Aya Gold & Silver Inc. (TSX: AYA) reported its financial and operational results for the fourth quarter and year ended December 31, 2020. All amounts are in US dollars unless otherwise stated.
2020 Highlights (as of December 31, 2020)
2021 Outlook & Year So Far
“Congratulations to the entire Aya team for their hard work and continued dedication in 2020,” said Benoit La Salle, President and CEO. “All areas including operations, exploration and development saw meaningful improvements and even all-time bests, especially in the fourth quarter, setting the stage for a successful 2021. We expect to achieve many milestones at Zgounder in 2021 including record silver production of 1.2 million oz in addition to completing our feasibility study and our most extensive drill program yet, enabling us to reach our strategic goal of 100 million oz of silver resources by year-end. We are executing on our vision and are on a path to generating additional shareholder value through our work at Zgounder and our regional exploration activities in Morocco.”
2020 Annual Highlights
Key Performance Metrics | 2020 | 2019 | Variation
’20 vs ’19 |
|
Operational | ||||
Ore Processed (tonnes) | 128,923 | 100,667 | 28% | |
Average Grade (g/t Ag) | 255 | 218 | 17% | |
Mill Recovery (%) | 68.7% | 64.2% | 7% | |
Silver Ingots Produced (oz) | 439,448 | 286,294 | 53% | |
Silver in Concentrate for Sale Produced (oz) | 286,871 | 166,122 | 73% | |
Total Silver Produced (oz) | 726,319 | 452,416 | 61% | |
Silver Ingots Sold (oz) | 395,489 | 262,837 | 50% | |
Silver in Concentrate for Sale Sold (oz) | 266,079 | 163,068 | 63% | |
Total Silver Sales (oz) | 661,567 | 425,905 | 55% | |
Financial |
||||
Revenues | 13,822,709 | 6,081,400 | 127% | |
Cost of Sales | 9,779,055 | 5,147,137 | 90% | |
Gross Margin | 4,043,654 | 934,263 | 333% | |
Operating (Loss) | (832,832) | 42,921 | (2040%) | |
Net (Loss) Earnings | (1,779,590) | (576,513) | 139% | |
Operating Cash Flows | 1,278,193 | 3,574,536 | (67%) | |
Cash and Restricted Investments Cash | 33,291,691 | 16,628,989 | 100% | |
Change in Working Capital Items | (1,347,195) | 1,286,749 | (207%) | |
Shareholders | ||||
(Loss) Earnings per Share (“EPS”) – basic & diluted | (0.021) | (0.007) |
2020 Annual Financial & Operational Highlights
A portion of the 2020 highlights results from a series of operational changes implemented in late Q3 2020 under the Zgounder operations turnaround plan:
Fourth Quarter 2020 Financial & Operational Highlights
The following highlights were positively impacted by a series of operational changes implemented in late Q3 2020 under the Zgounder operations turnaround plan:
2020 Operations
A 12-month operational optimization plan was launched at Zgounder to achieve its nameplate capacity of 700 tpd. In late Q3 2020, four main operational improvements were implemented including flowsheet reorganization, grade control, selective mining, and milling throughput. The most important improvement was the reconfiguration of the processing flowsheet, which separated the cyanidation and flotation plant operations. Following the operational changes, throughput, ore processing, recoveries, and production substantially increased.
In August, the Corporation launched a feasibility study to assess expansion of the Zgounder Silver Mine capacity from 700 to 2,000 tpd. Since then, the Corporation has engaged several contractors in specific areas related to the feasibility study. Geotechnical, hydrological, and metallurgical field work has already commenced, and a budget of $2.4 million has been set for its completion.
2020 Exploration Review
In 2020, the initial 15,000m exploration program at Zgounder was expanded twice to follow up on strong results, completing the year with 284 diamond drill holes over 19,000m of drilling. The exploration program had two objectives: first, to increase the confidence level of the mineral resources by converting the 28.3 million silver oz of inferred mineral resource into the M&I classification; and second, to identify new prospective mineralization at depth and better characterize the mineral resource potential in the eastern part of the deposit. The Corporation succeeded on both counts, extending the mineralization approximately 90m along the eastern strike extension and at depth.
Following completion of the 2020 exploration program, an updated mineral resource statement for Zgounder was compiled together with drilling results from 2018 and 2019. In addition to M&I mineral resources increasing to 44.4 million oz of silver, an exploration target of 3-6 million tonnes grading 190-295 g/t silver for 20-60 million silver oz was established for Zgounder at depth and along lateral extensions. The exploration target was derived from a larger mineralized envelope including all mineral intersects while excluding the mineral resources reported. The potential quantity and grade of the exploration target are conceptual in nature, and there has been insufficient exploration to define a mineral resource.
2021 Exploration
An initial exploration budget of $6.7 million has been set for Zgounder in 2021 for a total of 41,000m of drilling. Of these 41,000m, 35,000m of diamond drill holes will be completed on the Zgounder mining permit and 6,000m of RC drilling will be conducted on the Zgounder regional permits. The 35,000m drilling program will focus on the exploration target area with the view to further expanding the resource and supporting a maiden reserve statement.
Exploration activities involving field work and geophysics and 9,000m of drilling will commence on the other Moroccan properties, Azegour, Amizmiz and Imiter bis, in the second half of 2021.
About Aya Gold & Silver Inc.
Aya Gold & Silver Inc. is a publicly traded Canadian company focused on the operation, exploration, acquisition and development of silver and gold deposits. Aya is currently operating mining and processing facilities at its Zgounder Silver Mine, an 85%-15% joint venture between its subsidiary, Zgounder Millenium Silver Mining SA, and the Office National des Hydrocarbures et des Mines (“ONHYM”) of the Kingdom of Morocco.
Aya’s mining portfolio also includes the Boumadine polymetallic deposit located in the Anti-Atlas Mountains of Eastern Morocco, which is also a joint venture with ONHYM wherein Aya retains an 85% ownership. Additionally, the Corporation’s portfolio includes the Amizmiz and Azegour properties, both being 100% owned, with gold, tungsten, molybdenum, and copper occurrences in the center of a historical mining district of Morocco.
Unlocking Value Through the Creation of One of Canada’s Lar... READ MORE
Highlights Include: Drill hole FL 24-009 intersected 32.53 metres... READ MORE
Western Copper and Gold Corporation (TSX: WRN) (NYSE American: WR... READ MORE
ENDEAVOUR REPORTS STRONG FY-2023 RESULTS Production of 1.1Moz at AISC of... READ MORE
Orezone Gold Corporation (TSX: ORE) (OTCQX: ORZCF) reported its o... READ MORE