The Prospector News

Chieftain Adds to Management Team

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Chieftain Adds to Management Team

 
 
 
 
Chieftain Metals Inc. (TSX:CFB)  announce that Harold Bosche, P.Eng. has joined Chieftain’s owner’s team to complete the optimization phase of the feasibility study for the Tulsequah project.
 

Mr. Bosche has a great depth of experience in the mining industry, including feasibility and detailed design, construction, process plant start-ups, operations and maintenance. During his time as General Manager, Design in the Project Development Division of Placer Dome he worked on projects including: Musselwhite, Pipeline, Zaldivar and other numerous feasibility and upgrade design projects.

 

Mr. Victor Wyprysky, Chieftain’s President and CEO, stated, “We are pleased that Harold will be joining our team. He brings a wealth of knowledge and expertise, and he will play a key role in finalizing our feasibility study as part of the recently announced project finance Memorandum of Understanding with China CAMC Engineering Co., Ltd and its majority owned subsidiary Procon Holdings (Alberta) Inc.”

 

Mr. Bosche will take over responsibilities from Mr. Paul Chawrun, EVP Corporate Development in guiding the feasibility study to completion. Mr. Chawrun has resigned and Chieftain thanks him for his valuable contributions to the Company and wishes him success in his future endeavors.

 

About Chieftain Metals Inc.:

 

Chieftain Metals Inc.’s principal business is the acquisition, exploration and development of mineral properties. Since incorporation, the Company’s business has focused entirely on the acquisition, and thereafter the development, of the Tulsequah Chief Polymetallic Project, in north-western British Columbia, Canada. The Tulsequah Project consists of 38 mineral claims and Crown-grants covering approximately 14,220 hectares and covers two previously producing mines. For more information on the Tulsequah Project, please refer to the Company’s NI 43-101 compliant technical reports, “Tulsequah Chief Deposit, Tulsequah Chief Property, Northern British Columbia” and “Big Bull Project, Tulsequah Chief Property, Technical Report, Northern British Columbia”, each dated as of November 8, 2010 and available under the Company’s profile on SEDAR (www.sedar.com).

Posted September 28, 2012

Share this news article

MORE or "UNCATEGORIZED"


Sirios Extends the Eclipse Zone 400 Metres Downdip and it Remains Completely Open

Sirios Resources Inc. (TSX-V: SOI) (OTCQB: SIREF) is pleased to p... READ MORE

April 17, 2024

New Found Intercepts 14.8 g/t Au Over 5m at Honeypot & 43.1 g/t Au Over 2m at Jackpot

New Found Gold Corp. (TSX-V: NFG) (NYSE-A: NFGC) is pleased to a... READ MORE

April 17, 2024

STLLR Gold Announces Remaining Tower Gold Project Infill Drilling Results

STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) announces the fin... READ MORE

April 17, 2024

AVANTI HELIUM CLOSES SECOND AND FINAL TRANCHE OF PRIVATE PLACEMENT

Avanti Helium Corp. (TSX-V: AVN) (OTC: ARGYF) is pleased to anno... READ MORE

April 17, 2024

PAN GLOBAL INTERSECTS 11 METERS AT 2.36G/T GOLD AND 22 METERS AT 0.41% COPPER, EXPANDING CAÑADA HONDA COPPER-GOLD DISCOVERY, SPAIN

New drill results from Cañada Honda return best gold grade and t... READ MORE

April 17, 2024

Copyright 2024 The Prospector News