The Prospector News

Cow Mountain Drilling Intersects High Grade Gold Mineralization

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Cow Mountain Drilling Intersects High Grade Gold Mineralization

 

 

 

 

 

Barkerville Gold Mines Ltd. (TSX-V: BGM) is pleased to announce drilling results from the ongoing 2018 Cow Mountain exploration and category conversion program at the Company’s flagship Cariboo Gold Project. The drilling results demonstrate continuity of high grade gold mineralization within vein corridors.  The Company is currently exploring and delineating high grade vein corridors with four diamond drills on Cow Mountain.

 

 

Selected Drilling Highlights:

 

  • CM-18-005: 28.98 g/t Au over 1.90 meters (visible gold was observed)
  • CM-18-006: 12.47 g/t Au over 5.35 meters
  • CM-18-007: 30.62 g/t Au over 1.80 meters (visible gold was observed)
  • CM-18-007: 76.90 g/t Au over 0.70 meters
  • CM-18-007: 76.90 g/t Au over 0.70 meters
  • CM-18-010: 10.70 g/t Au over 5.85 meters
  • CM-18-012: 24.69 g/t Au over 3.15 meters (visible gold was observed)
  • CM-18-013: 23.18 g/t Au over 3.70 meters
  • CM-18-017: 20.41 g/t Au over 2.95 meters
  • CM-18-018: 109.05 g/t Au over 1.20 meters (visible gold was observed)
  • CM-18-024: 26.33 g/t Au over 4.00 meters
  • CM-18-029: 160.50 g/t Au over 0.85 meters (visible gold was observed)
  • CM-18-029: 39.81 g/t Au over 2.10 meters
  • CM-18-039: 377.00 g/t Au over 0.50 meters
  • CM-18-040: 66.40 g/t Au over 1.30 meters
  • CM-18-043: 19.73 g/t Au over 3.05 meters
  • CM-18-045: 13.07 g/t Au over 5.05 meters
  • CM-18-049: 24.40 g/t Au over 2.20 meters

 

 

Detailed drilling results are presented in the table below. A drill hole location plan map and longitudinal section is presented at the end of this release. The Cow Mountain 3D deposit model with assay highlights is located on the Company’s website.

 

Barkerville Gold Mines Ltd. 3D Deposit Model

 

 

The ongoing drill program at Cow Mountain is designed to infill and expand high-grade gold-mineralized vein corridors modelled in the May 2018 Cow Mountain resource estimate. Vein corridors are defined as a high-density network of mineralized quartz veins within the sandstones.  Mineralized quartz veins on the Cariboo Gold Project are overall sub-vertical dip and northeast strike.  These corridors have been defined from surface to a vertical depth of up to 300 meters and remain open for expansion at depth and down plunge. Gold grades are intimately associated with vein-hosted pyrite as well as pyritic, intensely silicified wall rock haloes in close proximity to the veins.

 

 

Qualified Persons

 

 

Exploration activities at the Cariboo Gold Project are administered on site by the Company’s Project Geologists, Kyle Orr and Felipe Castaneda. As per National Instrument 43-101 Standards of Disclosure for Mineral Projects, Maggie Layman, P.Geo. Vice President Exploration, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting its exploration activities on the Cariboo Gold Project.

 

 

Quality Assurance – Quality Control

 

 

Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged.  The remaining drill core is subsequently stored on site at the Company’s secure facility in Wells, BC.  Numbered security tags are applied to lab shipments for chain of custody requirements.  The Company inserts quality control (QC) samples at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company’s Qualified Person, Maggie Layman, P.Geo, Vice President Exploration.

 

 

Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed and 250 grams is pulverized. Analysis for gold is by 50g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 1,000g screen metallic fire assay. A selected number of samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS).

 

About Barkerville Gold Mines Ltd.

 

 

The Company is focused on developing its extensive mineral rights package located in the historical Cariboo Mining District of central British Columbia. Barkerville’s Cariboo Gold Project mineral tenures cover 1,950 square kilometres; along a strike length of 67 kilometres which includes several past producing placer and hard rock mines, making it one of the most well-endowed land packages in British Columbia. Since the management change in mid-2015, the Company has unlocked the fundamental structural controls of gold mineralization. The Company’s Brownfield’s exploration team is focused on developing and delineating a mineable resource within the 7 kilometers of principle project area located near the town of Wells, British Columbia.  The Company’s Greenfield’s team is developing quality exploration assets throughout the remaining land package through systematic, scientific, exploration.  The operation’s team is focused on developing and mining the Bonanza Ledge and BC Vein deposits on Barkerville Mountain.  This operation allows the company to generate near term cash flow, train a local work force, keeps the present mining permit active, and de-risk’s the project through staged production growth.  Processing of material from these deposits is processed at the QR mill.  QR is a fully owned, permitted mill and tailings facility, located approximately 110 kilometres away from Wells, and can be accessed by an all-season road.

 

Posted September 27, 2018

Share this news article

MORE or "UNCATEGORIZED"


Fission Closes $9.2 Million Bought Deal Financing

FISSION URANIUM CORP. (TSX:FCU) (OTCQX: FCUUF) (FRA: 2FU) is plea... READ MORE

October 4, 2023

New Found Intercepts 17.1 g/t Au Over 11.35m & 1.82 g/t Au Over 40m, Further Defines High-grade Domain at Keats West

New Found Gold Corp.  (TSX-V: NFG) (NYSE-A: NFGC) is pleased to ... READ MORE

October 4, 2023

TASEKO MINES ANNOUNCES THIRD QUARTER COPPER PRODUCTION OF 35 MILLION POUNDS FROM THE GIBRALTAR MINE

Taseko Mines Limited (TSX: TKO) (NYSE American: TGB) (LSE: TKO) i... READ MORE

October 4, 2023

MONUMENTAL MINERALS PROVIDES FINAL RESULTS OF MAIDEN DRILLING PROGRAM AT THE JEMI HEAVY RARE EARTH ELEMENT PROJECT, MEXICO

Monumental Minerals Corp. (TSX-V: MNRL) (FSE: BE5) (OTCQB: MNMRF)... READ MORE

October 4, 2023

ValOre Assays Confirm Palladium-Platinum Discovery at Salvador Target, Pedra Branca Project: 43.85 m at 0.76 g/t 2PGE+Au starting from 45.25 m, incl. 10.85 m at 1.19 g/t 2PGE+Au from 51.3 m

ValOre Metals Corp. (TSX‐V: VO) (OTCQB: KVLQF) (Frankfurt: KEQ0... READ MORE

October 4, 2023

Copyright 2023 The Prospector News