The Prospector News

Canada Nickel Announces Positive Exploration Results and Confirms New Discovery at Mann Township Properties

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Canada Nickel Announces Positive Exploration Results and Confirms New Discovery at Mann Township Properties

 

 

 

 

 

Highlights

  • Positive results continue at Mann West with 28 of 31 holes with intervals greater than 0.3% nickel including 0.52% nickel over 37.5 metres in MAN24-61 within 0.28% nickel over 356 metres
  • New discovery at Mann South with MAN24-81 delivering 0.24% nickel over 508 metres
  • Several holes with anomalous PGM horizons such as 0.82 g/t Pt+Pd over 18.6 metres and 0.77 g/t Pt+Pd over 24.5 metres in MAN24-100C at Mann South
  • Over 117,000 metres successfully drilled on 14 properties to date in 2024 as part of regional exploration program – on-track to deliver six additional resources in 2025

 

Canada Nickel Company Inc.  (TSX-V: CNC) (OTCQX: CNIKF) is pleased to announce additional successful results from its 2024 exploration program from three separate properties at Mann West, Mann Central, and Mann South.

 

As part of its ongoing regional exploration program, the Company has now successfully drilled over 117,000 metres on 14 properties, including the Mann properties, all located within 100 kilometres of Timmins, Ontario in the Timmins Nickel District.

 

Canada Nickel’s CEO Mark Selby said, “Today we announce another set of excellent results from our 2024 regional exploration program from three separate targets as we continue to unlock the potential of the Timmins Nickel District. Today’s results confirm the significance of the discovery of Mann West with strong mineralization across a strike length of 1.7 kilometres long by 0.6 kilometres wide, and remaining open in multiple direction. The Company also confirms a prospective new discovery at Mann South while providing further positive results at Mann Central. We look forward to publishing six additional resources, in addition to Crawford and Deloro, from now through the first half of 2025, clearly demonstrating the scale of the nickel sulphide potential of the Timmins Nickel District.”

 

Mann Property

 

The Mann property is located 22 kilometres east of Crawford between Timmins and Cochrane and is 80% owned by Canada Nickel and 20% by Noble Mineral Exploration. The Company has completed a drill program on four separate targets within the property in 2024, Mann North, Mann West (together formerly Mann Northwest), Mann Central and Mann South. (Figure 1). This release provides an assay update from 31 holes, 16 holes at Mann West, 11 holes at Mann South, and four holes at Mann Central.

 

Mann West       

 

Mann West is approximately 3.5 kilometres long by up to 1.1 kilometres wide (covering 3.4 square kilometres). The drill program completed focused on the southern half of the target with drilling completed over a strike length of 1.7 kilometres and a width of at least 600 metres. All drillholes intersected long sections of well-serpentinized peridotite and minor dunite with disseminated and visible nickel sulphide mineralization consisting primarily of pentlandite and heazlewoodite. The Company has drilled a total of 39 holes to date at Mann West (Figure 2), with 31 holes drilled during the 2024 program. With this drilling, the Company has completed the first phase of exploration that is required for an initial resource estimate, expected in the first quarter of 2025. Assays from 16 additional holes are presented in this release.

 

Table 1 – Drilling highlights Mann Properties

 

Hole ID From (m) To (m) Length (m)* Ni % Co % Pd g/t Pt g/t Cr % Fe % S %
Mann West
MAN24-42 9.0 345.2 336.2 0.24 0.012 0.004 0.007 0.20 6.40 0.068
and 371.7 402.0 30.3 0.19 0.010 0.003 0.005 0.38 6.82 0.053
MAN24-61 17.8 374.3 356.5 0.28 0.012 0.033 0.017 0.26 5.98 0.133
including 75.0 112.5 37.5 0.52 0.013 0.107 0.058 0.14 5.80 0.203
MAN24-70 18.0 501.0 483.0 0.24 0.011 0.007 0.008 0.27 6.12 0.067
including 144.0 172.5 28.5 0.29 0.011 0.007 0.007 0.14 5.52 0.076
MAN24-73 74.2 500.4 426.2 0.25 0.012 0.009 0.009 0.25 6.30 0.061
MAN24-74 7.9 278.5 270.6 0.19 0.014 0.027 0.016 0.40 7.40 0.057
including 25.5 31.5 6.0 0.31 0.013 0.028 0.013 0.82 6.67 0.125
and 318.0 402.0 84.0 0.24 0.013 0.003 0.005 0.16 7.45 0.026
MAN24-76 12.6 495.0 482.4 0.26 0.011 0.011 0.010 0.16 5.95 0.042
including 81.0 117.0 36.0 0.29 0.012 0.036 0.014 0.16 6.11 0.089
and 162.0 196.5 34.5 0.31 0.011 0.010 0.012 0.13 5.24 0.024
MAN24-78 19.4 402.0 382.6 0.24 0.013 0.012 0.010 0.38 6.54 0.053
including 261.0 294.0 33.0 0.30 0.013 0.031 0.021 0.52 6.67 0.100
including 274.5 282.0 7.5 0.41 0.015 0.057 0.027 0.72 6.95 0.178
MAN24-82 22.0 481.5 459.5 0.21 0.012 0.017 0.016 0.37 6.76 0.047
including 61.5 360.0 298.5 0.25 0.012 0.019 0.013 0.35 6.17 0.050
including 255.0 277.5 22.5 0.30 0.013 0.025 0.014 0.58 5.91 0.069
MAN24-83 6.0 403.0 397.0 0.21 0.013 0.016 0.011 0.58 7.43 0.087
including 144.0 195.9 51.9 0.27 0.014 0.030 0.024 0.68 7.87 0.064
and 305.5 336.0 30.5 0.27 0.013 0.019 0.009 0.60 6.30 0.080
MAN24-85 69.0 493.0 424.0 0.25 0.012 0.012 0.008 0.26 6.25 0.042
MAN24-86 14.2 462.0 447.8 0.23 0.012 0.006 0.006 0.41 6.33 0.027
MAN24-89 99.0 191.2 92.2 0.22 0.012 0.013 0.009 0.47 6.71 0.042
and 210.6 428.9 218.3 0.24 0.012 0.009 0.008 0.35 6.31 0.053
including 386.0 395.0 9.0 0.35 0.013 0.054 0.020 0.75 6.45 0.120
MAN24-92 27.4 426.9 399.5 0.25 0.012 0.016 0.008 0.39 6.27 0.046
including 267.0 286.5 19.5 0.34 0.015 0.083 0.034 0.66 6.57 0.114
and 324.0 349.5 25.5 0.30 0.012 0.037 0.015 0.57 6.29 0.125
and 433.6 501.0 67.4 0.20 0.013 0.013 0.021 0.50 7.35 0.047
MAN24-93 18.0 391.0 373.0 0.24 0.012 0.009 0.007 0.34 6.43 0.039
and 406.8 470.0 63.2 0.16 0.011 0.005 0.004 0.36 7.34 0.031
MAN24-94 102.0 501.0 399.0 0.24 0.012 0.012 0.009 0.39 6.50 0.039
including 400.5 415.5 15.0 0.30 0.011 0.044 0.021 0.57 6.57 0.083
MAN24-97 18.0 360.0 342.0 0.21 0.013 0.015 0.009 0.37 6.63 0.053
and 406.5 501.0 94.5 0.23 0.012 0.003 0.003 0.39 7.10 0.021
*True width undetermined. All lengths are drillhole lengths.
             

Mann South

 

This target is approximately 5.9 kilometres long by up to 1.2 kilometres wide, having an arcuate and irregular shape, with an overall area of 4.1 square kilometres. The Company’s drill program at Mann South started in August 2024 consisting of 20 drillholes, all of which intersected serpentinized peridotite and dunite. Assay results for 11 drillholes are provided in this release with nine drillhole assay results still pending. Mineralogical analyses are underway to help identify and prioritize the best areas, although almost half of the strike length of the target remains untested (Figure 3).

 

Table 2 – Mann South drilling Highlights

 

Hole ID From (m) To (m) Length (m)* Ni % Co % Pd g/t Pt g/t Cr % Fe % S %
Mann South
MAN24-66 39.0 139.5 100.5 0.23 0.013 0.003 0.003 0.29 8.03 0.070
and 187.5 402.0 214.5 0.18 0.013 0.003 0.004 0.43 6.61 0.019
MAN24-72 54.5 501.0 446.5 0.20 0.013 0.005 0.006 0.43 6.80 0.019
MAN24-75 16.9 420.0 403.1 0.24 0.010 0.018 0.006 0.30 7.92 0.051
MAN24-77 39.0 46.0 7.0 0.44 0.017 0.051 0.126 0.57 9.28 0.036
and 60.0 448.5 388.5 0.14 0.014 0.019 0.013 0.41 6.96 0.016
MAN24-81 44.3 552.0 507.7 0.24 0.011 0.003 0.003 0.38 7.55 0.056
MAN24-84 28.4 501.0 472.6 0.24 0.011 0.003 0.003 0.42 7.70 0.057
MAN24-90 49.3 501.0 451.7 0.23 0.012 0.004 0.005 0.37 6.33 0.015
MAN24-91 49.0 323.3 274.3 0.17 0.013 0.004 0.004 0.44 6.93 0.043
and 338.7 483.0 144.3 0.22 0.012 0.003 0.003 0.37 6.13 0.021
MAN24-99 51.3 402.0 350.7 0.17 0.013 0.004 0.012 0.46 6.60 0.011
MAN24-100C 21.0 112.4 91.4 0.16 0.014 0.036 0.096 0.37 7.46 0.010
and 131.0 172.0 41.0 0.22 0.012 0.010 0.010 0.61 5.69 0.031
and 340.5 378.4 37.9 0.19 0.013 0.005 0.003 0.56 6.52 0.027
MAN24-103 34.0 402.0 368 0.24 0.012 0.027 0.003 0.36 7.67 0.016
*True width undetermined. All lengths are drillhole lengths.

 

Mann Central

 

The outline of the ultramafic body at Mann Central is estimated by magnetics to be 4.5 kilometres long and between 0.5 to 1.0 kilometres wide (or 3.1 square kilometres). Drilling at this target was completed during the spring/summer of 2024 and now totals 32 drillholes, 27 of which were drilled during the 2024 program. Mineralization is more consistent near the center of the target over an area of 1.9 kilometres by 600 metres (1.1 square kilometres). This release provides an update for four drillholes (Table 3), all of which intersected peridotite.

 

Anomalous platinum group metals (PGM) consisting of platinum (Pt) and palladium (Pd) were identified in several holes, predominantly within pyroxenite units near the peridotite contacts on all properties (Table 4).

 

Table 3 – Mann Central drilling Highlights

 

Hole ID From (m) To (m) Length (m)* Ni % Co % Pd g/t Pt g/t Cr % Fe % S %
Mann Central
MAN24-41 111.9 153.0 41.1 0.18 0.012 0.004 0.005 0.52 7.42 0.096
MAN24-48 75.0 402.0 327.0 0.21 0.011 0.005 0.006 0.29 6.58 0.084
including 148.5 157.5 9.0 0.35 0.015 0.019 0.008 0.14 8.73 0.199
MAN24-64 14.3 48.5 34.2 0.22 0.012 0.005 0.008 0.18 6.66 0.584
and 55.8 334.9 279.1 0.19 0.012 0.014 0.017 0.40 7.00 0.053
MAN24-68 366.0 406.0 40.0 0.24 0.012 0.003 0.006 0.15 8.77 0.028

*True width undetermined. All lengths are drillhole lengths.

 

Table 4 – Mann Properties PGM Highlights

 

Hole ID From

(m)

To

(m)

Length

(m)

Pt+Pd

(g/t)

Pd

g/t)

Pt

(g/t)

Ni

(%)

Co

(%)

Cr

(%)

Fe

(%)

S

(%)

Mann West
MAN24-74 278.5 309.0 30.5 0.48 0.28 0.20 0.037 0.007 0.394 5.763 0.011
MAN24-82 481.5 501.0 19.5 0.52 0.28 0.24 0.024 0.007 0.324 5.919 0.014
MAN24-97 378.5 400.5 22 0.40 0.23 0.17 0.040 0.008 0.360 5.179 0.018
Mann South
MAN24-66 160.0 180.7 20.7 0.49 0.33 0.16 0.026 0.005 0.362 3.957 0.017
MAN24-72 44.0 54.5 10.5 0.37 0.12 0.24 0.037 0.009 0.313 5.849 0.011
MAN24-77 37.0 60.0 23 0.55 0.16 0.39 0.216 0.012 0.409 6.386 0.016
and 444.0 457.5 13.5 0.34 0.10 0.24 0.098 0.013 0.596 6.776 0.015
and 492.0 529.5 37.5 0.35 0.14 0.21 0.055 0.008 0.499 5.450 0.008
MAN24-100C 75.0 91.5 16.5 0.53 0.11 0.42 0.131 0.013 0.314 6.600 0.011
and 112.4 131.0 18.6 0.82 0.31 0.51 0.064 0.009 0.474 5.288 0.006
and 172.0 196.5 24.5 0.77 0.32 0.46 0.048 0.009 0.518 5.375 0.007
Mann Central
MAN24-64 334.9 351.5 16.6 0.52 0.33 0.19 0.043 0.008 0.371 5.291 0.019

 

 

Table 5: Drillhole Orientation

 

Hole ID Easting (mE) Northing (mN) Azimuth (⁰) Dip (⁰) Length (m)
MANN WEST
MAN24-42 496024 5411983 35 -50 402
MAN24-61 496859 5412156 215 -50 402
MAN24-70 496492 5412296 215 -50 501
MAN24-73 496604 5412445 215 -50 500
MAN24-74 495656 5412189 215 -85 402
MAN24-76 496560 5412057 215 -50 495
MAN24-78 495969 5412226 215 -85 402
MAN24-82 495980 5412379 215 -50 501
MAN24-83 496980 5412318 215 -50 450
MAN24-85 496493 5412451 215 -50 493
MAN24-86 496442 5411894 215 -50 489
MAN24-89 496297 5412494 215 -50 495
MAN24-92 496177 5412332 215 -50 501
MAN24-93 496373 5412289 215 -50 471
MAN24-94 496098 5412537 215 -50 501
MAN24-97 495765 5412456 220 -50 501
MANN SOUTH
MAN24-66 503460 5408195 35 -50 402
MAN24-72 503650 5408420 35 -50 501
MAN24-75 502081 5405730 55 -50 420
MAN24-77 502345 5405431 50 -50 540
MAN24-81 503460 5408195 220 -50 552
MAN24-84 502406 5408781 35 -50 501
MAN24-90 503140 5409045 35 -50 501
MAN24-91 503358 5408852 35 -50 483
MAN24-99 502349 5405667 55 -50 402
MAN24-100C 502169 5405546 55 -50 378
MAN24-103 501960 5405890 55 -50 402
MANN CENTRAL
MAN24-41 498466 5410751 145 -55 153
MAN24-48 498066 5410676 180 -50 402
MAN24-64 498058 5410435 180 -50 406
MAN24-68 497871 5410435 180 -50 402

 

Quality Assurance and Control, Drilling and Assaying

 

Edwin Escarraga, MSc, P.Geo., a “qualified person” within the meaning of National Instrument 43-101– Standards of Disclosure for Mineral Projects, is responsible for the on-going drilling and sampling program, including quality assurance (QA) and quality control (QC). The core is collected from the drill in sealed core trays and transported to the core logging facility. The core is marked and sampled at 1.5 metre lengths and cut with a diamond blade saw. One set of samples is transported in secured bags directly from the Canada Nickel core shack to Actlabs Timmins, while a second set of samples is securely shipped to SGS Lakefield for preparation, with analysis performed at SGS Burnaby. All are ISO/IEC 17025 accredited labs. Analysis for precious metals (gold, platinum and palladium) are completed by Fire Assay while analysis for nickel, cobalt, sulphur and other elements are performed using a peroxide fusion and ICP-OES analysis. Certified standards and blanks are inserted at a rate of 3 QA/QC samples per 20 core samples making a batch of 60 samples that are submitted for analysis.

 

Qualified Person and Data Verification

 

Stephen J. Balch P.Geo. (ON), VP Exploration of Canada Nickel and a “qualified person” within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has verified the data disclosed in this news release, and has otherwise reviewed and approved the technical information in this news release on behalf of Canada Nickel Company Inc.

 

About Canada Nickel Company

 

Canada Nickel Company Inc. is advancing the next generation of nickel-sulphide projects to deliver nickel required to feed the high growth electric vehicle and stainless steel markets. Canada Nickel Company has applied in multiple jurisdictions to trademark the terms NetZero NickelTM, NetZero CobaltTM, NetZero IronTM and is pursuing the development of processes to allow the production of net zero carbon nickel, cobalt, and iron products. Canada Nickel provides investors with leverage to nickel in low political risk jurisdictions. Canada Nickel is currently anchored by its 100% owned flagship Crawford Nickel-Cobalt Sulphide Project in the heart of the prolific Timmins-Cochrane mining camp.

 

 


Figure 1 – Mann Properties (CNW Group/Canada Nickel Company Inc.)

 

 

 


Figure 2 – Mann West (CNW Group/Canada Nickel Company Inc.)

 

 

 


Figure 3 – Mann South (CNW Group/Canada Nickel Company Inc.)

 

 

 


Figure 4 – Mann Central (CNW Group/Canada Nickel Company Inc.)

 

Posted December 11, 2024

Share this news article

MORE or "UNCATEGORIZED"


PTX Metals Announces Closing of the First Tranche of the Over-Subscribed Private Placement

PTX Metals Inc. (CSE: PTX) (OTCQB: PANXF) (Frankfurt: 9PX)  a mi... READ MORE

December 11, 2024

LAHONTAN GOLD ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR SANTA FE

Lahontan Gold Corp. (TSX-V:LG) (OTCQB:LGCXF) is pleased to announ... READ MORE

December 11, 2024

Azimut Reports Drilling Results from the Pilipas Property, James Bay Region, Quebec

1.22% Li2O over 53.20 m, including 1.70% Li2O over 22.30 m ... READ MORE

December 11, 2024

GFG Announces Proceeds of C$3.7 Million from Warrant Exercise Accelerates Exploration Programs in Timmins

GFG Resources Inc. (TSX-V: GFG) (OTCQB: GFGSF) announces that it ... READ MORE

December 11, 2024

Copyright 2024 The Prospector News