The Prospector News

CENTURY LITHIUM PRODUCES LITHIUM CARBONATE ONSITE AT PILOT PLANT

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

CENTURY LITHIUM PRODUCES LITHIUM CARBONATE ONSITE AT PILOT PLANT

 

 

 

 

 

Century Lithium Corp. (TSX-V: LCE) (OTCQX: CYDVF) (Frankfurt: C1Z) is pleased to report the successful addition of a lithium carbonate stage at the Company’s Lithium Extraction Facility in Amargosa Valley, Nevada, USA, part of the Company’s 100%-owned Angel Island Mine (the Project). Prior to this addition, concentrated lithium solutions from the Pilot Plant were treated by Saltworks Inc. at their facility in Richmond B.C. where samples of battery quality lithium carbonate were produced. During the first days of startup of the lithium carbonate stage, Century’s team at the Pilot Plant successfully treated 200 liters of concentrated lithium solution and produced 20 kg of high-grade lithium carbonate onsite.

 

“At this point in time, the ability to make lithium carbonate at our Pilot Plant is an important step forward, in line with recommendations from our recently completed Feasibility Study” commented President and CEO Bill Willoughby. “The drop in lithium prices over the last year has taken a toll on the share price of all lithium companies. Despite the downturn, domestic production is still key to the security of supply in the U.S. While it is becoming well known that a vast amount of lithium is contained within the claystone deposits of Nevada, the benefit in unlocking these resources is the ability to produce a battery quality lithium product onsite and thereby reducing or eliminating the need for downstream processing.”

 

The Company continues work at the Pilot Plant, utilizing the Company’s patent-pending process for chloride leaching combined with Direct Lithium Extraction (DLE) to generate data as the Company works to identify further technological breakthroughs to make the extraction of lithium from clay more economic. Adding the lithium carbonate stage at the Pilot Plant is one of the recommendations made in the Feasibility Study, not only to further demonstrate that battery quality lithium carbonate can be made, but to better understand and minimize the recycle streams from the DLE stage through to final product in the process. With the assistance of engineers from Hargrove Engineers and Constructors, Century’s team configured equipment to run 40-liter batches of concentrated lithium solution though precipitation, washing and drying steps. Final assays on the lithium carbonate are pending.

 

Qualified Person

 

Todd Fayram, MMSA-QP and Senior Vice President, Metallurgy of Century Lithium is the qualified person as defined by National Instrument 43-101 and has approved the technical information in this release.

 

ABOUT CENTURY LITHIUM CORP.

 

Century Lithium Corp. is an advanced stage lithium company, focused on developing its 100%-owned Angel Island Mine in west-central Nevada, USA. Century Lithium recently completed a Feasibility Study on its Clayton Valley Lithium Project and is currently in the permitting stage, with the goal of becoming a domestic producer of lithium for the growing electric vehicle and battery storage market.

 

Posted August 6, 2024

Share this news article

MORE or "UNCATEGORIZED"


Volta Drills Widest TREO-Mineralized Interval to Date 0.95% TREO over 438.9m, Including 1.06% TREO over 358.6m, at Springer REE Project in Ontario, Canada

Drillhole ends in mineralization with 1.78% TREO   HIGHLIGHTS Dr... READ MORE

November 12, 2025

Trident Resources Intersects 7.03gpt Au over 43.25m Starting at 121.0m Depth, including 30.06gpt Au over 9.25m at Contact Lake Gold Project, Saskatchewan

Trident Resources Corp. (TSX-V: ROCK) (OTCQB: TRDTF) is pleased ... READ MORE

November 12, 2025

Orla Mining Reports Third Quarter 2025 Financial Results

Orla Mining Ltd. (TSX: OLA) (NYSE: ORLA) announces the results fo... READ MORE

November 12, 2025

Silverco Mining Expands on San Miguel Target, Drilling 8.6m Grading 250 g/t AgEq and 2.1m Grading 1,042 g/t AgEq at the Cusi Property, Chihuahua, Mexico

2025 San Miguel Drilling Highlights 250 g/t AgEq over 8.6 metres ... READ MORE

November 12, 2025

Aya Gold & Silver Reports Record Revenue and Net Income for Q3-2025 on Record Production

Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) announced th... READ MORE

November 12, 2025

Copyright 2025 The Prospector News