The Prospector News

Capitan Mining Inc. (TSX-V: CAPT) is pleased to report ongoing drill results from its previously announced 6,000m drill program at the El Capitan gold zone.

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Capitan Mining Inc. (TSX-V: CAPT) is pleased to report ongoing drill results from its previously announced 6,000m drill program at the El Capitan gold zone.

 

 

 

 

 

Highlights:

 

  • All holes successfully tested and returned Capitan Style oxide gold mineralization over significant widths
  • RC Hole 21-CARC-19: intersected 33.5m of 0.4 g/t gold equivalent
  • RC Holes 21-CARC-19 and 20 extended mineralized zones along strike (to the west) as well as down-dip, and showed improving grades and widths
  • Expansion drilling program continues, with new drilling focused on expanding the Capitan Zone along strike to the east
  • Mineralization remains open along strike and at depth

 

Discussion

Drillholes 21-CARC-19, 20, and 21 are the first drillholes of the 2021 season and were designed to test the continuity of Capitan Style oxide gold mineralization adjacent to and beyond the western and eastern peripheries of the current, drilled defined mineralized zone (see figure 1).

Western Extension

Drillhole 21-CARC-19 was designed to test the down-dip extension of the Capitan zone from historic hole CDDH-12-22, which returned 0.18 g/t over 24m. The hole successfully intersected the main Capitan hill zone starting at 129m, returning 33.5 meters of 0.4 g/t AuEq, which is significantly wider and higher grade than the intersection reported in historic hole CDHH-12-22, suggesting that mineralization is improving at depth. The hole extended the main Capitan zone down-dip, approximately 90 meters.

Drillhole 21-CARC-20 was a 50 meter step-out from historic hole CDDH-12-07, designed to test the on-strike extension of the main Capitan zone along its western margin. The hole successfully intersected multiple zones of Capitan Style oxide gold mineralization, showing considerable improvement in grade and width when compared to historic hole CDDH-12-07 (see table 1) suggesting a new area of stronger mineralization maybe commencing to the west of the current drill limits.

Eastern Capitan Hill

Drillhole 21-CARC-18 was designed to test a large, 325-meter-wide gap between drillhole 20-CARC-17 and drillholes CDDH-08-03/20-CARC-15, located within the sparsely drilled, eastern portion of the Capitan Zone.  The hole successfully intersected multiple zones of mineralization in the Hanging Wall zone, starting from 15.2m, with the strongest interval returning 0.30 g/t AuEq over 19.8 meters, extending the zone approximately 120-135m downdip from the closest drillholes.

 

 

Capitan’s CEO, Alberto Orozco, stated: We are continuing to test extensions of the gold-silver mineralization at the Capitan zone with results to date, demonstrating that the mineralized envelope continues to grow. It is important to note we are also defining new targets as our understanding of the geology continues to evolve. The drill holes in this release successfully tested the on-strike continuity of the Capitan zone both to the northwest and to the southeast of the current 43-101 resource. Mineralization remains open along strike in both directions and at depth.”

 

Figure 1: 2020-2021 Drill Hole Map at Capitan Hill Target

Table 1. Table of Drill Results (Holes 18 – 20)

 

Hole Name Az. Dip Section Zone From (m) To (m) Interval (m) AuEq (g/t) * Au (g/t) Ag (g/t) OX-SUL
21-CARC-18                      
Interval 28 65° -200 Hanging Wall 15.2 27.4 12.2 0.22 0.22 NSV OX
Interval       Hanging Wall 48.8 74.7 25.9 0.17 0.17 NSV OX
Interval       Hanging Wall 82.3 102.1 19.8 0.30 0.30 NSV OX
21-CARC-19***                      
Interval 28 65° 550 Capitan Main 129.5 163.1 33.5 0.40 0.32 6.10 OX
21-CARC-20                      
Interval 28 55° 650 Hanging Wall 39.6 57.9 18.3 0.14 0.14 NSV OX
Interval       Capitan Main 109.7 126.5 16.8 0.26 0.24 1.22 OX
CDDH-12-07 (historical hole)                
Interval 20 60° 600 Hanging Wall 26.2 34.5 8.3 0.16 0.16 NSV OX
Interval       Capitan Main 88.4 96.4 8.0 0.18 0.18 NSV OX

Note: Only drill intercept lengths are reported in the table. Drill holes are designed to cut the mineralized zones as close to true width as possible, with true widths ranging from 70-95% of the reported drilled length. 
*Gold equivalent calculated at 80:1 ratio 
**No significant values.
***Hole abandoned in mineralization due to technical issues

Figure 2: Cross Sections

 

Qualified Person & QA/QC:

 

The scientific and technical data contained in this news release pertaining to the Peñoles Project was reviewed and approved by Marc Idziszek, P.Geo, a non-independent qualified person to Capitan Mining, who is responsible for ensuring that the technical information provided in this news release is accurate and who acts as a “qualified person” under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

Capitan Mining Inc. has a Quality Assurance/Quality Control program that includes insertion and verification of control samples including standard reference material, blanks and duplicates consistent with industry standards.

RC drill samples from the Peñoles Project are collected and split at the drill site using a Gilson Universal Splitter. The samples are stored in either plastic bags (dry) or micropore bags (wet) and secured with plastic zip-ties and then transported to the preparation laboratory of Bureau Veritas in Hermosillo, Sonora. The sample pulps are then transported to the Bureau Veritas’ laboratory in Vancouver, where they are assayed for gold by fire assay with atomic absorption finish (FA430 assay method code; 0.005 to 10 ppm detection limit). Samples over 10 ppm Au are assayed with gravimetric finish (Assay code FA530). All samples are also assayed by ICP-ES (code AQ300) for a suite of 33 elements.

All summarized intervals reported in this press release were calculated using a 0.10 ppm Au cut-off grade. Intervals contain no more than 3 metres of internal dilution. High grades have not been capped.

About Capitan Mining Inc.:

 

Capitan Mining is a well-funded junior exploration company focused on its 100% owned gold and silver Peñoles Project in Durango, Mexico. The company is led by a management team that has successfully advanced and developed several heap leach operations in Mexico over the past 16 years.

Posted March 8, 2021

Share this news article

MORE or "UNCATEGORIZED"


Drilling intersects 505m of mineralized porphyry at Brama target, Bramaderos Project, Ecuador

Assays include 84m at 0.8g/t gold and 0.11% copper; 216m at 0.61g... READ MORE

June 21, 2021

Nova Royalty Acquires a 1.0% Net Proceeds Royalty on the West Wall Copper Project Jointly Owned by Anglo American and Glencore

Nova Royalty Corp. (TSX-V: NOVR) (OTCQB: NOVRF) is pleased to ann... READ MORE

June 18, 2021

Nevada Exploration Closes Oversubscribed $4.75M Financing

Nevada Exploration Inc. (TSX-V:NGE) (OTCQB:NVDEF) is pleased to a... READ MORE

June 18, 2021

Karus Gold Identifies Multiple Gold Vein Corridors at FG Gold

15,000 Meter Drill Program Planned to Expand Known Corridors and Discover New Corridors at De... READ MORE

June 17, 2021

Amarillo updates share capital after exercise of warrants and options

Research Capital Corporation (formerly Mackie Capital Corporation... READ MORE

June 17, 2021

Copyright 2021 The Prospector News