
Operational improvements across key metrics
Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) is pleased to announce record quarterly production, recoveries, and throughput at its Zgounder Silver Mine in the Kingdom of Morocco for the three-month period ended September 30, 2025.
Q3-2025 Operational Summary
“Zgounder delivered another exceptional quarter, achieving record Q3 production, recoveries, and throughput — all while improving grade,” said Benoit La Salle, President & CEO. “Our quarter-over-quarter gains highlight the strength of our team and the benefits of disciplined execution. Building on this quarter’s strong performance we continue to optimize operations, laying the foundation for a solid finish to the year and sustained momentum into 2026.”
Q3-2025 Summary Production Results
| Production Metrics | Q3-2025 | Q2-2025 | Q3-2024 | QoQ Variance |
| Silver production (oz) | 1,346,882 | 1,042,317 | 355,927 | 29% |
| Ore processed (t) | 305,964 | 273,471 | 83,352 | 12% |
| Average head grade (g/t Ag) | 146 | 140 | 161 | 4% |
| Silver recovery (%) | 92.5 | 86.5 | 83.0 | 6% |
| Mill availability (%) | 95.9 | 98.2 | 96.0 | (2%) |
| Mine production (t) | 215,405 | 241,288 | 120,985 | (11%) |
Q3-2025 Operational Update
Underground development and stope sequencing advanced during the quarter, supporting an average mining rate of 1,276 tpd at 158 g/t Ag. Underground tonnage and grade have normalized, positioning the mine for sustained feed grades through year-end.
Open-pit operations during the quarter focused on stripping the northeast section, with waste movement proceeding as planned. Additional mobile equipment arriving in Q4 is expected to lift open-pit ore production above 2,000 tpd by Q1-2026. Blast-movement control and bench-by-bench modeling are expected to further enhance grade control.
Record throughput and recovery were achieved at the processing plant through improved blending, circuit optimization, and increased tailings-pumping capacity, allowing for steadier, higher-rate milling.
Aya expects continued operational improvement through Q4-2025. The mill is currently running above 3,700 tpd, and recoveries maintained above 90%. With over 150,000 tonnes of stockpiled ore available, Zgounder is well positioned heading into the end of the year.
The Corporation remains focused on maximizing cash flow, maintaining cost discipline, and advancing its growth pipeline, including the upcoming Boumadine preliminary economic assessment.
Qualified Person
The technical information contained in this press release have been reviewed and approved by Raphael Beaudoin, P. Eng, Vice-President, Operations, who is a “Qualified Person” as defined under National Instrument 43-101 – Standards of Disclosure for Mineral Projects.
About Aya Gold & Silver Inc.
Aya Gold & Silver Inc. is a rapidly growing, Canada-based silver producer with operations in the Kingdom of Morocco.
The only TSX-listed pure silver mining company, Aya operates the high-grade Zgounder Silver Mine and is exploring its properties along the prospective Anti-Atlas Fault, several of which have hosted past-producing mines and historical resources.
Aya’s management team has been focused on maximizing shareholder value by anchoring sustainability at the heart of its operations, governance, and financial growth plans.
Appia Rare Earths & Uranium Corp. (CSE: API) (OTCQB: APAAF) (FSE: A010) (MUN: A010) (BER: A010) ... READ MORE
Kinterra Capital Corp. and its operating subsidiary, Southwest Critical Materials LLC, are pleased ... READ MORE
Quimbaya Gold Inc. (CSE: QIM) (OTCQB: QIMGF) (FSE: K05) is pleased to announce the closing of its ... READ MORE
InZinc Mining Ltd. (TSX-V: IZN) is pleased to report the Phase 2, 2025 drill program has achieved ou... READ MORE
North Arrow Minerals Inc. (TSX-V: NAR) is pleased to announce the discovery of anomalous gold from ... READ MORE