The Prospector News

Chakana Intersects 22.8 Metres With 2.93 g/t Gold, 1.37% Copper, and 1,283.2 g/t Silver (21.80 g/t Au_EQ, 14.29% Cu_EQ) at Breccia Pipe 6

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Chakana Intersects 22.8 Metres With 2.93 g/t Gold, 1.37% Copper, and 1,283.2 g/t Silver (21.80 g/t Au_EQ, 14.29% Cu_EQ) at Breccia Pipe 6

 

 

 

 

 

Chakana Copper Corp. (TSX-V: PERU) (OTC: CHKKF) (FWB: 1ZX) is pleased to release initial drill results from Breccia Pipe 6 (Bx 6) at the Soledad copper-gold-silver project in central Peru. Bx 6 is located 500 metres north of Bx 5 and 1 km northwest of Bx 1 and is the northernmost and highest elevation outcropping breccia pipe identified to date in the Soledad cluster. There are seventeen confirmed breccia pipes on the Soledad project, twelve of which occur in the Soledad cluster, along with twelve other targets with distinctive alteration that is consistent with the alteration encountered adjacent to breccia pipes in previous drilling (Fig. 1). Four of the seventeen confirmed pipes have been drilled to date.

 

The eight drill holes reported here were designed to explore the uppermost 150m extent of Bx 6 (Figs. 2 and 3).  Bx 6 has a prominent surface expression with steep vertical walls on the east, south, and west sides (Fig. 2A). Drill collars were located on the north central part of the breccia pipe and oriented southeast and southerly. The northern quadrant of the pipe remains undrilled. Planned drilling from step out platforms will subsequently help to determine the grade and to delineate the geometry and plunge of the breccia.

 

Seven of the eight holes intersected significant mineralization, including 59.3m with 1.28 g/t Au, 0.53% Cu, and 497.2 g/t Ag from 28m in hole SDH18-102. Within this interval a 22.8m zone intersected 2.93 g/t Au, 1.37% Cu, and 1,283.2 g/t Ag. “These results are an outstanding start for Bx 6, the third mineralized tourmaline breccia pipe drilled on the property to date. Bx 6 has high silver grades compared to Bx 1 and Bx 5, possibly indicating property-scale zoning between the pipes. It is very encouraging to see grades like this early in the drilling of a pipe. Mineralization in Bx 6 is open at depth and to the north. We also intersected a very interesting zone of mineralization in the wall rock, away from the tourmaline breccia, with 30.89m of 2.04 g/t Au and 31.7 g/t Ag from 57.0m in SDH18-101,” said President and CEO David Kelley. Examples of mineralized breccias from holes in this release are shown in Figures 4 and 5.

 

Mineralized intervals from Breccia Pipe 6 include:

 

 

Bx 6 – Exploration Holes
DDH # Az Dip From – To
(m)
Core
Length (m)
Au
g/t
Ag
g/t
Cu % Cu-
eq
%*
Au-
eq g/t*
Note
SDH18-088 155 -83 No breccia intersected 58.2m depth
SDH18-090 155 -69 14.00 44.00 30.00 0.53 17.4 0.03 0.53 0.80  
and     61.00 103.00 42.00 1.02 115.9 0.51 2.17 3.31  
SDH18-092 140 -80 93.00 166.00 73.00 0.54 39.3 0.10 0.79 1.21  
including     115.00 129.00 14.00 2.80 157.9 0.38 3.57 5.45  
SDH18-095 180 -73 31.00 47.00 16.00 0.22 8.3 0.01 0.23 0.34  
SDH18-097 180 -57 3.00 50.30 47.30 0.58 46.6 0.04 0.82 1.25  
including     11.00 32.00 21.00 0.74 85.0 0.05 1.26 1.93  
SDH18-099 205 -76 0.00 43.00 43.00 0.62 36.6 0.04 0.77 1.17  
including     10.00 43.00 33.00 0.75 46.0 0.05 0.94 1.43  
SDH18-101 178 -78 0.60 87.89 87.29 0.71 33.2 0.02 0.77 1.17  
including     57.00 87.89 30.89 2.04 31.7 0.04 1.65 2.52 Wall rock
SDH18-102 130 -70 28.00 87.30 59.30 1.28 497.2 0.53 5.63 8.59  
including     64.50 87.30 22.80 2.93 1283.2 1.37 14.29 21.80  

 

* Cu_eq and Au_eq values were calculated using copper, gold, and silver. Metal prices utilized for the calculations are Cu – US$2.90/lb, Au – US$1,300/oz, and Ag – US$17/oz. No adjustments were made for recovery as the project is an early stage exploration project and metallurgical data to allow for estimation of recoveries are not yet available. The formulas utilized to calculate equivalent values are Cu_eq (%) = Cu% + (Au g/t * 0.6556) + (Ag g/t * 0.00857) and Au_eq (g/t) = Au g/t + (Cu% * 1.5296) + (Ag g/t * 0.01307).

 

Reported mineralized intervals are not true widths given the vertical nature of the breccia pipe and the steep inclination of the holes.

 

Breccia Pipe 3East (Bx3E) was also tested by ten holes from two platforms. Long runs of mineralization similar to Bx 1, Bx 5, and Bx 6 were not encountered. Relatively short intervals  of exceptional mineralization were encountered, including 19.0m of 2.20 g/t Au in SDH18-096 from 85m; 2.75m with 1.17 g/t Au, 0.76% Cu, and 222.9 g/t Ag in SDH18-098 from 198.85m; and 1.05m of 5.20 g/t Au, 7.07% Cu, and 404.8 g/t Ag in SDH18-100 from 457.9m These intersects are important and based on results elsewhere additional drilling is necessary. Examples of mineralized breccia from Bx3E are shown in Figure 5E and 5F.

 

Sampling and Analytical Procedures

 

Chakana follows rigorous sampling and analytical protocols that meet or exceed industry standards. Core samples are stored in a secured area until transport in batches to the ALS facility in Callao, Lima, Peru.  Sample batches include certified reference materials, blank, and duplicate samples that are then processed under the control of ALS. All samples are analyzed using the ME-MS41 (ICP technique that provides a comprehensive multi-element overview of the rock geochemistry), while gold is analyzed by AA24 and GRA22 when values exceed 10 g/t.  Over limit silver, copper, lead and zinc are analyzed using the OG-46 procedure. Soil samples are analyzed by 4-acid (ME-MS61) and for gold by Fire Assay on a 30g sample (Au-ICP21).

 

Results of the previous seventy drill holes from the Soledad Project have been released and are also available at www.chakanacopper.com.  Additional information concerning the Project is available in a technical report prepared in accordance with National Instrument 43-101 made available on Chakana’s SEDAR profile at www.sedar.com.

 

Qualified Person

 

David Kelley, an officer and a director of Chakana, and a Qualified Person as defined by NI 43-101, reviewed and approved the technical information in this news release.

 

Photos accompanying this announcement are available at:

 

http://www.globenewswire.com/NewsRoom/AttachmentNg/498b1dfd-913b-46b5-8259-1faafbc0c9ef

 

http://www.globenewswire.com/NewsRoom/AttachmentNg/e3adaf46-c7eb-4b83-a06e-d8d9097da0d9

 

http://www.globenewswire.com/NewsRoom/AttachmentNg/076b9728-4fa2-4e26-8cd0-b7eb7e3b2018

 

http://www.globenewswire.com/NewsRoom/AttachmentNg/159566eb-7643-4304-a77c-30525cbdce7f

 

http://www.globenewswire.com/NewsRoom/AttachmentNg/89fca043-49b7-422e-8758-e176a3463ce8

Posted February 7, 2019

Share this news article

MORE or "UNCATEGORIZED"


First Phosphate Intersects 92.5 m of 11.82% Igneous Phosphate Starting at Surface at Its Begin-Lamarche Project in Saguenay-Lac-St-Jean, Quebec, Canada

First Phosphate Corp. (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) is plea... READ MORE

April 23, 2024

Kuya Silver Provides Update on Mine Start-up and Uncovers New Major Silver-Mineralized Vein Zone South of the Bethania Mine, Peru

Kuya Targeting Commencement of Production at Bethania in H1 2024 ... READ MORE

April 23, 2024

Silvercorp Reports Operational Results and Financial Results Release Date for Fiscal 2024, and Issues Fiscal 2025 Production, Cash Costs, and Capital Expenditure Guidance

Silvercorp Metals Inc. (TSX: SVM) (NYSE American: SVM) reports pr... READ MORE

April 23, 2024

Lithium Ionic Expands Newly Discovered Zone at Salinas; Drills 1.53% Li2O over 15m, incl. 2.31% Li2O over 8m; 1.15% Li2O over 19m, incl. 1.67% Li2O over 10m, and 1.32% Li2O over 14m

Excellent follow-up drill results from high-grade discovery holes... READ MORE

April 23, 2024

Solaris Reports First Drilling Results from 2024 Program and Exploration Update, Including 150m of 0.67% CuEq within 384m of 0.51% CuEq and 284m of 0.53% CuEq from Near Surface

Solaris Resources Inc. (TSX: SLS) (NYSE: SLSR) is pleased to repo... READ MORE

April 23, 2024

Copyright 2024 The Prospector News