
Critical Metals Corp. (Nasdaq: CRML) a leading critical minerals mining company, is pleased to publish the assay results from the Tanbreez Project in Greenland from its 2024 drilling program.
Summary of Reported Drill Hole Results
Hole ID | Depth From | Depth To | Interval | HREO% | TREO% | ZrO2 % | ZrO2TREO ratio | Ta2O5 ppm | Nb2O5 ppm | Ga2O5 ppm |
A1-24 | – | 40.00 | 40.00 | 0.13 | 0.48 | 1.86 | 3.82 | 134 | 1,513 | 103 |
A2-24 | – | 41.00 | 41.00 | 0.14 | 0.52 | 1.96 | 3.66 | 145 | 1,685 | 96 |
B-24 | – | 58.00 | 58.00 | 0.13 | 0.50 | 1.99 | 3.92 | 144 | 1,661 | 101 |
C-24 | – | 65.00 | 65.00 | 0.14 | 0.55 | 1.98 | 3.60 | 156 | 1,741 | 89 |
Grade Cutoff | 0.30 |
Table 1 – 2024 Assay results summary for DDH-A2-24, DDH-B-24, DDH-C-24 and DDH A1-2
Hole ID | Depth (m) | TREO (%) | HREO (% ) | ZrO₂ (%) | Ga₂O₃ (ppm) |
DDH-A1-24 | 40.00 | 0.48 | 27.1% | 1.86 | 100 |
DDH-A2-24 | 41.00 | 0.52 | 26.9% | 1.96 | 95 |
DDH-B-24 | 61.30 | 0.50 | 26.0% | 1.99 | 100 |
DDH-C-24 | 65.25 | 0.55 | 25.5% | 1.98 | 90 |
Highlight Summary – drillhole results
All the drill holes were collared within the Fjord Deposit with 23.6MT @ 0.42% TREO for the combined Hill Deposit Maiden Mineral Resource 45MT @ 0.38% TREO including 27% HREO.
Assay results are reported for DDH A1-24, DDH-A2-24, DDH-B-24, and DDH-C-24 and with remaining a further 9 drillholes waiting assay results are expected to be reported in Q3, 2025 (see Table 2).
Commenting on the Tanbreez assay results, Tony Sage, CEO & Executive Chairman of the Company, said:
“These incredible results underscore the strategic value of Tanbreez as a rare earth elements and gallium project with scale, grade, and a high proportion of critical heavy rare earths.
With China’s total control over the rare earth market globally, securing sources of these critical minerals has become paramount for U.S. defence capabilities and national security.
Our project grades are exceptional and fully position Tanbreez as a strategically important asset for critical Western supply chains. These results further prove and progress our geological model vastly. The processing of the 2024 drill cores, and already completing over 1,500 meters of drilling as part of our 2025 Fjord Resource Upgrade program, puts us in a strong position to build on our significant resource base. All drill holes stopped in resource grade material and with further assays pending and more drilling underway, we see strong potential to grow the scale and nature of the project’s mineral inventory.”
Figure 1 – drill hole collar map with 2024 collar positions in green, 2013 collar positions in red and 2025 drill collars in white with star bursts awaiting drilling.
Drill Hole DDH-A2-24
Drilled vertically to 41m from surface and intersected high – grade rare earths and metal oxide mineralization averaging:
Drill Hole DDH-B-24
Drilled vertically to 61.3m from surface and intersected high-grade rare earths and metal oxides mineralisation averaging:
Drill Hole DDH-C-24
Drilled vertically to 65.25m from surface and intersected high-grade rare earths and metal oxides mineralisation averaging:
Drill Hole DDH-A1-24
Drilled vertically to 40m from surface and intersected high – grade rare earths and metal 7 oxides averaging:
HOLE ID | Easting | Northing | R.L. | E.O.H. | AZI. | DECL. |
2024 | FJORD AREA | |||||
A1-24 | 452,648 | 6,748,255 | 19.00 | 40.00 | 0 | 90 |
A2-24 | 452,648 | 6,748,256 | 19.00 | 41.00 | 0 | 90 |
B-24 | 452,672 | 6,748,355 | 7.00 | 61.30 | 0 | 90 |
C-24 | 452,725 | 6,748,305 | 21.00 | 65.25 | 0 | 90 |
D-24 | 452,782 | 6,748,350 | 28.00 | 85.70 | 0 | 90 |
E-24 | 452,726 | 6,748,410 | 9.00 | 62.30 | 0 | 90 |
F-24 | 452,866 | 6,748,303 | 68.00 | 107.45 | 0 | 90 |
G-24 | 452,722 | 6,748,352 | 12.00 | 65.00 | 0 | 90 |
H-24 | 452,951 | 6,748,331 | 77.00 | 150.00 | 0 | 90 |
K-24 | 453,182 | 6,747,925 | 320.00 | 247.37 | 0 | 90 |
O-24 | 452,851 | 6,748,419 | 29.00 | 57.96 | 0 | 90 |
P-24 | 453,123 | 6,748,575 | 43.00 | 97.84 | 0 | 90 |
X-24 | 452,655 | 6,748,246 | 18.00 | 68.00 | 0 | 60 |
Z-24 | 454,527 | 6,750,156 | 98.00 | 167.50 | 0 | 60 |
Table 2 – 2024 diamond drill hole program in the Fjord Area. Assay results are reported for DDH A1-24, DDH-A2-24, DDH-B-24, and DDH-C-24 and with remaining assay results expected to be reported in Q3, 2025.
Background – Fjord Deposit Drilling
The 2024–2025 drilling campaign in the Fjord area has targeted confirmatory and step-out holes to:
All drill holes in this program are vertical, intersecting the sub horizontal layers at true thickness. The four holes reported here return TREO grades between ~0.48% and 0.56% with approximately 27% HREO, along with ZrO₂ values of 1.86–1.96% and gallium oxide contents of 70–100 ppm. These results are consistent with historical assays and demonstrate the persistence of grade and mineralogy across the Fjord deposit.
From a deposit classification perspective, the kakortokite-hosted REE mineralisation is best described as stratiform magmatic, confined entirely to the kakortokite unit and not observed in adjacent lithologies such as lujavrite or naujaite. This strong lithological control underpins confidence in resource modelling, supports bulk mining strategies, and provides reliable input for geology domaining.
Given the continuity of mineralisation over several kilometres, the Fjord deposit represents a significant portion of the overall Tanbreez mineral inventory. Ongoing drilling is expected to further delineate these resources, with pending assays from additional holes likely to extend the known mineralised envelope and refine the grade distribution.
Sampling over the 2024 diamond holes was taken over kakortokite intervals above the Black Madonna lower boundary.
Gallium Results
The gallium oxide Ga2O3 mineralisation assay results ranges from low to high is 90ppm to 100ppm for of the four 2024 drillholes published to date.
Drill holes that were not assayed for gallium, tantalum and niobium in 2013 will be assayed from existing pulps submitted to ALS Metallurgical in Perth for analysis in the coming months.
ALS laboratories will also assay all sample for gallium for the 2024 and 2025 drill holes with results that will be published in September and October 2025. The gallium oxide results for all diamond holes published to date may add a credit to the TREO-HREO mixed concentrate.
Figure 2 – Fjord and Hill Deposit drill hole locations for 2007, 2010, 2013, 2024 in red with 2025 drill hole collars completed in July with 9 diamond holes awaiting drilling.
Resource Confirmation Drilling
On 20 January 2025, the Company announced the REE drilling program of the 2025 diamond drilling program to be conducted over the Fjord prospect at the Tanbreez Project. The drilling program planned 16 holes with a total cumulative length of up to 2,200 m.
This confirmatory drill program was designed to optimize the resource for future mine planning and to extend the notional mine life of the Tanbreez Project.
Additional 2024 diamond drilling core samples have been processed for assaying with ten drill holes awaiting reporting. The results of these assays will be released once ALS laboratories in Perth complete the ICP Fusion analysis for REE, HREE and associated metal oxides, including gallium oxide, which is expected to occur by the middle of September to late October 2025.
The Company recently announced a series of historical diamond drilling results on 28 March 2025, 12 May 2025, 20 May 2025 and 11 June 2025 proving a compelling high-grade TREO and HREO comparison results for deep diamond drill holes to the results for 2024 drilling.
Figure 3 – 2025 drill hole DDH 25-14 August 2025
Figure 4 – 2025 Diamond Drill hole Section showing Fjord drill traces with DDH 25-1 drilled to 297m in Kakortokite (pink) terminated in the basal Tephry (grey) and lower Fjord DDH 25-12, DDH 25-15 and DDH 25-14 planned drilling into the basal unit during August to September 2025.
About Critical Metals Corp.
Critical Metals Corp is a leading mining development company focused on critical metals and minerals, and producing strategic products essential to electrification and next generation technologies for the United States, Europe and their western world partners. Its flagship Project, Tanbreez, is one of the world’s largest rare earth deposits and is located in Southern Greenland. The deposit is expected to have access to key transportation outlets as the area features year-round direct shipping access via deep water fjords that lead directly to the North Atlantic Ocean.
Another key asset is the Wolfsberg Lithium Project located in Carinthia, 270 km south of Vienna, Austria. The Wolfsberg Lithium Project is the first fully permitted mine in Europe and is strategically located with access to established road and rail infrastructure and is expected to be the next major producer of key lithium products to support the European market. Wolfsberg is well positioned with offtake and downstream partners to become a unique and valuable asset in an expanding geostrategic critical metals portfolio.
With this strategic asset portfolio, Critical Metals Corp is positioned to become a reliable and sustainable supplier of critical minerals essential for defense applications, the clean energy transition, and next-generation technologies in the western world.
American Lithium Corp. (TSX-V:LI) (OTCQX:AMLIF) (Frankfurt:5LA1) ... READ MORE
North Peak Resources Ltd. (TSX-V: NPR) (OTCQB: NPRLF) announces t... READ MORE
InZinc Mining Ltd. (TSX-V: IZN) is pleased to report the first re... READ MORE
Fortuna Mining Corp. (NYSE: FSM) (TSX: FVI) is pleased to report ... READ MORE