The Prospector News

Chris Temple: September, 2025 BacTech Environmental (CSE-BAC; OTCQB-BCCEF) interview with C.E.O. Ross Orr

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Chris Temple: September, 2025 BacTech Environmental (CSE-BAC; OTCQB-BCCEF) interview with C.E.O. Ross Orr

 

 

 

 

Here, Chris sits down with BacTech’s Ross Orr to get an updated picture of where the company is at these days on two major projects/initiatives:

 

— Its Tenguel Project in Ecuador, now in the stage of looking for the right financing and/or offtake partner. As you’ll see–especially with gold’s price more than doubling since the original Bankable Feasibility Study here–this will be a cash cow for BacTech, local Ecuadorians and shareholders if the company can make it to the finish line!

— More recently, the emerging story of the company’s ability to successfully and economically treat mining waste in various settings is especially exciting and might well become the bigger story going forward.

 

Chris points out that these technologies and some related ones to improve “downstream” processing of ores/tailings and environmental remediation are finally set to enjoy some more notable adoption.

 

Courtesy of the National Investor

Posted September 15, 2025

Share this news article

MORE or "UNCATEGORIZED"


URANIUM ENERGY CORP ANNOUNCES THE CLOSING OF $203 MILLION PUBLIC OFFERING

Proceeds to be Used to Accelerate the Development of theĀ United ... READ MORE

October 6, 2025

Barrick Announces Sale of Interest in Tongon for Up To $305 Million

Barrick Mining Corporation (NYSE:B) (TSX:ABX) announced that it h... READ MORE

October 6, 2025

Aquitaine Metals Drills Broad High-Grade Gold Mineralization: 16.45 g/t gold over 20.00 metres at Limousin Project

Aquitaine Metals Corp. is pleased to announce the first drill res... READ MORE

October 6, 2025

B2Gold Achieves Commercial Production at the Goose Mine

B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) is pleased to announce th... READ MORE

October 6, 2025

Osisko Development Provides Infill Drilling Update on Its 13,000-Meter Lowhee Program at Cariboo Gold Project; Intercepts Include 45.24 G/T Gold Over 3.0 Meters, Including 233.92 G/T Gold Over 0.5 Meters

HIGHLIGHTS 2,279 m of infill drilling completed on 10-m dr... READ MORE

October 6, 2025

Copyright 2025 The Prospector News