The Prospector News

Deep Semi Massive Sulphide Zinc, Silver and Gold Intersection at Berrigan Property

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Deep Semi Massive Sulphide Zinc, Silver and Gold Intersection at Berrigan Property

Chibougamau Independent Mines Inc. (TSX-V: CBG) (Frankfurt: CLL1) (OTC: CMAUF), herein called Chibougamau, is pleased to update shareholders as regards recent drilling reported by TomaGold Corporation (TSX-V: LOT) (OTCPK: TOGOF) on the Berrigan property located west of the town of Chibougamau, under option from Chibougamau Independent Mines Inc. Updated option terms were published in a Chibougamau Independent press release dated September 30, 2025 accessible by clicking here.

Tomagold has published assay results for two drill holes TOM-25-015 and TOM-25-014 as follows:

  • Drill hole TOM-25-015 (from 451.20 m): 5.75% ZnEq (1.34 g/t AuEq) over 98.5 m
    • Including: 26.67% ZnEq (6.26 g/t AuEq) over 4.90 m
    • Including: 7.26% ZnEq (1.69 g/t AuEq) over 49.35 m
    • Including: 10.26% ZnEq (2.39 g/t AuEq) over 14.60 m, 9.94% ZnEq (2.31 g/t AuEq) over 3.25 m, and 14.82% ZnEq (3.45 g/t AuEq) over 6.20 m
  • Drill hole TOM-25-015 confirms the discovery of a new major semi-massive sulfide zone, named Berrigan Deep, which remains open at depth 
  • Drill hole TOM-25-014 (from 185 m): 28.69% ZnEq (6.73 g/t AuEq) over 2.10 m

For more details, shareholders may access the Tomagold press release by clicking here.

Tomagold states that “Drill hole TOM-25-015, grading 5.75% ZnEq (1.34 g/t AuEq) over 98.5 m, is truly transforming the Berrigan Mine project and highlights a new semi-massive sulfide zone that extends at depth beneath the known zones. This very encouraging result suggests the presence of a large mineralized system that remains open at depth.”

The drill holes contain significant secondary silver and gold mineralization. The table below provides the breakdown of individual assays.

Results from drill holes TOM-025-014 and TOM-025-015: Berrigan Mine project

 

Hole ID From
(m)
To
(m)
Length
(m)
ZnEq
(%)
AuEq
(g/t)
Au
(g/t)
Ag
(g/t)
Cu
(ppm)
Zn
(ppm)
TOM-25-014 185.00 187.10 2.10 28.69 6.73 4.94 56.44 545 45509
238.70 239.85 1.15 23.29 5.43 2.63 22.20 1590 104000
251.20 252.60 1.40 41.79 9.80 7.44 37.30 552 80400
405.30 406.70 1.40 14.99 3.48 1.13 13.15 655 92514
423.30 426.30 3.00 2.34 0.54 0.07 5.45 493 15700
451.50 457.50 6.00 1.34 0.31 0.08 3.45 77 7882
TOM-25-015 132.55 141.00 8.45 4.22 0.99 0.51 5.51 338 16610
155.70 157.70 2.00 31.75 7.42 4.66 26.90 684 102850
182.10 202.20 20.10 2.55 0.60 0.36 3.20 265 7687
451.20 549.70 98.50 5.75 1.34 0.82 3.21 386 19751
including 452.20 457.10 4.90 26.67 6.26 4.69 18.80 2897 47876
and including 500.35 549.70 49.35 7.26 1.69 0.90 3.48 310 31250
Including 521.00 535.60 14.60 10.26 2.39 1.34 5.91 420 41158
Including 537.85 541.10 3.25 9.94 2.31 0.88 3.85 529 58200
Including 542.00 548.20 6.20 14.82 3.45 1.63 5.26 511 74276

Notes:

  • The reported widths represent core lengths. True width is estimated to be approximately 80-85% of the core length, depending on the deviation angles.
  • ZnEq and AuEq are calculated using the Company’s standard parameters.
  • AuEq calculation was based on US$4150/oz Au, $51.36/oz Ag, US$5.044/lb. Cu and $1.398/lb Zn. AuEq = Au g/t + (Ag g/t × 0.01237) + (Cu ppm × 0.000083) + (Zn ppm × 0.000023). The use of AuEq is to calculate cut-off grades for exploration purposes, and no adjustments were made for metal recovery. The Company is currently in the initial exploration phase, following historical drilling. At this stage, the Company does not have any metallurgical data and no comparative studies have been conducted, given the geological complexity of the ultramafic host rock. Furthermore, the Company is not aware of any deposits that may have similar geological characteristics.
  • ZnEq calculation was based on US$4047/oz Au, $50.22/oz Ag, US$4.796/lb. Cu and $1.390/lb Zn. ZnEq = Zn ppm + (Ag g/t × 527) + (Au g/t x 42466) + (Cu ppm × 3.45) / 10,000. The use of ZnEq is to calculate cut-off grades for exploration purposes, and no adjustments were made for metal recovery. The Company is currently in the initial exploration phase, following historical drilling. At this stage, the Company does not have any metallurgical data and no comparative studies have been conducted, given the geological complexity of the ultramafic host rock. Furthermore, the Company is not aware of any deposits that may have similar geological characteristics.

 

 

Drill Hole TOM-25-015: A Major Discovery at Depth

 

 

We Seek Safe Harbour. CUSIP Number 167101 203
LEI 529900GYUP9EBEF7U709
For further information, contact:
Jack Stoch, P.Geo., Acc.Dir.
President & CEO
Chibougamau Independent Mines Inc.
86, 14th Street
Rouyn-Noranda, Quebec Canada J9X 2J1
Tel.: 819.797.5242
Fax: 819.797.1470
info@chibougamaumines.com
www.chibougamaumines.com
Posted January 30, 2026

Share this news article

MORE or "UNCATEGORIZED"


Eloro Resources Announces Closing of Bought Deal LIFE Private Placement for Gross Proceeds of C$17 Million

Eloro Resources Ltd. (TSX: ELO) (FSE: P2QM) is pleased to announce the closing of its previously an... READ MORE

March 6, 2026

Minera Alamos Updates Resources and Reserves for the Pan Gold Mine in Nevada

Minera Alamos Inc. (TSX-V: MAI) (OTCQX: MAIFF) is pleased to announce updated Mineral Resource and M... READ MORE

March 6, 2026

Ero Copper Reports Fourth Quarter and Full Year 2025 Operating and Financial Results

Ero Copper Corp. (TSX: ERO) (NYSE: ERO) is pleased to announce its operating and financial results f... READ MORE

March 6, 2026

Rare Element Resources Announces Results of Oversubscribed Rights Offering of Common Shares

Rare Element Resources Ltd. (OTCQB: REEMF) is pleased to report that its previously announced... READ MORE

March 6, 2026

TRX Gold Reports Record Q2 2026 Production and Company Update

TRX Gold Corporation (TSX: TRX) (NYSE American: TRX) is pleased to announce preliminary resu... READ MORE

March 6, 2026

Copyright 2026 The Prospector News