Highlights include 58.3m at 3.88g/t PGM+Au, 0.12% Ni including 15m at 6.41g/t PGM+Au, 0.11% Ni,and 45.7m at 3.60g/t PGM+Au, 0.08% Ni including 13.7m at 8.47g/t PGM+Au, 0.13% Ni
Bravo Mining Corp. (TSX-V: BRVO) (OTCQX: BRVMF), announced that it has received assay results from eight diamond drill holes five from the North Sector and three from the Southwest Sector at its 100% owned Luanga palladium + platinum + rhodium + gold + nickel project, located in the Carajás Mineral Province, state of Pará, Brazil.
“Drilling in the North Sector continues to be encouraging, with wider and higher-grade PGM+Au+Ni mineralization at shallow depths. DDH24LU235 is now the best drill hole intercept to date at Luanga and starts at only 10.5m from surface. In comparison, the Central Sector, which currently contains the largest proportion of Mineral Resource Estimate (“MRE”) tonnage at Luanga, has been extended to depths in excess of 400m, suggesting considerable room for further extensions to depth in the North Sector,” said Luis Azevedo, Chairman and CEO of Bravo. “We also continue to see some evidence of copper sulphide mineralization at depth in the North, as seen in drill hole DDH24LU235, suggesting potential for different styles of mineralization at Luanga.”
Highlights Include:
HOLE-ID | From | To | Thickness (m) |
Pd | Pt | Rh | Au | PGM + Au | Ni* (%) Sulphide |
Cu (%) Sulphide |
TYPE |
(m) | (m) | (g/t) | (g/t) | (g/t) | (g/t) | (g/t) | |||||
DDH23LU222 | 41.80 | 43.32 | 1.52 | 0.02 | <0.01 | <0.01 | <0.01 | 0.02 | 0.88 | FR | |
DDH24LU233 | 46.50 | 56.80 | 10.30 | 1.30 | 0.78 | 0.18 | 0.02 | 2.28 | 0.13 | FR | |
DDH24LU234 | 54.40 | 92.40 | 38.00 | 0.98 | 0.63 | 0.12 | 0.06 | 1.79 | 0.06 | FR | |
DDH24LU235 | 10.50 | 20.50 | 10.00 | 2.32 | 0.86 | 0.14 | 0.04 | 3.36 | NA | Ox | |
And | 21.50 | 79.80 | 58.30 | 2.18 | 1.41 | 0.25 | 0.04 | 3.88 | 0.12 | FR | |
Including | 49.80 | 64.80 | 15.00 | 3.74 | 2.23 | 0.37 | 0.07 | 6.41 | 0.11 | FR | |
And | 93.80 | 139.50 | 45.70 | 2.10 | 1.20 | 0.26 | 0.05 | 3.60 | 0.08 | FR | |
Including | 102.85 | 116.50 | 13.65 | 5.13 | 2.67 | 0.56 | 0.11 | 8.47 | 0.13 | FR | |
And | 236.30 | 239.30 | 3.00 | 0.00 | 0.00 | 0.00 | 0.03 | 0.04 | 0.01 | 1.01 | FR |
Notes: | All ‘From’, ‘To’ depths, and ‘Thicknesses’ are downhole. ‘NA’ Not applicable for Oxide material. | ||||||||||
Given orientation of drilling and mineralization, intercepts are estimated at 125% to 140% of true thickness. | |||||||||||
Type: Ox = Oxide. FR = Fresh Rock. Recovery methods and results will differ based on the type of mineralization. | |||||||||||
* Bravo’s nickel grades are sulphide nickel, and do not include non-recoverable silicate nickel, unlike historical total nickel assays. |
Luanga Drilling Update
Results from eight diamond drill holes have been received from the North and Southwest Sectors. All the drill holes herein reported are angled holes (-60 degrees), towards a 090° azimuth in the North and 360° azimuth in the Southwest. Together, this set of drill holes comprise a total of 1,865 metres of diamond drilling.
Section 1 (Figure 1) in the North Sector shows a new infill drill section with DDH24LU235 being the deepest drill hole on the section, clearly showing significantly better mineralization at depth, both in thickness and grade, in all three distinct zones of mineralization. Two of the mineralised zones now contain significant high-grade portions within the broader mineralised zones. This high-grade mineralization is still only defined to approximately 120m below surface, with additional drilling now planned to test for potential extension at depth. Results bode well for future MRE growth.
Section 2 (Figure 2) in the North Sector also shows evidence of increasing widths and grades at shallow depths, with mineralization still open at depth. DDH24LU234 (38.0m at 1.79g/t PGM+Au, 0.06% Ni) is a significant improvement over the up-dip intercept in DDH24LU232 (9.8m at 0.86g/t PGM+Au) and, as with Section 1, these results also bode well for future MRE growth, with significant potential open at depth.
Drill Results Status Update
A total of 269 drill holes have been completed by Bravo to date, for 57,648.45 metres, including 8 metallurgical holes (not subject to routine assaying). Results have been reported for 235 Bravo drill holes to date. Assay results for 26 Bravo drill holes that have been completed are currently outstanding (excluding the metallurgical holes).
Complete Table of Recent Intercepts.
HOLE-ID | From | To | Thickness (m) |
Pd | Pt | Rh | Au | PGM + Au | Ni* (%) Sulphide |
Cu (%) Sulphide |
TYPE |
(m) | (m) | (g/t) | (g/t) | (g/t) | (g/t) | (g/t) | |||||
DDH23LU220 | No significant results | ||||||||||
DDH23LU222 | 41.80 | 43.32 | 1.52 | 0.02 | <0.01 | <0.01 | <0.01 | 0.02 | 0.88 | FR | |
And | 226.00 | 238.00 | 12.00 | 0.79 | 0.31 | 0.05 | 0.02 | 1.16 | 0.13 | FR | |
DDH23LU225 | 212.35 | 221.35 | 9.00 | 0.62 | 0.24 | 0.03 | 0.01 | 0.91 | 0.07 | FR | |
DDH23LU231 | 9.00 | 44.90 | 35.90 | 0.65 | 0.32 | 0.05 | 0.02 | 1.03 | NA | Ox | |
And | 53.75 | 60.00 | 6.25 | 0.76 | 0.38 | 0.07 | 0.07 | 1.27 | 0.25 | FR | |
And | 65.00 | 76.00 | 11.00 | 0.67 | 0.39 | 0.07 | 0.01 | 1.13 | 0.17 | FR | |
DDH23LU232 | 0.00 | 3.00 | 3.00 | 0.59 | 0.29 | 0.05 | 0.01 | 0.93 | NA | Ox | |
And | 8.00 | 11.00 | 3.00 | 0.54 | 0.26 | 0.04 | 0.02 | 0.86 | NA | Ox | |
And | 24.05 | 31.80 | 9.75 | 0.53 | 0.27 | 0.04 | 0.02 | 0.86 | 0.13 | FR | |
And | 92.80 | 118.80 | 26.00 | 0.83 | 0.39 | 0.07 | 0.10 | 1.39 | 0.13 | FR | |
DDH24LU233 | 0.00 | 15.90 | 15.90 | 0.79 | 0.34 | 0.06 | 0.02 | 1.21 | NA | Ox | |
And | 27.90 | 38.90 | 11.00 | 0.82 | 0.29 | 0.07 | 0.02 | 1.19 | 0.03 | FR | |
And | 46.50 | 56.80 | 10.30 | 1.30 | 0.78 | 0.18 | 0.02 | 2.28 | 0.13 | FR | |
And | 91.80 | 109.40 | 17.60 | 0.39 | 0.15 | 0.02 | 0.02 | 0.58 | 0.17 | FR | |
And | 168.75 | 171.90 | 3.15 | 0.65 | 0.28 | 0.05 | 0.04 | 1.02 | 0.09 | FR | |
DDH24LU234 | 0.00 | 5.20 | 5.20 | 0.77 | 0.24 | 0.04 | 0.03 | 1.08 | NA | Ox | |
And | 54.40 | 92.40 | 38.00 | 0.98 | 0.63 | 0.12 | 0.06 | 1.79 | 0.06 | FR | |
DDH24LU235 | 10.50 | 20.50 | 10.00 | 2.32 | 0.86 | 0.14 | 0.04 | 3.36 | NA | Ox | |
And | 21.50 | 79.80 | 58.30 | 2.18 | 1.41 | 0.25 | 0.04 | 3.88 | 0.12 | FR | |
Including | 49.80 | 64.80 | 15.00 | 3.74 | 2.23 | 0.37 | 0.07 | 6.41 | 0.11 | FR | |
And | 93.80 | 139.50 | 45.70 | 2.10 | 1.20 | 0.26 | 0.05 | 3.60 | 0.08 | FR | |
Including | 102.85 | 116.50 | 13.65 | 5.13 | 2.67 | 0.56 | 0.11 | 8.47 | 0.13 | FR | |
And | 149.10 | 191.20 | 42.10 | 0.53 | 0.22 | 0.03 | 0.04 | 0.82 | 0.04 | FR | |
And | 236.30 | 239.30 | 3.00 | 0.00 | 0.00 | 0.00 | 0.03 | 0.04 | 0.01 | 1.01 | FR |
Notes: | All ‘From’, ‘To’ depths, and ‘Thicknesses’ are downhole. ‘NA’ Not applicable for Oxide material. | ||||||||||
Given orientation of drilling and mineralization, intercepts are estimated at 125% to 140% of true thickness. | |||||||||||
Type: Ox = Oxide. FR = Fresh Rock. Recovery methods and results will differ based on the type of mineralization. | |||||||||||
* Bravo’s nickel grades are sulphide nickel, and do not include non-recoverable silicate nickel, unlike historical total nickel assays |
About Bravo Mining Corp.
Bravo is a Canadian and Brazil-based mineral exploration and development company focused on advancing its Luanga PGM+Au+Ni Project in the world-class Carajás Mineral Province of Brazil.
The Luanga Project is situated on mature freehold farming land and benefits from being in a location close to operating mines and a mining-experienced workforce, with excellent access and proximity to existing infrastructure, including road, rail, and clean renewable hydro grid power. A fully funded 63,000m infill, step out and exploration drilling and trenching program is well advanced for 2024. Bravo’s current Environmental, Social and Governance activities includes planting more than 18,000 high-value trees in the project area, hiring and contracting locally, and ensuring protection of the environment during its exploration activities.
Technical Disclosure
Technical information in this news release has been reviewed and approved by Simon Mottram, F.AusIMM (Fellow Australia Institute of Mining and Metallurgy), President of Bravo Mining Corp. who serves as the Company’s “qualified person” as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects. Mr. Mottram has verified the technical data and opinions contained in this news release.
Schedule 1: Drill Hole Collar Details
HOLE-ID | Company | East (m) | North (m) | RL (m) | Datum | Depth (m) | Azimuth | Dip | Sector |
DDH23LU220 | Bravo | 657800.01 | 9339871.28 | 221.471 | SIRGAS2000_UTM_22S | 200.05 | 360.00 | -60.00 | Southwest |
DDH23LU222 | Bravo | 657000.42 | 9339411.47 | 243.035 | SIRGAS2000_UTM_22S | 340.35 | 360.00 | -60.00 | Southwest |
DDH23LU225 | Bravo | 656849.98 | 9339305.59 | 232.687 | SIRGAS2000_UTM_22S | 356.60 | 360.00 | -60.00 | Southwest |
DDH24LU231 | Bravo | 659505.03 | 9343323.01 | 259.557 | SIRGAS2000_UTM_22S | 150.65 | 90.00 | -60.00 | North |
DDH24LU232 | Bravo | 659517.04 | 9343422.99 | 240.554 | SIRGAS2000_UTM_22S | 160.55 | 90.00 | -60.00 | North |
DDH24LU233 | Bravo | 659457.20 | 9343323.05 | 260.188 | SIRGAS2000_UTM_22S | 223.20 | 90.00 | -60.00 | North |
DDH24LU234 | Bravo | 659464.78 | 9343422.96 | 243.986 | SIRGAS2000_UTM_22S | 180.40 | 90.00 | -60.00 | North |
DDH24LU235 | Bravo | 659401.00 | 9343322.99 | 254.545 | SIRGAS2000_UTM_22S | 253.60 | 90.00 | -60.00 | North |
Schedule 2: Assay Methodologies and QAQC
Samples follow a chain of custody between collection, processing, and delivery to the SGS Geosol laboratory in Parauapebas, state of Pará, Brazil. The drill core is delivered to the core shack at Bravo’s Luanga site facilities and processed by geologists who insert certified reference materials, blanks, and duplicates into the sampling sequence. Drill core is half cut and placed in secured polyurethane bags, then in security-sealed sacks before being delivered directly from the Luanga site facilities to the Parauapebas SGS Geosol laboratory by Bravo staff. Additional information about the methodology can be found on the SGS Geosol website (SGS) in their analytical guides. Information regarding preparation and analysis of historic drill core is also presented in the table below, where the information is known.
Quality Assurance and Quality Control is maintained internally at the lab through rigorous use of internal certified reference materials, blanks, and duplicates. An additional QAQC program is administered by Bravo using certified reference materials, duplicate samples and blank samples that are blindly inserted into the sample batch. If a QAQC sample returns an unacceptable value an investigation into the results is triggered and when deemed necessary, the samples that were tested in the batch with the failed QAQC sample are re-tested.
Bravo SGS Geosol | ||||
Preparation | Method | Method | Method | Method |
For All Elements | Pt, Pd, Au | Rh | Sulphide Ni, Cu | Trace Elements |
PRPCLI (85% at 200#) | FAI515 | FAI30V | AA04B | ICP40B |
SHAPE \* MERGEFORMAT
Figure 1: North Sector (Section 1 on Figure 3). PGM+Au mineralization significantly wider and higher-grade at depth. (CNW Group/Bravo Mining Corp.)
Figure 2: North Sector (Section 2 on Figure 3). Widths and grades improve significantly as mineralization transitions to fresh rock. (CNW Group/Bravo Mining Corp.)
Figure 3: Location of Bravo Drilling and Sections Reported in this News Release (CNW Group/Bravo Mining Corp.)
Concurrent $11.5 Million Private Placement Equity Financing and P... READ MORE
Highlights: Integrated North Island Project resource estimate dem... READ MORE
Brixton Metals Corporation (TSX-V: BBB) (OTCQB: BBBXF) is pleased... READ MORE
Drillhole WMA082-11 Intersected 6.47% U3O8 Over 25.8 Metres; Including 2... READ MORE
First Ever Drill Assays from the Road IP Target Return 104.7 metr... READ MORE