The Prospector News

Dakota Gold Intersects High-Grade Gold Mineralization in Expansion Drilling at Richmond Hill

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Dakota Gold Intersects High-Grade Gold Mineralization in Expansion Drilling at Richmond Hill

Dakota Gold Corp. (NYSE American: DC) is pleased to report assay results from 26 drill holes completed as part of its ongoing 2025 drilling campaign at the Richmond Hill Oxide Heap Leach Gold Project. These results include the first assays from expansion drilling in the northeast corner of the Project.

Drilling continues to confirm high-grade gold mineralization in the northern portion of Richmond Hill, supporting the Company’s plan to prioritize initial mining in this area. Dakota Gold currently has two drills operating on site and expects to complete approximately 27,500 meters (~90,000 feet) of drilling during the 2025 campaign.

 

Highlights from this update include:

  • Expansion and infill drill holes in the northeastern corner of the Project area are intersecting significantly higher-grade gold than the average resource grade including RH25C-278 intersecting 1.75 grams per tonne gold over 19.9 meters (35 gram meters) and RH25C-295 intersecting 2.15 g/t Au over 30.0 meters (65 gram meters). The expansion drilling surrounding the area has the potential to add to the resource based on prior drilling and current resources in the area. The mineralization in the northeast is only limited by drilling and remains open.
  • Metallurgical drill holes across the northern Project area continue to intercept high-grade gold, de-risking the Project and providing greater confidence in the resource including RH25C-270 intersecting 2.26 g/t Au over 29.2 meters (66 gram meters) and RH25C-288 intersecting 4.15 g/t Au over 14.5 meters (60 gram meters). The metallurgical drilling results demonstrate the low-risk nature of the deposit with widespread mineralization.

 

“The drill results announced today continue to validate the scale and quality of Richmond Hill, which hosts one of the largest undeveloped heap leach gold resources in the United States” said Jack Henris, President and COO of Dakota Gold. “The continuity and pervasive nature of the near surface deposit support a project that is low-cost, long-life, and delivers high-margins, as highlighted in our Initial Assessment with Cash Flow earlier this year. With metallurgical drilling for the 2025 campaign now complete, we are advancing heap leach column testing and look forward to sharing those results as they are completed.”

The Company’s core drilling remains active in the northeast Project area where we will have additional assay results from expansion and infill of the unconstrained mineralization through the fourth quarter of 2025 and into 2026. The core drilling on the Project is designed to collect metallurgical samples for column testing, condemnation drilling beneath proposed site infrastructure for mine planning, infill drilling to upgrade the existing resource, and expansion drilling where the resource remains open. The drill results will inform both the oxide and sulfide resource updates for the Feasibility Study.

The group of assay results reported today in Figure 1 include assay results from metallurgical drilling in the northern Project area. The drill results will refine the modelled boundaries and improve the precision of the geo-metallurgical domains for the Feasibility and mine planning. In addition, the holes were designed to acquire samples for metallurgical tests ranging from low to high-grade, various rock types, as well as oxide, transitional, and sulfide so that composites can be made for heap leach column tests.

 

Figure 1. Plan Map of Dakota Gold Corp. Richmond Hill 2025 Drill Campaign Highlighted Drill Results in Northern Project Area

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8218/275101_7a4ee10914b8aaf4_002full.jpg

 

Table 1. Richmond Hill Drill Results (Metric / Imperial)1,2,3,4

Hole # From
(m)
To
(m)
Interval (m) Grade
(g/t)
g x m From
(ft)
To
(ft)
Interval
(ft)
Grade
(oz/ton)
Program
RH25C-247 No Significant Results Condemnation
RH25C-252 No Significant Results Condemnation
RH25C-256 36.4 48.9 12.5 3.76 47 119.5 160.4 40.9 0.110 Metallurgical
inc. 36.4 38.0 1.6 23.20 37 119.5 124.7 5.2 0.677
RH25C-263 78.6 82.9 4.3 0.91 4 258.0 272.0 14.0 0.026 Infill
90.8 97.7 6.9 1.04 7 298.0 320.5 22.5 0.030
RH25C-264 60.7 69.2 8.5 1.56 13 199.0 227.0 28.0 0.045 Metallurgical
73.9 81.2 7.3 1.57 11 242.5 266.3 23.8 0.046
RH25C-265 No Significant Results Condemnation
RH25C-268 15.2 20.4 5.2 0.68 4 50.0 67.0 17.0 0.020 Metallurgical
39.7 57.5 17.7 0.94 17 130.3 188.5 58.2 0.027
RH25C-270 30.5 59.7 29.2 2.26 66 100.1 196.0 95.9 0.066 Metallurgical
RH25C-273 13.3 16.6 3.4 0.62 2 43.6 54.6 11.0 0.018 Infill
21.7 28.5 6.9 0.90 6 71.1 93.6 22.5 0.026
RH25C-275 No Significant Results Expansion
RH25C-276 No Significant Results Metallurgical
RH25C-278 4.0 23.8 19.9 1.75 35 13.0 78.2 65.2 0.051 Expansion
RH25C-279 4.6 8.8 4.2 0.71 3 15.0 28.9 13.9 0.021 Expansion
13.4 16.9 3.5 0.88 3 44.0 55.4 11.4 0.026
RH25C-279A 11.0 21.2 10.2 2.11 22 36.2 69.7 33.5 0.062 Expansion
RH25C-281 3.1 7.9 4.8 1.01 5 10.3 25.9 15.6 0.029 Infill
14.8 26.8 12.0 1.80 22 48.5 87.8 39.3 0.053
RH25C-282 No Significant Results Expansion
RH25C-283 40.6 45.7 5.1 0.66 3 133.2 149.9 16.7 0.019 Metallurgical
50.6 57.4 6.9 0.77 5 165.9 188.4 22.5 0.023
RH25C-284 No Significant Results Expansion
RH25C-285 No Significant Results Expansion
RH25C-287 49.7 52.7 3.0 0.77 2 163.0 173.0 10.0 0.023 Metallurgical
57.4 63.9 6.5 0.92 6 188.2 209.5 21.3 0.027
RH25C-288 46.0 50.1 4.1 2.41 10 150.8 164.4 13.6 0.070 Metallurgical
53.5 55.8 2.3 1.81 4 175.5 183.0 7.5 0.053
61.9 78.3 16.5 0.58 10 203.0 257.0 54.0 0.017
87.7 102.2 14.5 4.15 60 287.7 335.4 47.7 0.121
inc. 92.2 93.5 1.2 29.20 36 302.6 306.6 4.0 0.852
RH25C-289 48.1 55.6 7.5 2.04 15 157.7 182.3 24.6 0.059 Expansion
59.3 67.7 8.4 1.89 16 194.6 222.0 27.4 0.055
RH25C-292 0.6 14.7 14.1 0.93 13 2.0 48.3 46.3 0.027 Expansion
RH25C-293 2.5 16.9 14.4 0.75 11 8.3 55.5 47.2 0.022 Expansion
RH25C-294 60.7 65.4 4.7 1.38 6 199.2 214.6 15.4 0.040 Metallurgical
RH25C-295 5.5 35.4 30.0 2.15 65 17.9 116.3 98.4 0.063 Infill

The table may contain rounding errors.

  1. Abbreviations in the table include ounces per ton; grams per tonne; feet; meter; and gram meters.
  2. True thickness unknown.
  3. Intervals calculated based on 0.5 g/t Au cut-off and maximum dilution of 3.05 meters.
  4. The July 7, 2025 Initial Assessment with Cash Flow has an open pit designed with 12.2m (40 ft) benches. The average grade for the Measured and Indicated mine plan is 0.566 g/t Au (0.017 oz/ton). A gram meter of 7 and above has been highlighted in Table 1 based on the bench height and average grade.

 

About Dakota Gold Corp.

Dakota Gold is expanding the legacy of the 145-year-old Homestake Gold Mining District by advancing the Richmond Hill Oxide Heap Leach Gold Project to commercial production as soon as 2029, and outlining a high-grade underground gold resource at the Maitland Gold Project, both located on private land in South Dakota.

Subscribe to Dakota Gold’s e-mail list at www.dakotagoldcorp.com to receive the latest news and other Company updates.

 

Shareholder and Investor Inquiries

For more information, please contact:

Jack Henris
President and COO
Tel: +1 605-717-2540

Shawn Campbell
Chief Financial Officer
Tel: +1 778-655-9638

Carling Gaze
VP of Investor Relations and Corporate Communications
Tel: +1 605-679-7429
Email: info@dakotagoldcorp.com

Posted November 19, 2025

Share this news article

MORE or "UNCATEGORIZED"


Moon River Moly Ltd. Announces Preliminary Economic Assessment of Potential Restart of 25% Owned Endako Molybdenum Mine

HIGHLIGHTS: Pre-tax net present value of $1.1 billion, internal r... READ MORE

November 21, 2025

Kuya Silver Reports Third Quarter 2025 Results

Kuya Silver Corporation (CSE: KUYA) (OTCQB: KUYAF) (FSE: 6MR1) is... READ MORE

November 21, 2025

Prospector Closes $38 Million Financing

Prospector Metals Corp. (TSX-V: PPP) (OTCQB: PMCOF) (FSE: 1ET) announce... READ MORE

November 21, 2025

LUNDIN GOLD DRILLS 491.62 G/T AU OVER 5.20M; EXPLORATION CONFIRMS LARGER MINERALIZED SYSTEMS AT BOTH FDNS AND FDN EAST

Lundin Gold Inc. (TSX: LUG) (Nasdaq Stockholm: LUG) (OTCQX: LUGDF... READ MORE

November 21, 2025

Cascada Signs MOUs to Acquire Three Advanced Copper-Gold Porphyry Properties in Chile

Cascada Silver Corp. (CSE: CSS) (OTCQB: CSSCF) is pleased to anno... READ MORE

November 21, 2025

Copyright 2025 The Prospector News