The Prospector News

Chakana Reports 268m of 1.17 g/t Gold, 0.55% Copper and 19.2 g/t Silver (1.48% Cu-Eq) in Breccia Pipe 5 from Surface at Soledad, Peru

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Chakana Reports 268m of 1.17 g/t Gold, 0.55% Copper and 19.2 g/t Silver (1.48% Cu-Eq) in Breccia Pipe 5 from Surface at Soledad, Peru

 

 

 

 

 

Soledad Project Highlights Include:

  • 14 resource definition holes at Breccia Pipe 5 (Bx 5) reported totalling 2,052.75m
  • Additional resource definition drill results pending for Bx 5 and Huancarama
  • Site visit with Qualified Person for 43-101 resource estimate completed
  • Gradient-array induced-polarization (IP) geophysical surveys continue

 

Chakana Copper Corp. (TSX-V: PERU) (OTCQB: CHKKF) (FSE: 1ZX) is pleased to provide results from fourteen resource definition holes drilled in Bx 5 totaling 2,052.75m at the Soledad project, Ancash, Peru (see table below). The resource drilling is part of a fully funded 26,000m exploration and resource drilling program planned for 2021 (Fig. 1). These results will increase confidence in the initial resource estimate, anticipated to be completed by the end of 2021.

 

“The additional drill results for Bx 5 are outstanding and improve our understanding of the mineralization hosted in this breccia pipe. Grades are stronger at depth as seen in the deeper holes in this release, and mineralization remains open. This is one of six breccia pipes that will be included in the initial resource estimate. The Soledad project is exceptional in having multiple mineralized breccia pipes in close proximity to each other. We are also very excited about the new geophysical data that is being acquired across the entire extent of the 12km2 mineral system and expect that this will contribute to the ongoing exploration success on the property,” stated President and CEO David Kelley.

 

Drill Results

 

Bx 5 (Resource Definition)

DDH # From       –       To (m) Core Length
(m)
Au
g/t
Ag
g/t
Cu
%
Cu-eq
%*
Au-eq
g/t*
SDH21-224 174.00 182.00 8.00 2.38 3.2 2.42
and 190.00 204.60 14.60 0.49 63.7 2.08 2.94 4.50
SDG21-226 154.00 311.00 157.00 1.44 13.2 0.66 1.71 2.62
including 194.00 247.00 53.00 1.27 18.7 1.21 2.20 3.37
including 263.00 311.00 48.00 2.81 16.1 0.76 2.73 4.18
SDH21-227 157.85 176.00 18.15 1.19 18.1 0.44 1.37 2.10
and 183.00 288.00 105.00 1.24 23.0 1.09 2.10 3.21
including 184.00 230.00 46.00 1.50 40.5 1.74 3.07 4.69
SDH21-229 0.00 268.00 268.00 1.17 19.2 0.55 1.48 2.26
including 234.00 264.00 30.00 1.94 23.3 1.70 3.17 4.85
SDH21-231 0.00 139.00 139.00 1.21 30.7 0.28 1.33 2.04
SDH21-233 0.00 16.00 16.00 0.86 40.6 0.31 1.22 1.87
SDH21-234 0 26.30 26.30 1.55 39.8 0.30 1.65 2.53
SDH21-235 0.00 55.00 55.00 1.21 45.9 0.32 1.50 2.30
SDH21-236 0.00 73.45 73.45 0.98 37.7 0.23 1.19 1.82
SDH21-238 0.00 27.00 27.00 1.69 54.1 2.40
SDH21-239 0.00 16.45 16.45 3.16 79.0 4.19
SDH21-240 0.00 67.40 67.40 1.43 53.7 0.42 1.81 2.77
SDH21-241 0.00 92.00 92.00 0.92 35.0 0.34 1.24 1.90
including 1.00 15.00 14.00 2.49 62.4 3.31
SDH21-243 0.00 93.00 93.00 1.33 50.9 0.39 1.69 2.59
including 11.00 37.00 26.00 2.25 116.7 0.55 3.02 4.62

 

* Cu_eq and Au_eq values were calculated using copper, gold, and silver. Metal prices utilized for the calculations are Cu – US$2.90/lb, Au – US$1,300/oz, and Ag – US$17/oz. No adjustments were made for recovery as the project is an early-stage exploration project and metallurgical data to allow for estimation of recoveries are not yet available. The formulas utilized to calculate equivalent values are Cu-eq (%) = Cu% + (Au g/t * 0.6556) + (Ag g/t * 0.00857) and Au-eq (g/t) = Au g/t + (Cu% * 1.5296) + (Ag g/t * 0.01307).

 

Bx 5

The Bx 5 breccia pipe is in the north-central part of the project and is one of six breccia pipes that will be included in Chakana’s initial resource estimate (Fig. 1). The breccia pipe forms a prominent monument outcrop and extends to depths greater than 482m where mineralization remains open. Drill holes described in this release were designed to confirm shallow mineralization in the top western half of the breccia pipe, as well as deeper extents of mineralization probed by three holes drilled to the north from a platform located 100m south of the breccia pipe (Figs. 2 and 3). All holes intersected significant mineralization (see Figure 4 for select core photos of the mineralization). Twelve additional holes have been drilled as part of the resource definition program; results for these holes are pending.

 

Resource Estimate Site Visit

A site visit to the Soledad project was completed by a Qualified Person as defined by NI 43-101 for the purpose of the resource estimation. The visit included a geological overview, visits to several exposed breccia pipes, core inspection, sampling protocols, surface sampling, and a visit to the ALS laboratory in Callao, Lima, Peru.

 

2021 Resource and Exploration Drill Program

A total of 26,850m of drilling has been completed in 2021. The objectives of this drill program are to complete resource definition drilling on six initial breccia pipes to an approximate depth of 300m and test several new exploration targets. Breccia pipes that will be included in the initial resource estimate are: Bx1, Bx 5, Bx6, Paloma East, Paloma West, and Huancarama (Fig. 1). Additional resource definition drill results for Bx 5 and Huancarama are pending. During 2021 our drilling was focused on the north half of the project where drill permits are in place. Permitting for the south half of the project is well advanced. The southern half of the property hosts several outcropping mineralized tourmaline breccia pipes and has been recently covered by the Company’s ongoing geophysical program. Numerous targets exist, none of which have been drilled previously.

 

Geophysical Surveys

Gradient-array induced-polarization (IP) surveys are approximately 90% complete over the entire 12km2 footprint of the Soledad mineral system. Once completed, off-set IP surveying will be conducted over high-priority target areas to supplement the extensive exploration datasets used to identify the current inventory of 110 exploration targets on the property. This new information will be used to identify both new targets and prioritize existing targets in preparation for drilling when the exploration drilling program resumes.

 

About Chakana Copper

Chakana Copper Corp is a Canadian-based minerals exploration company that is currently advancing the Soledad Project located in the Ancash region of Peru, a highly favorable mining jurisdiction with supportive communities. The Soledad Project is notable for the high-grade copper-gold-silver mineralization that is hosted in tourmaline breccia pipes. A total of 60,854 metres in 261 diamond core holes for exploration and resource definition drilling have been completed since 2017, testing 16 of 110 total exploration targets, confirming that Soledad is a large, well-endowed mineral system with strong exploration upside. Chakana’s investors are uniquely positioned as the Soledad Project provides exposure to base and precious metals.

 

Sampling and Analytical Procedures

Chakana follows rigorous sampling and analytical protocols that meet or exceed industry standards. Core samples are stored in a secured area until transport in batches to the ALS facility in Callao, Lima, Peru. Sample batches include certified reference materials, blank, and duplicate samples that are then processed under the control of ALS. All samples are analyzed using the ME-MS41 (ICP technique that provides a comprehensive multi-element overview of the rock geochemistry), while gold is analyzed by AA24 and GRA22 when values exceed 10 g/t by AA24. Over limit silver, copper, lead and zinc are analyzed using the OG-46 procedure. Soil samples are analyzed by 4-acid (ME-MS61) and for gold by Fire Assay on a 30g sample (Au-ICP21).

 

Results of previous drilling and additional information concerning the Project, including a technical report prepared in accordance with National Instrument 43-101, are made available on Chakana’s SEDAR profile at www.sedar.com.

 

Qualified Person

David Kelley, an officer and a director of Chakana, and a Qualified Person as defined by NI 43-101, reviewed and approved the technical information in this news release.

 

Posted October 14, 2021

Share this news article

MORE or "UNCATEGORIZED"


KOOTENAY SILVER CLOSES BROKERED PUBLIC OFFERING FOR GROSS PROCEEDS OF C$10.35 MILLION

Kootenay Silver Inc. (TSX-V: KTN) is pleased to announce that the... READ MORE

April 25, 2024

U.S. Gold Corp. Closes $4.9 Million Non-Brokered Registered Direct Offering

U.S. Gold Corp. (NASDAQ: USAU), is pleased to announce that it h... READ MORE

April 25, 2024

Getchell Gold Corp. Announces Final Tranche of Debenture Financing

Getchell Gold Corp. (CSE: GTCH) (OTCQB: GGLDF) (FWB: GGA1) is ple... READ MORE

April 25, 2024

Imperial Reports Production Update for 2024 First Quarter

Imperial Metals Corporation (TSX:III) reports quarterly copper an... READ MORE

April 25, 2024

ALX Resources Corp. Intersects Additional Uranium Mineralization at the Gibbons Creek Uranium Project, Athabasca Basin, Saskatchewan

ALX Resources Corp. (TSX-V: AL) (FSE: 6LLN) (OTC: ALXEF) is pleas... READ MORE

April 25, 2024

Copyright 2024 The Prospector News