The Prospector News

DIOS hits interesting copper drilling intercepts on K2 project, James Bay, Quebec

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

DIOS hits interesting copper drilling intercepts on K2 project, James Bay, Quebec

 

 

 

 

 

Dios Exploration drilled significant copper intercepts in Fall program completed on October 21 on K2, James Bay, southwest of favourable gold-bearing Patwon & Barrick shears in dacite (volcanics) and gabbro/quartz porphyry bodies. Copper metal is necessary to decarbonization and energy transition, such as lithium.

 

Dios hit 35.2 m @ 1645 ppm Cu &1.93 g/t Ag and 28.5 m @ 1032 ppm Cu & 0.28 g/t Ag.

 

Extensive one km long PP-5 conductor was well outlined by last Fall IP survey, also coincidental with Badji showing (5.05% copper 5.39 g/t gold, 111 g/t silver with cm pyrite-chalcopyrite stringers in foliated and strongly sericitized dacite) and historical SDBJ showing (1.08% Cu & 13.8 g/t Ag). PP-5 was tested by 6 holes (1 to 5 & 11) cutting several decametric silicified dacite with disseminated PY-PO-CPY (& stringers) and QFP (quartz-feldspar porphyry) with 1-5% disseminated (& stringers) pyrite.

 

HOLE
K2-22-
FROM TO copper
ppm
gold (g/t) Silver
(g/t)
  INTERVAL (M) ROCK TYPE MINERALIZATION
1 75.80 76.30 1015 0.193 1.9   0.50 QFP 3% Pyrite stringers
1 166.35 166.85 312 0.195 1.5   0.50 DACITE 5% PY stringers
1 206.00 206.50 500 0.243 1.2   0.50 QFP 2% PY disseminated
2 171.50 172.00 645 0.139 0.9   0.50 GABBRO 3% PY 1% ChalcoPyrite
3 15.76 51.00 1645 0.013 1.93   35.24 DACITE 1% PY, TR-1% CPY
3 27.00 28.05 5870 0.060 6.0   1.05 DACITE 1% PY, 1-2% CPY
3 48.00 49.00 8490 0.086 10.1   1.00 DACITE 1% PO, 1-2% CPY
3 206.00 206.50 96 0.424 0.4   0.50 DACITE 1% PY, TR-CPY
4 8.00 36.50 1032 0.024 1.28   28.50 DACITE 1% PO, TR-1% CPY
4 19.80 20.55 3400 0.141 4.7   0.75 DACITE 1-2% PO-PY, 1%CPY
5 111.00 129.15   0.005     28.15 QFP SIlica++ 4-5% PY
11 117.75 156.85   0.005     39.10 QFP SIlica- BO- 1-5%PY
11 169.60 170.35 2350 0.057     0.75 QFP 20%PO 5%CPY strgs

 

Hole 10 hit 3.64g/t gold, 1.11g/t silver, 0.55% zinc over 0.5 m in volcanic tuff with 1-2% PO-SP (-CPY) stringers (120-120.5 m depth) along 400 m-long PP-10 IP conductor.   Such tuff represents a volcanism break, follow-up should be pursued this horizon extent.

 

Some 600m west of PP-10 and 300 m south of PP-5, 800m-long PP-9 conductor in strike with Shiva showings yielded 2.12 gold and 1.35g/t Au from sulfurized dacites intruded by gabbro dykes. PP-9 drilled by holes 06 &07 includes following results:

 

HOLE
K2-22-
FROM
(m)
TO
(m)
AU (G/T) INTERVAL
(m)
Rock type MINERALISATION
6 37.00 37.50 0.738 0.50 GABBRO 5%PO, TR-CPY in qz-cb veinlet
6 74.50 75.50 0.164 1.00 DACITE 10%PY,1%PO, TR-CPY in qz-cb vein
6 83.50 84.10 0.281 0.60 DACITE SI+
v6 230.50 231.00 2.20 0.50 QFP 5%PO, 5%SP in qz-cb vein
7 92.45 93.00 0.324 0.95 DACITE 1%CPY,1%PY-PO in qz-cb vein
7 120.50 121.00 0.324 0.50 DACITE Cm qz vein

 

Further NE, hole 13 hit 20-40% pyrite in a 0.5m-thick dacitic tuff (37.75-38.25m). About 200m north, prospecting returned 2.19 & 1.24g/t gold from grab-samples on quartz-pyrite-chalcopyrite veins.

 

Along the 600m-long PP-1 conductor, 2022 surface prospecting yielded 1.425, 0.747 and 0.535g/t gold from mineralized quartz veins in (or in contact to) the gabbro. Hole 12 cut a foliated gabbro with 5% quartz-carbonate veinlets-veins & 0.5-1% PO-PY (6-114.25m).

 

The 500m-long PP-3 was tested by K2-22-08, intersecting a sheared gabbro with 3-4% quartz-carbonate veinlets & 1% PO, TR-CPY (33.50-48.55m).

 

A few km SW, Dios had discovered up to 8.28 % Cu at Kali Lake, 3.71 % Cu at Attila (8.08 g/t Au) and 6.42 % Cu at Curry.

 

Dios just received the report dated February 15 from its Geological Consultants on prospecting, rock sampling and diamond drilling. Dios drilled 13 holes for 2540 meters by helicopter on ten favourable Induced Polarization conductors, associated with surface gold-silver-copper grab-samples and/or soil-samples. Prospecting on IP conductors in September and drilling program ended October 21, with last core sent to ALS Val d’Or in mid-November, was supervised by Harold Desbiens M.Sc. P.Geo & 43-101 QP. (1304 core samples (10% blanks) and 101 grab samples (not representative of whole property).

 

Dios also currently works on 4-5 lithium projects with significant lithium inprint signature and other critical elements in James Bay, Quebec. Lithium metal is necessary to decarbonization and energy transition.

 

Posted February 26, 2023

Share this news article

MORE or "UNCATEGORIZED"


NMG Completes Previously Announced US$309.5 Million Equity Financing Package Confirming FID for the Phase-2 Matawinie Mine

Nouveau Monde Graphite Inc. (NYSE: NMG) (TSX: NOU) is pleased to ... READ MORE

May 15, 2026

Koryx Copper Announces Further Significant Drill Results for the Haib Copper Project, Southern Namibia

Highlights  17 drill holes reported with consistent, wide interc... READ MORE

May 15, 2026

Liberty Gold Receives C$8.0 Million from Warrant Exercises Strengthening Funding Position for Black Pine

Liberty Gold Corp. (TSX: LGD) (OTCQX: LGDTF) is pleased to announ... READ MORE

May 15, 2026

GoldHaven Closes Additional Flow-Through Financing Bringing Total Flow-Through Proceeds to Approximately $3.26 Million to Advance Planned 5,000+ Metre Magno Drill Program

GoldHaven Resources Corp. (CSE: GOH) (OTCQB: GHVNF) (FSE: 4QS) is... READ MORE

May 15, 2026

LODE GOLD'S NEW MINERAL RESOURCE ESTIMATE: 1.11 MOZ OF GOLD - 18.8 MT AT 1.84 G/T AU (MEASURED & INDICATED) AND 1.99 MOZ OF GOLD (INFERRED) - 33.1 MT AT 1.86 G/T AU AT FREMONT GOLD MINE

Lode Gold Resources Inc (TSX-V: LOD) (OTCQB: LODFF) is pleased to... READ MORE

May 15, 2026

Copyright 2026 The Prospector News