The Prospector News

Capstone Copper Announces First Saleable Copper Concentrate at MVDP in Chile

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Capstone Copper Announces First Saleable Copper Concentrate at MVDP in Chile

 

 

 

 

 

Capstone Copper Corp. (TSX:CS) (ASX:CSC) is pleased to announce that first saleable copper concentrate was produced at its Mantoverde Development Project in Chile, as the mine advances commissioning and ramps up to full production levels.

 

The unchanged key commissioning milestones at the MVDP include:

  • First ore to the primary crusher – completed in Q4 2023
  • First ore to the grinding circuit – completed in Q1 2024
  • First saleable concentrate – completed in Q2 2024
  • Achievement of nameplate operating rates – expected during Q3 2024

 

“First saleable copper concentrate production at MVDP is a significant milestone for Capstone. This achievement is a testament to our dedicated and skilled teams, who continue to work towards a safe and efficient ramp-up to nameplate operating rates. MVDP remains on track and on budget with our guidance previously disclosed,” John MacKenzie, Capstone’s Chief Executive Officer, commented. “In July, we plan to release an updated feasibility study for our Santo Domingo project, followed by a feasibility study for our Mantoverde Optimized project later in the quarter, which will define the next phases of our value-accretive production growth in the district.”

 

For a virtual tour of the Mantoverde Development Project please visit: https://vrify.com/decks/12698-mantoverde-development-project

 

About MVDP

 

MVDP is expected to enable the mine to process 236 million tonnes of copper sulphide reserves (which represent approximately 20% of total sulphide resources) over a 20-year expected mine life, in addition to existing oxide reserves. The MVDP involves the addition of a sulphide concentrator (nominal 32,000 ore tonnes per day) and tailings storage facility, and the expansion of the existing desalination plant and other minor infrastructure.

 

About Capstone Copper Corp.

 

Capstone Copper Corp. is an Americas-focused copper mining company headquartered in Vancouver, Canada. We own and operate the Pinto Valley copper mine located in Arizona, USA, the Cozamin copper-silver mine located in Zacatecas, Mexico, the Mantos Blancos copper-silver mine located in the Antofagasta region, Chile, and 70% of the Mantoverde copper-gold mine, located in the Atacama region, Chile. In addition, we own the fully permitted Santo Domingo copper-iron-gold project, located approximately 30 kilometres northeast of Mantoverde in the Atacama region, Chile, as well as a portfolio of exploration properties in the Americas.

 

Capstone Copper’s strategy is to unlock transformational copper production growth while executing on cost and operational improvements through innovation, optimization and safe and responsible production throughout our portfolio of assets. We focus on profitability and disciplined capital allocation to surface stakeholder value. We are committed to creating a positive impact in the lives of our people and local communities, while delivering compelling returns to investors by responsibly producing copper to meet the world’s growing needs.

 

Posted June 26, 2024

Share this news article

MORE or "UNCATEGORIZED"


ALPHAMIN ANNOUNCES FILING OF YEAR END FINANCIAL RESULTS/AWARD OF LONG TERM INCENTIVES/EXPLORATION UPDATE

Alphamin Resources Corp. (TSX-V:AFM) (JSE AltX:APH) is pleased to... READ MORE

March 11, 2026

Titan Mining to Start Shipping First Graphite Product and Feasibility Study Underway for 40,000 tpa Integrated Kilbourne Graphite Project

Project Designed to Supply ~50% of U.S. Natural Graphite Demand, ... READ MORE

March 11, 2026

REalloys Announces Fully Financed Buildout of the Largest Heavy Rare Earth Metallization Facility Outside China, in Partnership with the Saskatchewan Research Council

First operations expected in 1H 2027 from a fully financed, zero-... READ MORE

March 11, 2026

Viscount Mining Announces Closing of Oversubscribed $5.6 Million Financing Led by Centurion One Capital

Viscount Mining Corp. (TSX-V: VML) (OTCQX: VLMGF) is pleased to a... READ MORE

March 11, 2026

Goliath Resources Acquires 100% Ownership Of The Golddigger Property Hosting The High-Grade Surebet Gold Discovery And Buys Down 1% Of The NSR, Golden Triangle, B.C.

Goliath Resources Limited (TSX-V: GOT) (OTCQX: GOTRF) (Frankfurt:... READ MORE

March 10, 2026

Copyright 2026 The Prospector News