The Prospector News

Cartier Reports Large Drill Program on Globex’s Nordeau Royalty Claims

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Cartier Reports Large Drill Program on Globex’s Nordeau Royalty Claims

 

 

 

 

 

GLOBEX MINING ENTERPRISES INC. (TSX:GMX) (FRA:G1MN)  (OTCQX:GLBXF)  is pleased to inform shareholders that Cartier Resources Inc. (TSX-V: ECR) (FSE: 6CA) has provided an update on the progress of it’s 2024 drill program on it’s Chimo Mine Project, part of which was drilled on Globex’s Nordeau West and Nordeau East royalty claims in Vauquelin Township, Quebec, east of the town of Louvicourt.

 

A total of 48 holes totalling 9,347 m have been completed with 2,307 samples taken for assay of which 66% have been received to date, much of which were on Globex royalty claims. An additional 115 holes totalling 16,000 m is expected to be drilled to test an additional 6.0 km of favorable strike length, some of which will be on Globex’s royalty claims.

 

New reported drill results by Cartier include:

 

– West Nordeau Zone: 7,7 g/t Au sur 2,0 m incluant 13,5 g/t Au sur 1,0 m
13,2 g/t Au sur 2,3 m incluant 46,1 g/t Au sur 0,5 m
7,5 g/t Au sur 2,0 m incluant 20,6 g/t Au sur 0,5 m
 East Nordeau Zone: 11,0 g/t Au sur 2,8 m incluant 17,9 g/t Au sur 1,0 m.

 

 

Globex retains a 3% Gross Metal Royalty on the Nordeau claims.

 

Click here to access Cartier’s Press Release.

 

Chimo Property 2024 Drilling Program – Cartier Resources Inc.

 

 

Chimo Mine Project showing Historical Drill Results – Cartier Resources Inc.

 

 

Chimo Mine Long Section showing Nordeau West – Cartier Resources Inc.

 

 

 Qualified Persons

 

The Cartier’s scientific and technical information in this news release was prepared and reviewed by Mr. Gaétan Lavallière, P.Geo., Ph.D., Vice-President, and Mr. Ronan Déroff, P.Geo., M.Sc., Senior Geologist, Project Manager and Geomatician, both qualified persons as defined in National Instrument 43-101. Mr. Lavallière approved the information contained in Cartier’s press release.

This press release was written by Jack Stoch, P. Geo., President and CEO of Globex in his capacity as a Qualified Person (Q.P.) under NI 43-101.

 

Posted May 15, 2024

Share this news article

MORE or "UNCATEGORIZED"


South Pacific Metals Extends the Mineralized Structures at Megabe to More than 300 Metres of Confirmed Strike Length; Structures Open Along Strike and at Depth

Step-out drilling places SPMC on the upper margin of a potential ... READ MORE

August 24, 2026

North Arrow Extends Target AE Strike Length to 1000 m and Completes Rotation 3 Regional RC Drilling, Kraaipan Gold Project, Botswana

New surface targets identified North Arrow Minerals Inc. (... READ MORE

August 24, 2026

USA Rare Earth Announces Completion of Upsized $1.55 Billion Capitalization of the U.S. Government-Backed Special Purpose Vehicle for Serra Verde Offtake

U.S. Department of War (DoW) provides a $750 million investment i... READ MORE

August 24, 2026

Lavras Gold Intersects High-Grade Gold at Caneleira, Supporting Near-Surface Continuity of the Vein System

Hole 26CN044 returns 24.30 g/t gold over a drilled width of 9 met... READ MORE

August 24, 2026

Ivanhoe Electric Receives Preliminary Project Letter from the Export-Import Bank of the United States for $1.1 Billion in Potential Debt Financing for the Santa Cruz Copper Project

Letter Provides Increased Potential Debt Financing from $825 Mill... READ MORE

August 24, 2026

Copyright 2026 The Prospector News