The Prospector News

Cartier Announces Filing of Updated Mineral Resource Estimate Technical Report for the Cadillac Project

You have opened a direct link to the current edition PDF

Open PDF Close
Slider

Share this news article

Cartier Announces Filing of Updated Mineral Resource Estimate Technical Report for the Cadillac Project

Cartier Resources Inc. (TSX-V: ECR) (FSE: 6CA) is pleased to announce that it has filed the National Instrument 43-101-compliant, Updated Mineral Resource Estimate Technical Report on its 100% owned flagship Cadillac Project, located in Val-d’Or (Abitibi, Quebec). Report results were previously announced in Cartier’s news release dated December 18, 2025. The updated estimate includes approximately 110,000 metres of drilling completed by Cartier from 2016 to 2024 as well as 420,000 metres drilling completed by previous mining compagnies.

The MRE was independently prepared by PLR Resources Inc. and Evomine, specialists in mineral resource estimates and project evaluations, in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects, with an effective date of November 11, 2025.

The full report entitled “NI 43-101 Technical Report and Mineral Resource Estimate on the Cadillac Project, Val-d’Or, Abitibi, Quebec, Canada,” can be found on the Company’s website (https://ressourcescartier.com/) and on SEDAR+ (https://www.sedarplus.ca/home/).

Strategic & Investment Significance Highlights of the Updated Mineral Resource Estimate

  • Growing gold resource: Compared to the 2023 Preliminary Economic Assessment, total gold resources now contains 9,953,000 tonnes at a grade of 2.40 g/t Au for 767,800 ounces Measured & Indicated (a 7% increase) and 35,185,000 tonnes at a grade of 2.14 g/t Au for 2,416,900 ounces Inferred (a 48% increase), following the first-ever consolidation (2022) of all gold sectors across the entire Cadillac project.
  • Increasing confidence & de-risking: M&I resources represent 25% of total resources, including 5,988,000 tonnes at a grade of 2.61 g/t Au for 502,600 ounces Measured, strengthening the project’s development profile.
  • Flexible development pathways: 12% of total gold resources are pit-constrained, offering near-term optionality with 3,500,000 tonnes at a grade of 1.84 g/t Au for 207,800 ounces M&I and 4,740,000 tonnes at a grade of 1.13 g/t Au for 172,600 ounces Inferred.
  • Large underground resource & existing infrastructure advantages: Over 88% of total gold resources are underground-constrained with 6,450,000 tonnes at a grade of 2.70 g/t Au for 559,900 ounces M&I and 30,450,000 tonnes at a grade of 2.29 g/t Au for 2,244,200 ounces Inferred. This large resource is supported by valuable historical infrastructure including a 920 m shaft, 500 m ramp and 7 km of drifts, these could significantly reduce future capital requirements and allow management to adapt development strategies.
  • Camp-scale upside potential: Gold sectors extend over 9 km along the Cadillac and Héva Fault Zones, covering 66% of a 15 km highly prospective gold corridor, leaving 6 km of strike with strong upside potential to be fully explored for resource expansion.
  • High-quality core sector: The Main Sector (Chimo, East Chimo and West Nordeau deposits) hosts 87% of total resources within a 3 km mineralized trend and remains open at depth and along strike, providing strong leverage to further drilling success.
  • Significant exploration target: A conceptual exploration target of 8 to 12 Mt of mineralization grading between 2.2 to 2.8 g/t Au, representing 600,000 to 1,100,000 ounces of gold, highlights the project’s potential to materially grow beyond the current resource base.

Table 1: Results of the Updated Mineral Resource Estimate

 

All sectors / Category Open Pit Resources Underground Resources Total
Cut-off Grade = 0.30 g/t Au Cut-off Grade = 1.00 g/t Au
Tonnes (t) Grade (Au g/t) Gold (oz) Tonnes (t) Grade (Au g/t) Gold (oz) Tonnes (t) Grade (Au g/t) Gold (oz)
Measured 1,770,000 2.16 123,300 4,210,000 2.80 379,300 5,988,000 2.61 502,600
Indicated 1,730,000 1.52 84,500 2,240,000 2.51 180,600 3,965,000 2.08 265,200
Measured & Indicated 3,500,000 1.84 207,800 6,450,000 2.70 559,900 9,953,000 2.40 767,800
Inferred 4,740,000 1.13 172,600 30,450,000 2.29 2,244,200 35,185,000 2.14 2,416,900

About Cadillac Project

The Cadillac Project, covering 14,000 hectares along a 15-kilometre stretch of the Cadillac Fault, is one of the largest consolidated land packages in the Val-d’Or mining camp. Cartier’s flagship asset integrates the historic Chimo Mine and East Cadillac projects, creating a dominant position in a world class gold mining district. With excellent road access, year-round infrastructure and nearby milling capacity, the project is ideally positioned for rapid advancement and value creation.

About Cartier Resources Inc.

Cartier Resources Inc., founded in 2006 and headquartered in Val-d’Or (Quebec) is a gold exploration company focused on building shareholder value through discovery and development in one of Canada’s most prolific mining camps. The Company combines strong technical expertise and a track record of successful exploration to advance its flagship Cadillac Project. Cartier’s strategy is clear: unlock the full potential of one of the largest undeveloped gold landholdings in Quebec.

For further information, contact:
Philippe Cloutier, P. Geo.
President and CEO
Telephone: 819-856-0512
philippe.cloutier@ressourcescartier.com
www.ressourcescartier.com

Posted January 28, 2026

Share this news article

MORE or "SLIDER"


Jeff Christian - "A Brief Response RE: “Silver Price Suppression” and “Reset” Comments"

In the 51 years that we have been involved in the silver market, since 1975, we have continua... READ MORE

January 29, 2026

Prospector Podcast - Chris Temple: Wall Street vs Main Street: Can the Market Survive 2026?

In this episode, Michael Fox and Chris Temple of the National Investor break down the recent ... READ MORE

January 29, 2026

Peruvian Government: World Mining Congress 2026 Will Be a Strategic Milestone for the Country and the Global Industry

The Ministry of Energy and Mines highlighted that the event, to be held in June in Lima, will... READ MORE

January 29, 2026

Equity Metals Provides Corporate Update

Equity Metals Corporation (TSX-V: EQTY) announces that the following incumbent directors were... READ MORE

January 29, 2026

Playfair Mining Ltd. Announces Private Placement Under the Listed Issuer Financing Exemption (LIFE) and Share Consolidation.

Playfair Mining Ltd (TSX-V: PLY) is pleased to announce the Company intends to conduct a non-brokere... READ MORE

January 29, 2026

Copyright 2026 The Prospector News