The Prospector News

Cartier Confirms Mineralization Continuity to a Depth of 1.6 km at Chimo Mine

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Cartier Confirms Mineralization Continuity to a Depth of 1.6 km at Chimo Mine

 

 

 

 

 

Cartier Resources Inc. (TSX-V: ECR) announces that it now has data which confirm the presence of gold mineralization within 20 drill holes completed between 1.0 and 1.6 km at the Chimo Mine project, located 45 km east of Val-d’Or. All holes intersected gold mineralization similar to that at Chimo Mine, to which are added the following new results: 4.7 g / t Au over 5.0 m included within 1.8 g / t Au over 16.6 m and 3.6 g / t Au over 4.0 m included 1.3 g / t Au over 17.4 m (FIGURE).

 

 

We now know that the gold mineralization is present in all places drilled under the Chimo mine thus defining the mineralized envelope” commented Philippe Cloutier, President and CEO, adding that “we are expecting over 3,500 lab results to complete the portrait of the gold potential “.  A procedure has just been put in place at the Techni-Lab laboratory (Actlabs) in Ste-Germaine-Boulé (Quebec) to speed up the processing of samples and the reception of results.

 

 

The details of the new results received from the laboratory are as follows:

 

 

Drill Hole From
(m)
To
(m)
Length
(m)
Au
(g/t)
Cluster of Zones 5
CH17-47AW 1,470.5 1,475.5 5.0 4.7 5M2, 5M, 5B and 5BS
including 1,470.5 1,472.5 2.0 7.2
included within 1,466.7 1,483.3 16.6 1.8
CH17-46B 1,201.3 1,205.3 4.0 3.6
including 1,201.3 1,202.3 1.0 8.9
included within 1,187.9 1,205.3 17.4 1.3
included within 1,187.9 1,233.4 45.5 0.7

 

Lengths are expressed along drill core axis.  The true thickness was not determined.

 

 

The deep drilling program along the depth extension of the Zone 5 cluster, which produced 75% of the ounces extracted from the Chimo Mine, was completed after 11 months of drilling. The program consisted of 20 holes totaling 10,000 m from 2 pilot holes starting at the surface. All of the holes intersected gold mineralization similar to Zones 5 of the Chimo Mine (FIGURE). Mineralization consists of non-refractory arsenopyrite, smoky and / or whitish quartz veins, biotite, and visible gold grains.

 

 

The Phase II drilling program is currently underway (August 28th 2018 press release) and aims to focus on the resource development potential of 7 peripheral gold zones to the main cluster of Zones 5.

 

 

The reader should view the YouTube VIDEO, available on Cartier’s website.  The 3D video helps visualize the different gold-bearing structures on the Chimo Mine property as well as key components that are the mine infrastructures, the gold-bearing zones, the gold intersection areas left unmined as well as the 281 targets of the ongoing drill program. The gold structures and zones 5M2, 5M, 5B and 5BS are illustrated.

 

 

Chimo Mine Project Highlights

 

 

 

About Cartier

 

 

Cartier Resources was founded in 2006 and is based out of Val-d’Or, Quebec.  Quebec has consistently ranked high as one of the best mining jurisdictions in the world primarily based on its mineral rich geology, attractive tax environment, and pro-mining government.  In 2017, the Fraser Institute again ranked Quebec as one of the best jurisdictions in the world for investment attractiveness.

 

 

Cartier Investment Highlights

 

  • The Corporation has a strong cash position with over $10M in the bank and important corporate and institutional investors including Agnico Eagle Mines, JP Morgan UK and the Quebec investment funds.
  • Cartier’s strategy is to focus on gold projects that are relatively advanced with significant potential for resource expansion laterally and at depth.
  • The Corporation holds a portfolio of advanced stage exploration projects in the Abitibi Greenstone Belt in Quebec – one of the most prolific mining regions in the world – the commodity focus is gold.
  • The Corporation is focused on advancing its four key projects through drill programs.  All of these projects were acquired at very reasonable valuations over the past few years.  All of them are drill-ready with targets identified similar to the deposits that have been outlined on each project.
  • The Chimo Mine project is a historic gold producer. Three other projects, namely Wilson, Benoist and Fenton, hold historic resource estimates.
  • In 2018, an ongoing program of 105 holes totaling 45,000 m aims to enhance the resource development potential at Chimo Mine.

 

 

Quality Assurance / Quality Control

 

 

All lengths, mentioned in this press release, were measured along the drill core. The NQ core samples are crushed up to 80% passing 8 mesh sieves and then pulverized up to 90% passing a 200-mesh sieve. Cartier inserts 5% of the number of samples in the form of certified standards and another 5% in the form of sterile samples to ensure quality control. The samples are analyzed at the Techni-Lab laboratory, located in Ste-Germaine-Boulé, Quebec. The 50 g pulps are analyzed by fire assay and atomic absorption. For samples containing visible gold, 1,000 g of rock are directly analyzed by the “Metallic Sieve” method.

 

 

The scientific and/or technical information presented in this press release has been reviewed and approved by Mr. Gaétan Lavallière, P. Geo., Ph. D. and Vice President for Cartier Resources.  Mr. Lavallière is a qualified person as defined by National Instrument 43-101.

 

Posted September 20, 2018

Share this news article

MORE or "UNCATEGORIZED"


NexGold and Signal Gold Announce Merger to Create one of Canada’s Most Advanced Near-Term Gold Developers with a Combined 4.7 million Gold Ounces of Measured and Indicated Resources and a Plan to Achieve 200,000+ ounces of Annual Production

Concurrent $11.5 Million Private Placement Equity Financing and P... READ MORE

October 10, 2024

Northisle Announces North Island Project Indicated Resource Estimate Increased to 3.1 billion lbs Cu and 6.9 million ozs Au

Highlights: Integrated North Island Project resource estimate dem... READ MORE

October 10, 2024

Brixton Metals Drills 41.00m of 1.08 g/t Gold including 6.00m of 4.19 g/t Gold all within 254.00m of 0.48 g/t Gold at its Trapper Target on the Thorn Project

Brixton Metals Corporation (TSX-V: BBB) (OTCQB: BBBXF) is pleased... READ MORE

October 10, 2024

CanAlaska Assays Confirm Ultra High-Grade Uranium Mineralization at Pike Zone on West McArthur Joint Venture

Drillhole WMA082-11 Intersected 6.47% U3O8 Over 25.8 Metres; Including 2... READ MORE

October 10, 2024

NorthWest Copper Discovers New Mineralized Zone at the Lorraine-Top Cat Project

First Ever Drill Assays from the Road IP Target Return 104.7 metr... READ MORE

October 10, 2024

Copyright 2024 The Prospector News