The Prospector News

Cameco: Strike Notice Prompts Shutdown of McArthur River and Key Lake Operations

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Cameco: Strike Notice Prompts Shutdown of McArthur River and Key Lake Operations

 

 

 

 

 

Cameco (TSX:CCO) (NYSE:CCJ) announced today that, in response to receiving strike notice from the United Steelworkers Local 8914, the company initiated a shutdown of its McArthur River mine and Key Lake mill operations and will cease production at those sites.
 

The union has advised Cameco of its intention to commence strike action, effective 12:01 a.m. on August 30, 2014. In response to the strike notice, Cameco issued a lockout notice effective 12:01 a.m. on August 30, 2014 to assure a safe and orderly shutdown of its facilities. Cameco is continuing to meet with the union during the 72-hour notice period.
 

The work stoppage involves approximately 535 unionized employees at the two operations. Contract negotiations began in November 2013. The previous four-year contract expired December 31, 2013. In July, the company and union jointly applied for conciliation under the Canada Labour Code.
 

A labour disruption is not expected to affect the company’s 2014 uranium delivery commitments to customers. Cameco may draw on a variety of supply sources including primary production, and existing purchase commitments and inventories.
 

About Cameco
 

Cameco is one of the world’s largest uranium producers, a significant supplier of conversion services and one of two CANDU fuel manufacturers in Canada. Our competitive position is based on our controlling ownership of the world’s largest high-grade reserves and low-cost operations. Our uranium products are used to generate clean electricity in nuclear power plants around the world. We also explore for uranium in the Americas, Australia and Asia. Our shares trade on the Toronto and New York stock exchanges. Our head office is in Saskatoon, Saskatchewan.

Posted August 27, 2014

Share this news article

MORE or "UNCATEGORIZED"


First Phosphate Intersects 92.5 m of 11.82% Igneous Phosphate Starting at Surface at Its Begin-Lamarche Project in Saguenay-Lac-St-Jean, Quebec, Canada

First Phosphate Corp. (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) is plea... READ MORE

April 23, 2024

Kuya Silver Provides Update on Mine Start-up and Uncovers New Major Silver-Mineralized Vein Zone South of the Bethania Mine, Peru

Kuya Targeting Commencement of Production at Bethania in H1 2024 ... READ MORE

April 23, 2024

Silvercorp Reports Operational Results and Financial Results Release Date for Fiscal 2024, and Issues Fiscal 2025 Production, Cash Costs, and Capital Expenditure Guidance

Silvercorp Metals Inc. (TSX: SVM) (NYSE American: SVM) reports pr... READ MORE

April 23, 2024

Lithium Ionic Expands Newly Discovered Zone at Salinas; Drills 1.53% Li2O over 15m, incl. 2.31% Li2O over 8m; 1.15% Li2O over 19m, incl. 1.67% Li2O over 10m, and 1.32% Li2O over 14m

Excellent follow-up drill results from high-grade discovery holes... READ MORE

April 23, 2024

Solaris Reports First Drilling Results from 2024 Program and Exploration Update, Including 150m of 0.67% CuEq within 384m of 0.51% CuEq and 284m of 0.53% CuEq from Near Surface

Solaris Resources Inc. (TSX: SLS) (NYSE: SLSR) is pleased to repo... READ MORE

April 23, 2024

Copyright 2024 The Prospector News