Sedimentary | |||||||||||||
Recovery to Pb concentrate | % | 70 | % | 13 | % | 83 | % | – | |||||
Recovery to Zn concentrate | % | 10 | % | 5 | % | – | 89 | % | |||||
METAL PAYABLE | |||||||||||||
Dore (Heap Leach) | 98 | % | 99.9 | % | – | – | |||||||
Concentrate (Flotation) | |||||||||||||
Pb concentrate | 95 | % | 95 | % | 95 | % | – | ||||||
Zn concentrate | 70 | % | 70 | % | – | 85 | % | ||||||
OPERATING COSTS | Base | Per 10m below 1550m elev. | |||||||||||
Mining cost – Mill Feed | $/t mined | $ | 1.54 | +$ | 0.024 | ||||||||
Mining cost – Waste | $/t mined | $ | 1.64 | +$ | 0.024 | ||||||||
Processing cost – Heap leach (14,000 tpd) | $/t stacked | $ | 3.92 | ||||||||||
Processing cost – Flotation (40,000 tpd) | $/t milled | $ | 6.39 | ||||||||||
G&A (40,000 tpd) | $/t milled | $ | 0.86 | ||||||||||
TREATMENT/REFINING CHARGES | |||||||||||||
Treatment charge – Pb con | $/dmt | $ | 100 | ||||||||||
Treatment charge – Zn con | $/dmt | $ | 200 | ||||||||||
Ag refining charge – Pb con | $/oz | $ | 1.00 |
APPENDIX D – LOM MINE PLAN SUMMARY
https://www.globenewswire.com/NewsRoom/AttachmentNg/8166015b-ee80-4827-b8e3-23bacc987d76
APPENDIX E – LOM PROCESS THROUGHPUT SUMMARY
https://www.globenewswire.com/NewsRoom/AttachmentNg/8166015b-ee80-4827-b8e3-23bacc987d76
APPENDIX F – SIMPLIFIED PROCESS FLOWSHEETS
https://www.globenewswire.com/NewsRoom/AttachmentNg/b88056d2-d72a-4018-bf8f-b849b808fdc9
PHASE 1:
https://www.globenewswire.com/NewsRoom/AttachmentNg/885c2668-aea9-4dea-ba22-ed401e1821c3
PHASE 2:
https://www.globenewswire.com/NewsRoom/AttachmentNg/cb701e57-5f13-428e-8935-165e82a05cea
APPENDIX G – METALLURGICAL BALANCE SUMMARY
UNITS | PHASE 1 | PHASE 2 | LOM | ||||||||||||||||||||||||||||||
Years 1 – 4 | Years 5 – 12 | Years 13 – 16 | |||||||||||||||||||||||||||||||
Ag | Au | Pb | Zn | Ag | Au | Pb | Zn | Ag | Au | Pb | Zn | Ag | Au | Pb | Zn | ||||||||||||||||||
MET BALANCE | |||||||||||||||||||||||||||||||||
Average head grade | g/t or % | 57 | 0.26 | 0.80 | 0.80 | 32 | 0.07 | 0.50 | 0.92 | 13 | 0.04 | 0.17 | 0.34 | 31 | 0.09 | 0.46 | 0.75 | ||||||||||||||||
Recovered to Pb Con | % | 81 | % | 13 | % | 90 | % | 6 | % | 71 | % | 13 | % | 86 | % | 6 | % | 56 | % | 13 | % | 69 | % | 3 | % | 73 | % | 13 | % | 86 | % | 5 | % |
Recovered to Zn Con | % | 12 | % | 6 | % | 3 | % | 85 | % | 12 | % | 6 | % | 3 | % | 86 | % | 11 | % | 6 | % | 3 | % | 74 | % | 12 | % | 6 | % | 3 | % | 85 | % |
Tailings | % | 7 | % | 81 | % | 7 | % | 9 | % | 17 | % | 81 | % | 11 | % | 8 | % | 33 | % | 81 | % | 28 | % | 22 | % | 16 | % | 81 | % | 11 | % | 10 | % |
Total | % | 100 | % | 100 | % | 100 | % | 100 | % | 100 | % | 100 | % | 100 | % | 100 | % | 100 | % | 100 | % | 100 | % | 100 | % | 100 | % | 100 | % | 100 | % | 100 | % |
CONCENTRATE GRADES | |||||||||||||||||||||||||||||||||
Pb Concentrate | g/t or % | 3,490 | 2.5 | 54 | % | – | 2,802 | 1.1 | 52 | % | – | 2,657 | 2.1 | 43 | % | – | 2,939 | 1.6 | 52 | % | – | ||||||||||||
Zn Concentrate | g/t or % | 524 | 1.3 | – | 52 | % | 254 | 0.3 | – | 51 | % | 285 | 0.5 | – | 50 | % | 298 | 0.5 | – | 51 | % | ||||||||||||
APPENDIX H – LONG SECTIONS / CROSS SECTIONS:
https://www.globenewswire.com/NewsRoom/AttachmentNg/5771cce0-8ad4-46df-8646-38d597111fd2
LONG SECTION A-A’ (looking NW)
https://www.globenewswire.com/NewsRoom/AttachmentNg/3c5a9654-d929-49f3-aa0e-7848e33ba990
LONG SECTION B-B’ (looking NW)
https://www.globenewswire.com/NewsRoom/AttachmentNg/f6c7f47c-cba9-4350-971d-2811424eae5e
CROSS SECTION C-C’ (looking NE)
https://www.globenewswire.com/NewsRoom/AttachmentNg/15065795-2109-4f47-9c2b-bd5929581770
CROSS SECTION D-D’ (looking NE)
https://www.globenewswire.com/NewsRoom/AttachmentNg/bf7ee835-3444-44b1-8cd4-5cb9f9c9d951
CROSS SECTION E-E’ (looking NE)
https://www.globenewswire.com/NewsRoom/AttachmentNg/1b503900-7edc-4827-9b5d-7372bc5ebe8d
APPENDIX I – SITE LAYOUT:
https://www.globenewswire.com/NewsRoom/AttachmentNg/a92066eb-ca65-4ac8-91f5-fba03c554b65
APPENDIX J – PRODUCTION & CASH FLOW SCHEDULE:
Units | Total/Avg | Y-2 | Y-1 | Y1 | Y2 | Y3 | Y4 | Y5 | Y6 | Y7 | Y8 | Y9 | Y10 | Y11 | Y12 | Y13 | Y14 | Y15 | Y16 | Y17+ | |
MINING |
Mineralized Material Mined | mt | 228 | 1 | 14 | 23 | 18 | 18 | 24 | 18 | 19 | 19 | 19 | 21 | 16 | 12 | 5 | 0 | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
Waste Mined | mt | 491 | 6 | 41 | 49 | 49 | 47 | 41 | 47 | 46 | 41 | 44 | 40 | 26 | 10 | 3 | 0 | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
Total Material Mined | mt | 719 | 8 | 55 | 72 | 67 | 65 | 65 | 65 | 65 | 60 | 63 | 61 | 42 | 22 | 8 | 0 | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
Mining Rate | ktpd | 137 | 22 | 157 | 206 | 192 | 186 | 186 | 186 | 186 | 171 | 181 | 175 | 121 | 62 | 22 | 1 | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
Strip Ratio | w:o | 2.2 | 5.2 | 2.8 | 2.2 | 2.7 | 2.7 | 1.8 | 2.5 | 2.5 | 2.2 | 2.3 | 1.9 | 1.6 | 0.8 | 0.6 | 0.1 | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
PROCESSING | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
CRUSHED OXIDES / HEAP LEACH: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Heap Leach Crushed Tonnes | mt | 20 | — | 5 | 5 | 5 | 5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
Stacked Grades: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ag | g/t | 42 | — | 58 | 38 | 35 | 35 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
Au | g/t | 0.09 | — | 0.08 | 0.10 | 0.09 | 0.08 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
AgEq | g/t | 48 | — | 64 | 46 | 41 | 41 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
ROM OXIDES / HEAP LEACH: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Heap Leach ROM Tonnes | mt | 9 | — | — | — | — | — | 5 | 4 | 0 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
Stacked Grades: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ag | g/t | 24 | — | — | — | — | — | 18 | 28 | 44 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
Au | g/t | 0.06 | — | — | — | — | — | 0.07 | 0.05 | 0.08 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
AgEq | g/t | 28 | — | — | — | — | — | 23 | 32 | 50 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
SULPHIDES / FLOTATION: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Milling Rate | ktpd | 36 | — | — | 16 | 21 | 21 | 31 | 41 | 41 | 41 | 41 | 41 | 41 | 41 | 41 | 41 | 41 | 41 | 26 | — | ||||||||||||||||||||||||||||||||||||||||
Sulphide Tonnes Processed | mt | 199 | — | — | 6 | 7 | 7 | 11 | 14 | 14 | 14 | 14 | 14 | 14 | 14 | 14 | 14 | 14 | 14 | 9 | — | ||||||||||||||||||||||||||||||||||||||||
Mill Head Grade: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ag | g/t | 31 | — | — | 62 | 63 | 61 | 48 | 35 | 34 | 31 | 30 | 43 | 37 | 29 | 23 | 13 | 13 | 13 | 12.6 | — | ||||||||||||||||||||||||||||||||||||||||
Au | g/t | 0.09 | — | — | 0.19 | 0.41 | 0.36 | 0.15 | 0.07 | 0.08 | 0.07 | 0.07 | 0.08 | 0.07 | 0.07 | 0.06 | 0.04 | 0.04 | 0.04 | 0.04 | — | ||||||||||||||||||||||||||||||||||||||||
Pb | % | 0.46 | % | — | — | 0.74 | % | 1.04 | % | 0.91 | % | 0.62 | % | 0.46 | % | 0.52 | % | 0.39 | % | 0.39 | % | 0.66 | % | 0.67 | % | 0.53 | % | 0.37 | % | 0.17 | % | 0.16 | % | 0.16 | % | 0.16 | % | — | |||||||||||||||||||||||
Zn | % | 0.75 | % | — | — | 0.92 | % | 0.79 | % | 0.74 | % | 0.77 | % | 0.86 | % | 0.92 | % | 0.79 | % | 0.81 | % | 1.33 | % | 1.15 | % | 0.90 | % | 0.62 | % | 0.36 | % | 0.34 | % | 0.34 | % | 0.34 | % | — | |||||||||||||||||||||||
AgEq | g/t | 80 | — | — | 132 | 155 | 143 | 107 | 87 | 90 | 78 | 78 | 119 | 106 | 84 | 62 | 35 | 33 | 33 | 33 | — | ||||||||||||||||||||||||||||||||||||||||
Lead Concentrate – Recovery: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ag | % | 73 | % | — | — | 81 | % | 82 | % | 82 | % | 77 | % | 71 | % | 71 | % | 70 | % | 70 | % | 79 | % | 72 | % | 67 | % | 66 | % | 56 | % | 56 | % | 56 | % | 56 | % | — | |||||||||||||||||||||||
Au | % | 13 | % | — | — | 13 | % | 13 | % | 13 | % | 13 | % | 13 | % | 13 | % | 13 | % | 13 | % | 13 | % | 13 | % | 13 | % | 13 | % | 13 | % | 13 | % | 13 | % | 13 | % | — | |||||||||||||||||||||||
Pb | % | 86 | % | — | — | 90 | % | 91 | % | 90 | % | 90 | % | 85 | % | 87 | % | 85 | % | 85 | % | 89 | % | 88 | % | 87 | % | 84 | % | 69 | % | 69 | % | 69 | % | 69 | % | — | |||||||||||||||||||||||
Zinc Concentrate – Recovery: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ag | % | 12 | % | — | — | 12 | % | 11 | % | 12 | % | 12 | % | 12 | % | 12 | % | 12 | % | 12 | % | 12 | % | 12 | % | 12 | % | 12 | % | 11 | % | 11 | % | 11 | % | 11 | % | — | |||||||||||||||||||||||
Au | % | 6 | % | — | — | 6 | % | 6 | % | 6 | % | 6 | % | 6 | % | 6 | % | 6 | % | 6 | % | 6 | % | 6 | % | 6 | % | 6 | % | 6 | % | 6 | % | 6 | % | 6 | % | — | |||||||||||||||||||||||
Zn | % | 85 | % | — | — | 86 | % | 86 | % | 85 | % | 84 | % | 86 | % | 86 | % | 86 | % | 86 | % | 88 | % | 88 | % | 87 | % | 81 | % | 74 | % | 74 | % | 74 | % | 74 | % | — | |||||||||||||||||||||||
PRODUCTION PROFILE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
METAL PRODUCED: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ag – Oxides | moz | 17 | — | 5 | 3 | 3 | 3 | 1 | 1 | 0 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
Au – Oxides | koz | 42 | — | 8 | 10 | 9 | 8 | 3 | 2 | 0 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
AgEq – Oxides Metal Produced | moz | 20 | — | 6 | 4 | 4 | 4 | 1 | 2 | 0 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
Ag – Sulphides | moz | 167 | — | — | 11 | 14 | 13 | 15 | 13 | 13 | 12 | 11 | 18 | 14 | 10 | 8 | 4 | 4 | 4 | 2.5 | — | ||||||||||||||||||||||||||||||||||||||||
Au – Sulphides | koz | 113 | — | — | 6 | 18 | 15 | 10 | 6 | 7 | 6 | 6 | 7 | 6 | 6 | 6 | 4 | 4 | 4 | 2 | — | ||||||||||||||||||||||||||||||||||||||||
Pb – Sulphides | mlbs | 1,727 | — | — | 84 | 149 | 130 | 132 | 123 | 145 | 106 | 105 | 187 | 187 | 145 | 100 | 38 | 36 | 36 | 23 | — | ||||||||||||||||||||||||||||||||||||||||
Zn – Sulphides | mlbs | 2,773 | — | — | 100 | 108 | 100 | 154 | 235 | 251 | 215 | 221 | 369 | 320 | 248 | 159 | 84 | 79 | 79 | 51 | — | ||||||||||||||||||||||||||||||||||||||||
AgEq – Sulphides Metal Produced | moz | 405 | — | — | 20 | 28 | 26 | 30 | 32 | 34 | 29 | 29 | 47 | 41 | 31 | 22 | 11 | 10 | 10 | 6.5 | — | ||||||||||||||||||||||||||||||||||||||||
Ag – Total | moz | 185 | — | 5 | 14 | 17 | 16 | 16 | 15 | 13 | 12 | 11 | 18 | 14 | 10 | 8 | 4 | 4 | 4 | 2.5 | — | ||||||||||||||||||||||||||||||||||||||||
Au – Total | koz | 155 | — | 8 | 17 | 26 | 23 | 13 | 9 | 7 | 6 | 6 | 7 | 6 | 6 | 6 | 4 | 4 | 4 | 2 | — | ||||||||||||||||||||||||||||||||||||||||
Pb – Total | mlbs | 1,727 | — | — | 84 | 149 | 130 | 132 | 123 | 145 | 106 | 105 | 187 | 187 | 145 | 100 | 38 | 36 | 36 | 23 | — | ||||||||||||||||||||||||||||||||||||||||
Zn – Total | mlbs | 2,773 | — | — | 100 | 108 | 100 | 154 | 235 | 251 | 215 | 221 | 369 | 320 | 248 | 159 | 84 | 79 | 79 | 51 | — | ||||||||||||||||||||||||||||||||||||||||
AgEq – Total Metal Produced | moz | 426 | — | 6 | 25 | 32 | 29 | 31 | 34 | 34 | 29 | 29 | 47 | 41 | 31 | 22 | 11 | 10 | 10 | 6.5 | — | ||||||||||||||||||||||||||||||||||||||||
METAL PAYABLE: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ag – Oxides | moz | 17 | — | 5 | 3 | 3 | 3 | 1 | 1 | 0 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
Au – Oxides | koz | 42 | — | 8 | 10 | 9 | 8 | 3 | 2 | 0 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
AgEq – Oxides Metal Payable | moz | 20 | — | 6 | 4 | 4 | 4 | 1 | 2 | 0 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||||||
Ag – Sulphides | moz | 148 | — | — | 10 | 12 | 12 | 13 | 12 | 11 | 10 | 10 | 16 | 12 | 9 | 7 | 4 | 3 | 3 | 2 | — | ||||||||||||||||||||||||||||||||||||||||
Au – Sulphides | koz | 41 | — | — | 2 | 10 | 9 | 3 | 1 | 0 | 1 | 1 | 5 | 4 | 0 | 1 | 1 | 1 | 1 | 1 | — | ||||||||||||||||||||||||||||||||||||||||
Pb – Sulphides | mlbs | 1,626 | — | — | 80 | 141 | 123 | 124 | 116 | 136 | 100 | 99 | 176 | 177 | 136 | 94 | 36 | 33 | 33 | 21 | — | ||||||||||||||||||||||||||||||||||||||||
Zn – Sulphides | mlbs | 2,340 | — | — | 84 | 91 | 84 | 130 | 198 | 212 | 181 | 186 | 312 | 271 | 209 | 134 | 70 | 67 | 67 | 43 | — | ||||||||||||||||||||||||||||||||||||||||
AgEq – Sulphides Metal Payable | moz | 352 | — | — | 18 | 25 | 23 | 26 | 28 | 29 | 25 | 25 | 41 | 36 | 27 | 19 | 9 | 9 | 9 | 6 | — | ||||||||||||||||||||||||||||||||||||||||
Ag – Total | moz | 165 | — | 5 | 13 | 16 | 15 | 14 | 13 | 11 | 10 | 10 | 16 | 12 | 9 | 7 | 4 | 3 | 3 | 2 | — | ||||||||||||||||||||||||||||||||||||||||
Au – Total | koz | 83 | — | 8 | 12 | 19 | 16 | 6 | 3 | 1 | 1 | 1 | 5 | 4 | 0 | 1 | 1 | 1 | 1 | 1 | — | ||||||||||||||||||||||||||||||||||||||||
Pb – Total | mlbs | 1,626 | — | — | 80 | 141 | 123 | 124 | 116 | 136 | 100 | 99 | 176 | 177 | 136 | 94 | 36 | 33 | 33 | 21 | — | ||||||||||||||||||||||||||||||||||||||||
Zn – Total | mlbs | 2,340 | — | — | 84 | 91 | 84 | 130 | 198 | 212 | 181 | 186 | 312 | 271 | 209 | 134 | 70 | 67 | 67 | 43 | — | ||||||||||||||||||||||||||||||||||||||||
AgEq – Total Metal Payable | moz | 372 | — | 6 | 22 | 28 | 27 | 27 | 30 | 29 | 25 | 25 | 41 | 36 | 27 | 19 | 9 | 9 | 9 | 6 | — | ||||||||||||||||||||||||||||||||||||||||
REVENUE | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
OXIDE REVENUES: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ag Revenue | US$mm | $ | 376 | — | $ | 112 | $ | 74 | $ | 67 | $ | 68 | $ | 22 | $ | 29 | $ | 3 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||
Au Revenue | US$mm | $ | 67 | — | $ | 13 | $ | 17 | $ | 14 | $ | 13 | $ | 6 | $ | 4 | $ | 0 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||
Gross Revenue – Oxides | US$mm | $ | 443 | — | $ | 126 | $ | 91 | $ | 82 | $ | 81 | $ | 27 | $ | 33 | $ | 3 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||
Treatment & Refining Charges | US$mm | $ | 18 | — | $ | 5 | $ | 3 | $ | 3 | $ | 3 | $ | 1 | $ | 1 | $ | 0 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||
Net Revenue – Oxides | US$mm | $ | 425 | — | $ | 121 | $ | 87 | $ | 78 | $ | 78 | $ | 26 | $ | 32 | $ | 3 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||
SULPHIDE REVENUES: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ag Revenue | US$mm | $ | 3,250 | — | — | $ | 212 | $ | 275 | $ | 264 | $ | 292 | $ | 261 | $ | 249 | $ | 225 | $ | 220 | $ | 345 | $ | 274 | $ | 200 | $ | 158 | $ | 78 | $ | 75 | $ | 75 | $ | 48 | — | |||||||||||||||||||||||
Au Revenue | US$mm | $ | 66 | — | — | $ | 3 | $ | 16 | $ | 14 | $ | 5 | $ | 1 | $ | 1 | $ | 2 | $ | 2 | $ | 7 | $ | 6 | $ | 0 | $ | 1 | $ | 2 | $ | 2 | $ | 2 | $ | 1 | — | |||||||||||||||||||||||
Pb Revenue | US$mm | $ | 1,626 | — | — | $ | 80 | $ | 141 | $ | 123 | $ | 124 | $ | 116 | $ | 136 | $ | 100 | $ | 99 | $ | 176 | $ | 177 | $ | 136 | $ | 94 | $ | 36 | $ | 33 | $ | 33 | $ | 21 | — | |||||||||||||||||||||||
Zn Revenue | US$mm | $ | 2,808 | — | — | $ | 101 | $ | 110 | $ | 101 | $ | 156 | $ | 238 | $ | 255 | $ | 217 | $ | 224 | $ | 375 | $ | 325 | $ | 251 | $ | 160 | $ | 84 | $ | 80 | $ | 80 | $ | 51 | — | |||||||||||||||||||||||
Gross Revenue – Sulphides | US$mm | $ | 7,751 | — | — | $ | 396 | $ | 541 | $ | 502 | $ | 577 | $ | 616 | $ | 641 | $ | 544 | $ | 544 | $ | 903 | $ | 782 | $ | 588 | $ | 414 | $ | 200 | $ | 191 | $ | 191 | $ | 122 | — | |||||||||||||||||||||||
Treatment & Refining Charges | US$mm | $ | 780 | — | — | $ | 33 | $ | 43 | $ | 39 | $ | 51 | $ | 64 | $ | 68 | $ | 57 | $ | 58 | $ | 96 | $ | 84 | $ | 65 | $ | 44 | $ | 22 | $ | 21 | $ | 21 | $ | 14 | — | |||||||||||||||||||||||
Total Penalties | US$mm | $ | 33 | — | — | $ | 1 | $ | 1 | $ | 1 | $ | 2 | $ | 3 | $ | 3 | $ | 2 | $ | 2 | $ | 4 | $ | 4 | $ | 3 | $ | 2 | $ | 1 | $ | 1 | $ | 1 | $ | 1 | — | |||||||||||||||||||||||
Net Revenue – Sulphides | US$mm | $ | 6,938 | — | — | $ | 362 | $ | 497 | $ | 461 | $ | 524 | $ | 550 | $ | 570 | $ | 485 | $ | 484 | $ | 803 | $ | 695 | $ | 520 | $ | 368 | $ | 177 | $ | 168 | $ | 168 | $ | 108 | — | |||||||||||||||||||||||
Net Revenue – Total | US$mm | $ | 7,364 | — | $ | 121 | $ | 449 | $ | 575 | $ | 539 | $ | 550 | $ | 581 | $ | 573 | $ | 485 | $ | 484 | $ | 803 | $ | 695 | $ | 520 | $ | 368 | $ | 177 | $ | 168 | $ | 168 | $ | 108 | — | ||||||||||||||||||||||
OPERATING COSTS | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
UNIT COSTS: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Mine (Includes Rehandling Costs) | US$/t Moved | $ | 2.23 | — | $ | 2.00 | $ | 1.92 | $ | 1.91 | $ | 1.88 | $ | 1.90 | $ | 1.97 | $ | 2.03 | $ | 2.06 | $ | 2.16 | $ | 2.35 | $ | 2.45 | $ | 2.35 | $ | 1.86 | $ | 1.16 | $ | 1.03 | $ | 1.03 | $ | 1.23 | — | ||||||||||||||||||||||
Processing – Crushed Oxide Heap Leach | US$/t Stacked | $ | 3.84 | — | $ | 3.84 | $ | 3.84 | $ | 3.84 | $ | 3.84 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |||||||||||||||||||||||||||||||||||
Processing – ROM Oxide Heap Leach | US$/t Stacked | $ | 1.34 | — | — | — | — | — | $ | 1.29 | $ | 1.39 | $ | 1.44 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||
Processing – Sulphide | US$/t Milled | $ | 6.59 | — | — | $ | 7.13 | $ | 7.01 | $ | 7.01 | $ | 6.58 | $ | 6.47 | $ | 6.47 | $ | 6.47 | $ | 6.47 | $ | 6.57 | $ | 6.57 | $ | 6.57 | $ | 6.57 | $ | 6.57 | $ | 6.57 | $ | 6.57 | $ | 6.57 | — | |||||||||||||||||||||||
Site G&A Costs | US$/t Processed | $ | 0.85 | — | $ | 1.45 | $ | 0.94 | $ | 0.83 | $ | 0.83 | $ | 1.14 | $ | 0.86 | $ | 0.86 | $ | 0.86 | $ | 0.86 | $ | 0.86 | $ | 0.86 | $ | 0.86 | $ | 0.86 | $ | 0.86 | $ | 0.86 | $ | 0.86 | $ | 0.86 | — | ||||||||||||||||||||||
OPERATING COSTS INCURED: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Mine (Includes Rehandling Costs) | US$mm | $ | 1,602 | — | $ | 110 | $ | 147 | $ | 133 | $ | 128 | $ | 136 | $ | 135 | $ | 136 | $ | 131 | $ | 143 | $ | 144 | $ | 107 | $ | 62 | $ | 32 | $ | 17 | $ | 15 | $ | 15 | $ | 11 | — | ||||||||||||||||||||||
Processing – Crushed Oxide Heap Leach | US$mm | $ | 77 | — | $ | 19 | $ | 19 | $ | 19 | $ | 19 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |||||||||||||||||||||||||||||||||||
Processing – ROM Oxide Heap Leach | US$mm | $ | 12 | — | — | — | — | — | $ | 6 | $ | 6 | $ | 0 | — | — | — | — | — | — | — | — | — | — | — | ||||||||||||||||||||||||||||||||||||
Processing – Sulphides | US$mm | $ | 1,309 | — | — | $ | 41 | $ | 50 | $ | 50 | $ | 71 | $ | 93 | $ | 93 | $ | 93 | $ | 93 | $ | 95 | $ | 95 | $ | 95 | $ | 95 | $ | 95 | $ | 95 | $ | 95 | $ | 61 | — | |||||||||||||||||||||||
Site G&A Costs | US$mm | $ | 194 | — | $ | 7 | $ | 10 | $ | 10 | $ | 10 | $ | 12 | $ | 12 | $ | 12 | $ | 12 | $ | 12 | $ | 12 | $ | 12 | $ | 12 | $ | 12 | $ | 12 | $ | 12 | $ | 12 | $ | 8 | — | ||||||||||||||||||||||
Total Operating Costs | US$mm | $ | 3,193 | — | $ | 136 | $ | 218 | $ | 213 | $ | 208 | $ | 226 | $ | 246 | $ | 242 | $ | 236 | $ | 248 | $ | 251 | $ | 214 | $ | 169 | $ | 139 | $ | 124 | $ | 122 | $ | 122 | $ | 80 | — | ||||||||||||||||||||||
NSR – Government | US$mm | $ | 18 | — | $ | 1 | $ | 1 | $ | 2 | $ | 2 | $ | 2 | $ | 1 | $ | 1 | $ | 1 | $ | 1 | $ | 2 | $ | 1 | $ | 1 | $ | 1 | $ | 0 | $ | 0 | $ | 0 | $ | 0 | — | ||||||||||||||||||||||
Concentrate Transportation | US$mm | $ | 527 | — | — | $ | 21 | $ | 29 | $ | 26 | $ | 34 | $ | 42 | $ | 46 | $ | 38 | $ | 38 | $ | 64 | $ | 58 | $ | 46 | $ | 31 | $ | 15 | $ | 14 | $ | 14 | $ | 9 | — | |||||||||||||||||||||||
Total Costs | US$mm | $ | 3,738 | — | $ | 137 | $ | 240 | $ | 244 | $ | 236 | $ | 261 | $ | 289 | $ | 290 | $ | 275 | $ | 287 | $ | 317 | $ | 273 | $ | 216 | $ | 171 | $ | 139 | $ | 137 | $ | 137 | $ | 90 | — | ||||||||||||||||||||||
CASH COSTS: | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Co-Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating Cash Costs | US$/oz AgEq | $ | 8.34 | — | — | $ | 9.82 | $ | 7.52 | $ | 7.84 | $ | 8.22 | $ | 8.34 | $ | 8.27 | $ | 9.56 | $ | 10.04 | $ | 6.12 | $ | 6.01 | $ | 6.34 | $ | 7.39 | $ | 13.61 | $ | 14.07 | $ | 14.07 | $ | 14.40 | — | |||||||||||||||||||||||
Total Cash Costs | US$/oz AgEq | $ | 12.07 | — | — | $ | 12.57 | $ | 10.29 | $ | 10.55 | $ | 11.47 | $ | 12.10 | $ | 12.31 | $ | 13.52 | $ | 14.06 | $ | 10.17 | $ | 10.13 | $ | 10.63 | $ | 11.50 | $ | 17.91 | $ | 18.34 | $ | 18.34 | $ | 18.67 | — | |||||||||||||||||||||||
All-in Sustaining Costs | US$/oz AgEq | $ | 12.35 | — | — | $ | 12.98 | $ | 11.40 | $ | 10.76 | $ | 11.65 | $ | 12.20 | $ | 12.64 | $ | 13.65 | $ | 14.24 | $ | 10.27 | $ | 10.21 | $ | 10.74 | $ | 11.66 | $ | 18.24 | $ | 19.12 | $ | 18.69 | $ | 19.85 | — | |||||||||||||||||||||||
CAPITAL EXPENDITURES | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Initial/Expansion Capex | US$mm | $497 | $187 | $181 | — | — | $94 | — | — | — | — | $35 | — | — | — | — | — | — | — | — | |||||||||||||||||||||||||||||||||||||||||
Sustaining Capex (incl. Closure net of Salvage) | US$mm | $208 | — | — | $9 | $31 | $6 | $36 | $3 | $10 | $3 | $4 | $31 | $3 | $3 | $3 | $3 | $31 | $3 | $7 | $22 | ||||||||||||||||||||||||||||||||||||||||
Total Capital Expenditures | US$mm | $704 | $187 | $181 | $9 | $31 | $99 | $36 | $3 | $10 | $3 | $39 | $31 | $3 | $3 | $3 | $3 | $31 | $3 | $7 | $22 | ||||||||||||||||||||||||||||||||||||||||
FREE CASH FLOW VALUATION | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Net Revenue | US$mm | $7,364 | — | $121 | $449 | $575 | $539 | $550 | $581 | $573 | $485 | $484 | $803 | $695 | $520 | $368 | $177 | $168 | $168 | $108 | — | ||||||||||||||||||||||||||||||||||||||||
Operating Expenses | US$mm | ($3,193) | — | ($136) | ($218) | ($213) | ($208) | ($226) | ($246) | ($242) | ($236) | ($248) | ($251) | ($214) | ($169) | ($139) | ($124) | ($122) | ($122) | ($80) | — | ||||||||||||||||||||||||||||||||||||||||
Royalties + Concentrate Transportation | US$mm | ($545) | — | ($1) | ($23) | ($31) | ($28) | ($35) | ($43) | ($48) | ($39) | ($39) | ($66) | ($59) | ($47) | ($31) | ($16) | ($15) | ($15) | ($10) | — | ||||||||||||||||||||||||||||||||||||||||
EBITDA | US$mm | $3,625 | — | ($16) | $209 | $331 | $303 | $289 | $292 | $284 | $210 | $196 | $485 | $422 | $304 | $198 | $37 | $32 | $32 | $19 | — | ||||||||||||||||||||||||||||||||||||||||
Capital Expenditures | US$mm | ($704) | ($187) | ($181) | ($9) | ($31) | ($99) | ($36) | ($3) | ($10) | ($3) | ($39) | ($31) | ($3) | ($3) | ($3) | ($3) | ($31) | ($3) | ($7) | ($22) | ||||||||||||||||||||||||||||||||||||||||
Pre-Tax Free Cash Flow | US$mm | $2,921 | ($187) | ($198) | $200 | $300 | $204 | $253 | $289 | $274 | $207 | $157 | $455 | $419 | $301 | $195 | $34 | $1 | $29 | $12 | ($22) | ||||||||||||||||||||||||||||||||||||||||
Mining Tax | US$mm | (273) | — | — | ($16) | ($25) | ($23) | ($22) | ($22) | ($21) | ($16) | ($15) | ($36) | ($32) | ($23) | ($15) | ($3) | ($2) | ($2) | ($1) | — | ||||||||||||||||||||||||||||||||||||||||
Income Tax Payable | US$mm | (784) | — | — | ($9) | ($68) | ($64) | ($51) | ($62) | ($58) | ($46) | ($47) | ($120) | ($110) | ($82) | ($52) | ($8) | — | ($4) | ($2) | — | ||||||||||||||||||||||||||||||||||||||||
Post-Tax Free Cash Flow | US$mm | $1,864 | ($187) | ($198) | $175 | $207 | $117 | $180 | $205 | $195 | $145 | $95 | $299 | $277 | $196 | $127 | $23 | ($2) | $22 | $8 | ($22) | ||||||||||||||||||||||||||||||||||||||||
Pre-Tax | Post-Tax | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
NPV (5%) | US$mm | $1,858 | $1,160 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
IRR | % | 50.3% | 38.2% | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Payback | Yrs | 1.6 | 2.0 |
Commerce Resources Corp. (TSX-V: CCE) (FSE: D7H0) is pleased to... READ MORE
North Bay Resources, Inc. (OTC: NBRI) is pleased to announce a re... READ MORE
NevGold Corp. (TSX-V:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) is pleas... READ MORE
G2 Goldfields Inc. (TSX: GTWO) (OTCQX: GUYGF) is pleased to annou... READ MORE
Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) announced fi... READ MORE