The Prospector News

Aya Gold & Silver Reports High-Grade Exploration Drill Results at Boumadine

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Aya Gold & Silver Reports High-Grade Exploration Drill Results at Boumadine

Aya Gold & Silver Inc. (TSX: AYA) (NASDAQ: AYA) is pleased to report new drill results at the Boumadine Project from its ongoing infill drill program in the Kingdom of Morocco. These results confirm strong high-grade continuity along the Boumadine Main Trend and support the potential for continued resource growth and scale.

Highlights1

Boumadine Main Trend (5.4km)

  • Multiple additional high-grade intercepts:
    • BOU-DD25-745 intercepted 890 grams per tonne silver equivalent over 51.5 metres (2.05 g/t gold, 535 g/t silver, 3.8% zinc, and 5.9% lead, including 1,504 g/t AgEq over 19.3m (2.17 g/t Au, 1,032 g/t Ag, 5.3% Zn, and 9.8% Pb).
    • BOU-DD25-746 intercepted 665 g/t AgEq over 20.4m (1.63 g/t Au, 410 g/t Ag, 2.8% Zn and 3.4% Pb), including 1,276 g/t AgEq over 5.3m (3.98 g/t Au, 695g/t Ag, 6.1% Zn and 7.2% Pb) and 741 g/t AgEq over 14.5m (5.24 g/t Au, 204 g/t Ag, 3.9% Zn and 2.2% Pb), including 1,112 g/t AgEq over 8.4m (8.79 g/t Au, 276g/t Ag, 4.5% Zn and 2.3% Pb).
    • BOU-DD26-790 intercepted 746 g/t AgEq over 14.9m (0.62 g/t Au, 586 g/t Ag, 1.9% Zn and 3.7% Pb) including 1,227 g/t AgEq over 6.5m (1.05 g/t Au, 971g/t Ag, 1.9% Zn and 3.7% Pb).
    • BOU-DD26-786 intercepted 511 g/t AgEq over 9.4m (0.61 g/t Au, 399 g/t Ag, 1.4% Zn, and 1.0% Pb) including 1,928 g/t AgEq over 1.8m (1.54 g/t Au, 1,708g/t Ag, 2.5% Zn and 1.7% Pb).
    • BOU-DD26-792 intercepted 462 g/t AgEq over 8.1m (0.79 g/t Au, 237 g/t Ag, 3.0% Zn and 4.5% Pb) including 1,036 g/t AgEq over 2.2m (1.50 g/t Au, 563g/t Ag, 5.2% Zn and 10.4% Pb).
  • Exploration Update:
    • 69,209m drilled at Boumadine year-to-date.
    • 20% of the planned 360,000m infill drilling program for 2026-2027 completed

“These latest results continue to demonstrate the exceptional grade, width and scale potential emerging at Boumadine,” said Benoit La Salle, President & CEO.“Intercepts including 890 g/t AgEq over 51.5m in BOU-DD25-745 — our strongest drill intercept to date at Boumadine on a grade-thickness basis — located just 70m below the current pit shell, highlights the strong continuity of wide, high-grade mineralization along the 5.4-kilometre Boumadine Main Trend, which remains open in all directions. With over 69,000m drilled year-to-date and 11 rigs currently active, we are aggressively advancing the 2026–2027 infill and expansion program ahead of the updated PEA expected mid-year.”

 

Table 1 – Significant Intercepts from Boumadine Drill Exploration Program (Core Lengths)

 

DDH No. From To Au Ag Length* Cu Pb Zn Mo Ag Eq**
(m) (m) (g/t) (g/t) (m) (%) (%) (%) (g/t) (g/t)
BOU-DD25-745 214.5 266.0 2.05 535 51.5 0.0 5.9 3.8 30 890
Including 244.1 263.4 2.17 1,032 19.3 0.1 9.8 5.3 21 1,504
BOU-DD25-746 79.0 98.8 2.16 77 19.8 0.0 1.4 3.1 281 345
Including 83.3 85.2 10.92 60 1.9 0.0 1.2 3.4 373 1,024
BOU-DD25-746 107.0 121.5 5.24 204 14.5 0.0 2.2 3.9 32 741
Including 113.1 121.5 8.79 276 8.4 0.0 2.3 4.5 27 1,112
BOU-DD25-746 293.0 313.4 1.63 410 20.4 0.1 3.4 2.8 34 665
Including 298.0 303.0 1.65 848 5.0 0.1 5.7 3.1 61 1,156
Including 306.8 312.1 3.98 695 5.3 0.1 7.2 6.1 28 1,276
BOU-DD25-754 348.8 355.8 0.40 150 7.0 0.0 1.0 2.1 734 257
BOU-DD26-759 255 266.0 0.42 216 11 0.1 1.3 1.9 21 317
Including 255.0 258.1 1.16 552 3.1 0.0 1.8 2.9 43 739
BOU-DD26-759 336.4 342.6 0.58 302 6.2 0.0 1.6 3.8 239 461
Including 336.4 339.9 0.80 447 3.5 0.0 2.1 5.0 238 657
BOU-DD26-766 193.4 198.2 0.89 167 4.8 0.0 0.8 2 7 293
BOU-DD26-767 273.9 281 0.38 85 7.1 0 1.2 3.7 68 215
BOU-DD26-767 373.2 381.5 0.72 191 8.3 0 2 1.9 221 328
Including 374.2 376.9 0.88 467 2.7 0.0 5.1 2.7 618 700
BOU-DD26-773 253.0 255.6 1.18 516 2.6 0.0 2.3 2.8 48 712
BOU-DD26-775 323.5 335.5 0.44 172 12.0 0.0 1.0 2.0 341 272
Including 324.4 326.2 1.76 662 1.8 0.0 2.6 4.7 1,032 966
BOU-DD26-775 338.1 346.3 0.76 184 8.2 0.0 1.5 1.7 1,819 338
Including 338.9 341.4 1.44 428 2.5 0.0 3.8 3.9 2,736 737
BOU-DD26-775 400.0 409.5 0.76 216 9.5 0.0 2.7 4.6 507 429
Including 401.4 407.4 0.94 269 6.0 0.0 3.6 5.6 639 534
BOU-DD26-777 501.2 513.0 0.53 94 11.8 0.0 1.3 3.0 312 226
BOU-DD26-782 184.4 186.3 1.92 478 1.9 0.2 2.4 6.6 74 820
BOU-DD26-783 274.0 289.8 1.10 198 15.8 0.1 2.2 2.6 1,222 405
Including 283.8 287.8 1.75 419 4.0 0.2 4.7 4.5 3,202 805
BOU-DD26-786 403.2 412.6 0.61 399 9.4 0.0 1.0 1.4 922 511
Including 403.2 405.0 1.54 1,708 1.8 0.0 1.7 2.5 691 1,928
BOU-DD26-786 459.2 462.8 1.38 195 3.6 0.1 5.1 3.5 93 481
Including 459.2 461.0 2.38 355 1.8 0.1 9.9 5.0 127 845
BOU-DD26-790 140.5 155.4 0.62 586 14.9 0.0 3.7 1.9 12 746
Including 148.3 154.8 1.05 971 6.5 0.0 6.7 2.1 16 1,227
BOU-DD26-792 297.0 305.1 0.79 237 8.1 0.0 4.5 3.0 835 462
Including 300.9 303.1 1.50 563 2.2 0.0 10.4 5.2 2,891 1,036
BOU-DD26-796 368.4 373.1 0.63 231 4.7 0.0 3.0 2.3 57 387
BOU-DD26-796 378.0 384.1 0.20 117 6.1 0.1 2.6 2.4 0 236
BOU-DD26-799 271.5 276.4 1.05 210 4.9 0.3 2.6 4.5 60 452

True width remains undetermined at this stage; all values are uncut.

  1. Ag equivalent is based on a silver price of US$30/oz with a process recovery of 89%, a gold price of US$2,800/oz with a process recovery of 85%, a zinc price of US$1.20/lb with a process recovery of 72%, a lead price of US$1.00/lb with a process recovery of 85%, and a copper price of US$4.00/lb with a process recovery of 75% resulting in the following ratios: 1g/t Au: 79.3g/t Ag; 1% Cu: 68.3 g/t Ag; 1% Pb: 19.4 g/t Ag; and 1% Zn: 19.7 g/t Ag.

 


Figure 1: Boumadine Mining Licence Surface Plan with Magnetic Data (Residual Total Field) and 2026 Drill Holes

 

2026 Exploration Results

This year, 160 diamond drill holes, totaling 69,209m have been completed at Boumadine (Figure 1 and Appendix 2). Drilling was done on strike along the Main Trend, Tizi and Imariren. All results have been received for drill holes up to BOU-DD25-800 (Table 1, Figure 2, and Appendix 1).

Today’s results confirm the high-grade nature and continuity of the Boumadine Main Trend, which remains open in all directions. In addition, hole BOU-DD25-745 to the south intersected a new mineralized parallel structure 70m bellow the current resources pit shell (Figure 3). This new structure has the potential to increase both the resources and the depth of the open-pit and will require follow-up drilling upward and laterally to fully assess its potential.

Mineralization within the Boumadine Main Trend measures up to 4m wide (locally reaching over a 10m width) and is N340-oriented massive sulphide lenses/veins sharply dipping eastward (> 70°). The massive sulphide veins (>80%) are mainly composed of pyrite, with variable proportions of sphalerite, galena, and chalcopyrite. Tizi and Imariren share the same characteristics except for their N000 orientation.


Figure 2 – Surface Plan of Boumadine South Zone with New DDH Results

 


Figure 3 – Section 6575N with Drill Hole BOU-DD25-745 in the South Area of Boumadine with Resources Pit Shell

 

Next Steps

Infill drilling, following last year’s positive preliminary economic assessment2, will be ongoing for the next 24 months with a drill program of approximately 360,000m planned.

Significant potential exists to expand the Boumadine Main Trend (currently 5.4 km), the Tizi Zone (2.0 km) and the Imariren Zone (1.2 km), with all three trends open in all directions. Follow-up drilling is also planned on the 8 km Asirem trend for later this year.

Most drilling will continue to focus on the Main Trend, Imariren and Tizi to extend known mineralization along strike and at depth, while infilling key areas as part of advancing Feasibility Study. The balance of the 2026 program (~20,000m) will target Asirem follow-up and greenfield exploration, testing geological hypotheses and targets generated over the past four years. Ongoing geological work will guide additional development priorities.

Technical Information

Aya has implemented a quality control program to comply with best practices in sampling and analysis of drill core and RC chips. For core drilling, all individual samples represent approximately one metre in length of core, which is halved. Half of the core is kept on site for reference, and its counterpart is sent for preparation and assaying to African Laboratory for Mining and Environment in Marrakech, Morocco. For drilling using RC, all individual samples represent 1.0m in length and a representative portion is kept for every metre in some chip trays stored on site. A split samples representing 1/16th, ranging from 2 to 4 kilogram is sent for preparation and assaying to African Laboratory for Mining and Environment in Marrakech, Morocco.

All samples are analyzed for silver, copper, iron, lead, zinc, tin, and molybdenum using Aqua regia and finished by atomic absorption spectroscopy. Samples grading above 200 g/t Ag are reanalyzed using fire assaying. Gold is assayed by fire assaying. Standards of different grades and blanks were inserted every 20 samples in addition to the standards, blanks and pulp duplicate inserted by Afrilab.

Qualified Person

The scientific and technical information contained in this press release have been reviewed by David Lalonde, B. Sc, P. Geo, Vice-President, Exploration, Qualified Person, for accuracy and compliance with National Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver is a Canadian precious metals mining company anchored in Morocco and active across the full mining value chain. The Corporation has established an exploration track record through a systematic, technology-led, data-driven approach and is focused on expanding its resource base and land package along the Anti-Atlas fault — one of Africa’s most geologically rich, underexplored and mining-friendly regions.

Aya operates Zgounder, a rare, silver-only mine, producing silver doré from its new processing facility. Aya’s growth pipeline includes the Boumadine polymetallic project, where feasibility study work is underway. The project hosts a sizable mineralized footprint, and potential for further discovery.

Led by a proven team of mining professionals, Aya is guided by a vision of responsible mining and is committed to delivering sustainable value for shareholders, employees and host communities.

For additional information, please visit Aya’s website at www.ayagoldsilver.com.

Or contact

Benoit La Salle, FCPA, MBA
President & CEO
benoit.lasalle@ayagoldsilver.com
Alex Ball
VP, Corporate Development & IR
alex.ball@ayagoldsilver.com

 

Appendix 1 – Full Drill Results from Boumadine (core lengths)

 

DDH No. From To Au Ag Length* Cu Pb Zn Mo Ag Eq**
(m) (m) (g/t) (g/t) (m) (%) (%) (%) (g/t) (g/t)
BOU-DD25-623 273.0 274.0 0.11 66 1.0 0.0 0.2 1.2 13 105
BOU-DD25-627 708.7 711.0 3.22 8 2.3 0.1 0.1 0.1 8 272
BOU-DD25-627 725.2 726.0 1.26 25 0.8 0.1 0.2 0.2 6 139
BOU-DD25-628 0.0 201.0 NSR
BOU-DD25-631 0.0 477.0 NSR
BOU-DD25-634 0.0 552.0 NSR
BOU-DD25-638 0.0 234.0 NSR
BOU-DD25-639 0.0 291.0 NSR
BOU-DD25-640 43.2 43.8 0.25 44 0.6 0.5 0.6 0.0 17 110
BOU-DD25-641 0.0 276.0 NSR
BOU-DD25-643 0.0 231.0 NSR
BOU-DD25-662 0.0 237.0 NSR
BOU-DD25-663 0.0 234.0 NSR
BOU-DD25-669 0.0 207.0 NSR
BOU-DD25-678 0.0 1 011.0 NSR
BOU-DD25-693 537.1 539.0 0.67 21 1.9 0.0 0.8 2.8 11 148
BOU-DD25-697 528.0 531.5 1.41 18 3.5 0.0 0.0 0.0 3 134
BOU-DD25-697 528.0 529.4 2.23 25 1.4 0.0 0.0 0.0 3 206
BOU-DD25-697 535.5 536.5 0.68 6 1.0 0.0 0.1 0.6 3 74
BOU-DD25-698 364.7 365.2 0.78 7 0.5 0.1 1.4 1.6 3 133
BOU-DD25-704 0.0 609.0 NSR
BOU-DD25-705 367.9 373.0 3.08 62 5.1 0.1 0.1 0.0 2 313
Including 367.9 370.5 4.50 76 2.6 0.1 0.1 0.0 1 439
BOU-DD25-709 277.0 277.6 0.03 69 0.6 0.2 0.9 0.5 7 109
BOU-DD25-709 280.2 282.2 1.87 68 2.0 0.1 0.8 2.0 8 279
BOU-DD25-710 26.7 28.4 3.65 58 1.7 0.1 0.4 1.1 7 387
BOU-DD25-710 41.0 43.0 1.25 16 2.0 0.0 0.4 1.2 9 147
BOU-DD25-715 0.0 606.0 NSR
BOU-DD25-718 188.0 189.0 0.22 113 1.0 0.0 2.9 4.9 4 285
BOU-DD25-722 274.0 275.0 1.77 8 1.0 0.0 0.1 0.3 7 158
BOU-DD25-722 501.5 504.7 2.19 37 3.2 0.1 0.1 0.5 6 230
BOU-DD25-722 506.4 507.0 0.27 48 0.6 0.1 0.8 2.7 81 144
BOU-DD25-724 288.8 289.3 0.78 16 0.5 0.0 0.3 0.5 5 94
BOU-DD25-728 176.3 177.7 0.30 29 1.4 0.0 0.2 0.9 9 76
BOU-DD25-728 182.4 183.4 0.44 28 1.0 0.0 0.7 1.3 8 103
BOU-DD25-728 189.4 192.2 1.91 64 2.8 0.1 0.4 1.1 9 254
BOU-DD25-728 196.6 197.4 0.54 20 0.8 0.0 0.7 1.5 12 108
BOU-DD25-729 278.0 279.0 0.28 61 1.0 0.0 0.8 2.4 1 146
BOU-DD25-729 288.7 292.5 0.78 491 3.8 0.6 2.3 2.7 51 692
Including 289.5 291.6 1.29 803 2.1 1.0 3.7 4.4 64 1,134
BOU-DD25-731 221.1 222.0 0.03 849 0.9 0.0 0.2 0.2 7 859
BOU-DD25-732 417.0 418.8 0.03 86 1.8 0.3 0.1 0.2 9 115
BOU-DD25-740 389.0 390.0 0.52 10 1.0 0.0 0.0 0.1 8 54
BOU-DD25-745 214.5 266.0 2.05 535 51.5 0.0 5.9 3.8 30 890
Including 244.1 263.4 2.17 1,032 19.3 0.1 9.8 5.3 21 1,504
BOU-DD25-746 79.0 98.8 2.16 77 19.8 0.0 1.4 3.1 281 345
Including 83.3 85.2 10.92 60 1.9 0.0 1.2 3.4 373 1,024
BOU-DD25-746 100.6 102.4 0.32 70 1.8 0.0 1.1 3.0 44 177
BOU-DD25-746 107.0 121.5 5.24 204 14.5 0.0 2.2 3.9 32 741
Including 113.1 121.5 8.79 276 8.4 0.0 2.3 4.5 27 1,112
BOU-DD25-746 123.0 130.0 0.21 45 7.0 0.0 0.4 1.5 10 100
BOU-DD25-746 293.0 313.4 1.63 410 20.4 0.1 3.4 2.8 34 665
Including 298.0 303.0 1.65 848 5.0 0.1 5.7 3.1 61 1,156
Including 306.8 312.1 3.98 695 5.3 0.1 7.2 6.1 28 1,276
BOU-DD25-747 444.9 445.5 0.70 43 0.6 0.0 0.2 0.5 15 113
BOU-DD25-747 478.0 479.0 0.58 8 1.0 0.0 0.2 0.2 4 64
BOU-DD25-747 589.0 590.3 0.77 22 1.3 0.0 0.2 1.7 3 122
BOU-DD25-749 353.0 354.0 0.82 20 1.0 0.0 0.3 1.1 11 114
BOU-DD25-751 384.7 390.0 0.64 32 5.3 0.0 1.1 1.5 32 134
BOU-DD25-751 401.0 401.5 0.21 34 0.5 0.0 0.3 1.5 10 88
BOU-DD25-752 0.0 102.0 NSR
BOU-DD25-753 322.6 323.6 1.54 6 1.0 0.0 0.0 0.6 30 141
BOU-DD25-753 340.2 340.7 0.21 52 0.5 0.0 0.3 1.1 180 101
BOU-DD25-754 315.9 317.6 0.26 109 1.7 0.0 0.8 5.4 40 252
BOU-DD25-754 348.8 355.8 0.40 150 7.0 0.0 1.0 2.1 734 257
Including 348.8 350.1 1.40 422 1.3 0.1 2.1 3.8 2,095 688
BOU-DD25-754 371.0 372.0 0.13 41 1.0 0.0 0.6 1.4 253 95
BOU-DD25-755 325.0 326.0 0.29 91 1.0 0.1 0.5 1.0 376 159
BOU-DD25-755 410.6 415.2 0.64 15 4.6 0.0 0.1 0.1 23 70
BOU-DD25-755 420.2 421.8 0.64 143 1.6 0.0 2.2 1.7 74 272
BOU-DD25-755 434.6 435.6 0.69 21 1.0 0.0 0.0 0.0 19 77
BOU-DD25-756 0.0 240.0 NSR
BOU-MP25-030 0.0 120.0 NSR
BOU-MP25-083 151.0 152.0 0.92 18 1.0 0.0 0.1 0.0 11 93
BOU-MP25-083 503.2 503.7 0.43 31 0.5 0.0 0.3 0.6 8 85
BOU-MP25-091 0.0 102.0 NSR
BOU-RC25-038 0.0 200.0 NSR
BOU-RC25-039 82.0 83.0 0.53 29 1.0 0.0 0.4 0.8 22 94
BOU-RC25-039 88.0 89.0 0.03 69 1.0 0.0 2.3 2.5 8 165
BOU-RC25-057 0.0 180.0 NSR
BOU-RC25-060 1.0 191.0 NSR
BOU-RC25-061 0.0 166.0 NSR
BOU-RC25-062 0.0 188.0 NSR
BOU-RC25-063 0.0 168.0 NSR
BOU-RC25-066 0.0 200.0 NSR
BOU-DD26-757 0.0 204.0 NSR
BOU-DD26-758 166.9 171.8 0.47 65 4.9 0.0 0.6 1.1 10 136
BOU-DD26-759 255 266.0 0.42 216 11 0.1 1.3 1.9 21 317
Including 255.0 258.1 1.16 552 3.1 0.0 1.8 2.9 43 739
BOU-DD26-759 278.0 279.0 0.24 31 1.0 0.0 0.4 0.7 9 73
BOU-DD26-759 315.0 316.0 0.90 3 1.0 0.0 0.0 0.0 8 75
BOU-DD26-759 336.4 342.6 0.58 302 6.2 0.0 1.6 3.8 239 461
Including 336.4 339.9 0.80 447 3.5 0.0 2.1 5.0 238 657
BOU-DD26-759 379.5 380.0 0.36 75 0.5 0.0 0.5 1.7 292 151
BOU-DD26-760 340.3 341.3 0.03 55 1.0 0.0 0.0 0.0 6 58
BOU-DD26-760 482.0 483.6 0.31 55 1.6 0.1 0.1 0.2 3 92
BOU-DD26-761 282.0 283.4 1.73 226 1.4 0.0 0.8 1.9 40 417
BOU-DD26-761 290.3 291.7 0.07 217 1.4 0.3 2.0 3.6 94 350
BOU-DD26-761 303.0 303.9 0.06 56 0.9 0.3 1.1 0.9 46 120
BOU-DD26-761 350.0 351.0 0.34 34 1.0 0.0 0.5 1.6 16 103
BOU-DD26-761 358.0 358.8 0.83 438 0.8 0.1 5.0 3.1 15 671
BOU-DD26-761 362.0 365.0 0.29 165 3.0 0.1 1.8 5.3 54 332
BOU-DD26-761 394.0 394.6 0.23 87 0.6 0.0 1.9 3.5 327 218
BOU-DD26-762 0.0 201.0 NSR
BOU-DD26-763 0.0 219.0 NSR
BOU-DD26-764 213.7 220.8 1.49 30 7.1 0.1 0.2 0.2 8 165
BOU-DD26-765 223.0 224.0 0.33 11 1.0 0.0 0.2 0.6 7 54
BOU-DD26-766 111.1 112.4 1.09 124 1.3 0.0 0.6 0.5 4 233
BOU-DD26-766 193.4 198.2 0.89 167 4.8 0.0 0.8 2 7 293
BOU-DD26-766 204.1 207 0.4 89 2.9 0.0 0.4 0.5 12 135
BOU-DD26-766 210.0 211.0 0.23 36 1.0 0.0 0.3 0.0 12 64
BOU-DD26-767 273.9 281.0 0.38 85 7.1 0.0 1.2 3.7 68 215
Including 274.8 276.9 0.79 194 2.1 0.0 2.8 8.5 85 484
BOU-DD26-767 327.3 327.8 1.28 26 0.5 0.0 0.2 1.6 12 162
BOU-DD26-767 359.0 359.6 0.73 38 0.6 0.0 0.5 1.1 19 127
BOU-DD26-767 373.2 381.5 0.72 191 8.3 0.0 2.0 1.9 221 328
Including 374.2 376.9 0.88 467 2.7 0.0 5.1 2.7 618 700
BOU-DD26-767 398.6 401.0 0.66 228 2.4 0.0 1.5 1.8 508 355
BOU-DD26-768 0.0 204.0 NSR
BOU-DD26-769 102.0 105.0 0.21 73 3.0 0.0 2.2 6.1 5 252
BOU-DD26-770 51.6 52.5 0.73 31 0.9 0.1 0.2 1.3 7 122
BOU-DD26-770 225.8 228.1 1.73 43 2.3 0.1 0.1 0.4 16 200
BOU-DD26-770 327.0 328.0 0.03 71 1.0 0.0 0.0 0.0 8 75
BOU-DD26-771 16.8 17.6 0.82 28 0.8 0.1 0.1 0.1 14 100
BOU-DD26-771 19.2 20.0 0.19 53 0.8 0.1 0.0 0.0 7 78
BOU-DD26-771 95.6 96.1 0.19 32 0.5 0.4 1.8 3.1 13 169
BOU-DD26-771 105.0 106.0 0.68 13 1.0 0.0 0.2 0.3 10 79
BOU-DD26-771 116.7 117.3 0.11 71 0.6 0.0 0.3 0.5 9 97
BOU-DD26-771 401.0 402.0 0.03 243 1.0 0.0 0.0 0.0 2 246
BOU-DD26-772 0.0 108.0 NSR
BOU-DD26-773 241.6 245.2 0.82 60 3.6 0.0 0.6 0.8 182 155
BOU-DD26-773 248.0 249.0 0.15 34 1.0 0.0 0.3 0.2 57 57
BOU-DD26-773 253.0 255.6 1.18 516 2.6 0.0 2.3 2.8 48 712
BOU-DD26-774 0.0 150.0 NSR
BOU-DD26-775 319.0 320.8 0.23 48 1.8 0.0 0.5 1.0 121 98
BOU-DD26-775 323.5 335.5 0.44 172 12.0 0.0 1.0 2.0 341 272
Including 324.4 326.2 1.76 662 1.8 0.0 2.6 4.7 1,032 966
BOU-DD26-775 338.1 346.3 0.76 184 8.2 0.0 1.5 1.7 1,819 338
Including 338.9 341.4 1.44 428 2.5 0.0 3.8 3.9 2,736 737
BOU-DD26-775 352.0 353.0 0.76 22 1.0 0.0 0.2 0.3 160 96
BOU-DD26-775 366.3 366.8 0.38 40 0.5 0.0 0.0 0.4 15 80
BOU-DD26-775 383.0 384.8 0.29 77 1.8 0.0 0.5 0.6 68 124
BOU-DD26-775 400.0 409.5 0.76 216 9.5 0.0 2.7 4.6 507 429
Including 401.4 407.4 0.94 269 6.0 0.0 3.6 5.6 639 534
BOU-DD26-776 360.0 360.9 0.78 7 0.9 0.0 0.0 0.1 16 71
BOU-DD26-776 400.3 401.2 0.32 30 0.9 0.0 0.2 0.5 15 69
BOU-DD26-776 431.0 432.0 0.16 38 1.0 0.0 0.2 0.2 390 65
BOU-DD26-776 439.2 442.0 0.23 66 2.8 0.0 0.8 2.0 520 149
BOU-DD26-776 461.0 463.3 0.74 93 2.3 0.0 1.7 3.8 10 261
BOU-DD26-776 475.0 476.0 0.64 87 1.0 0.0 1.0 3.5 201 232
BOU-DD26-777 457.3 457.8 0.87 58 0.5 0.0 0.9 0.9 71 165
BOU-DD26-777 479.3 480.5 0.44 110 1.2 0.0 1.4 3.4 57 241
BOU-DD26-777 498.2 499.2 0.19 35 1.0 0.0 0.8 1.2 36 91
BOU-DD26-777 501.2 513.0 0.53 94 11.8 0.0 1.3 3.0 312 226
Including 510.9 513.0 1.22 145 2.1 0.0 1.5 3.6 525 353
BOU-DD26-778 0.0 210.0 NSR
BOU-DD26-779 0.0 201.0 NSR
BOU-DD26-780 0.0 204.0 NSR
BOU-DD26-781 70.7 71.4 0.07 77 0.7 0.5 0.1 0.2 16 123
BOU-DD26-781 157.7 158.5 0.03 452 0.8 0.1 0.9 0.2 4 480
BOU-DD26-781 165.5 166.0 1.22 19 0.5 0.0 0.5 0.2 4 132
BOU-DD26-781 180.6 182.1 0.12 64 1.5 0.1 0.6 1.0 5 109
BOU-DD26-781 255.9 256.4 0.92 7 0.5 0.0 0.1 0.1 11 84
BOU-DD26-781 348.7 350.3 0.03 55 1.6 0.0 0.0 0.0 3 58
BOU-DD26-781 352.2 353.1 0.03 50 0.9 0.0 0.1 0.5 3 64
BOU-DD26-782 179.9 180.8 0.68 34 0.9 0.3 0.6 0.9 24 134
BOU-DD26-782 184.4 186.3 1.92 478 1.9 0.2 2.4 6.6 74 820
BOU-DD26-782 189.6 190.4 0.85 146 0.8 0.0 1.1 2.5 40 286
BOU-DD26-782 194.0 199.5 0.24 71 5.5 0.0 0.9 2.5 43 159
Including 194.0 196.0 0.35 131 2.0 0.0 1.8 4.2 58 278
BOU-DD26-783 239.0 240.0 0.38 119 1.0 0.1 0.4 0.2 4,306 235
BOU-DD26-783 274.0 289.8 1.10 198 15.8 0.1 2.2 2.6 1,222 405
Including 283.8 287.8 1.75 419 4.0 0.2 4.7 4.5 3,202 805
BOU-DD26-783 300.9 301.4 1.49 119 0.5 0.0 0.8 2.2 23 299
BOU-DD26-783 303.7 304.2 0.35 44 0.5 0.0 0.1 0.8 92 91
BOU-DD26-783 330.2 330.7 0.49 56 0.5 0.0 0.2 2.0 37 138
BOU-DD26-784 44.0 44.8 0.61 32 0.8 0.2 1.7 4.3 6 211
BOU-DD26-784 51.0 52.0 1.24 7 1.0 0.0 0.5 1.2 2 140
BOU-DD26-784 55.6 57.0 4.98 21 1.4 0.2 0.8 1.1 2 466
BOU-DD26-784 60.0 61.0 1.51 15 1.0 0.0 0.2 0.5 4 150
BOU-DD26-784 114.6 115.5 0.17 65 0.9 0.8 0.0 0.2 2 139
BOU-DD26-784 117.3 118.0 0.67 27 0.7 0.1 0.0 0.2 4 93
BOU-DD26-784 201.0 201.5 0.21 39 0.5 0.1 2.5 3.8 15 185
BOU-DD26-785 89.4 90.0 0.48 50 0.6 0.1 0.6 2.3 13 149
BOU-DD26-785 96.8 97.7 0.56 8 0.9 0.0 0.3 0.4 4 67
BOU-DD26-785 110.5 111.0 0.59 42 0.5 0.1 0.8 1.1 2 131
BOU-DD26-785 136.0 137.0 0.03 56 1.0 0.1 0.1 0.1 4 71
BOU-DD26-785 316.0 318.8 0.95 46 2.8 0.0 0.2 0.4 3 136
BOU-DD26-786 327.8 328.8 0.56 7 1.0 0.0 0.0 0.0 1 53
BOU-DD26-786 337.0 337.5 0.79 29 0.5 0.0 0.1 0.0 116 96
BOU-DD26-786 359.4 360.6 0.85 65 1.2 0.0 0.1 2.1 106 180
BOU-DD26-786 376.0 378.0 0.16 58 2.0 0.0 0.1 0.0 3,220 129
BOU-DD26-786 403.2 412.6 0.61 399 9.4 0.0 1.0 1.4 922 511
Including 403.2 405.0 1.54 1,708 1.8 0.0 1.7 2.5 691 1,928
BOU-DD26-786 431.1 431.6 0.29 57 0.5 0.0 0.1 0.0 391 90
BOU-DD26-786 435.7 437.3 0.68 413 1.6 0.0 1.3 2.4 94 543
BOU-DD26-786 450.2 451.5 0.58 75 1.3 0.0 1.1 2.8 139 201
BOU-DD26-786 459.2 462.8 1.38 195 3.6 0.1 5.1 3.5 93 481
Including 459.2 461.0 2.38 355 1.8 0.1 9.9 5.0 127 845
BOU-DD26-786 470.6 471.4 0.98 22 0.8 0.0 0.1 0.1 8 102
BOU-DD26-787 0.0 306.0 NSR
BOU-DD26-788 251.5 252.0 0.55 11 0.5 0.0 0.1 1.5 2 88
BOU-DD26-789 0.0 252.0 NSR
BOU-DD26-790 99.3 100.2 1.09 527 0.9 0.0 7.9 3.4 21 834
BOU-DD26-790 119.6 120.2 0.32 123 0.6 0.0 0.2 2.0 1 192
BOU-DD26-790 140.5 155.4 0.62 586 14.9 0.0 3.7 1.9 12 746
Including 148.3 154.8 1.05 971 6.5 0.0 6.7 2.1 16 1,227
BOU-DD26-790 157.1 157.6 0.31 35 0.5 0.0 0.1 0.5 11 73
BOU-DD26-790 200.0 201.0 0.27 85 1.0 0.0 0.2 1.7 1 143
BOU-DD26-791 184.0 185.0 0.03 70 1.0 0.0 0.0 0.0 4 73
BOU-DD26-791 196.0 198.0 0.61 13 2.0 0.0 0.1 0.2 14 66
BOU-DD26-791 227.5 229.5 0.29 100 2.0 0.0 1.0 1.9 29 182
BOU-DD26-791 282.6 283.1 0.32 283 0.5 0.0 0.9 0.9 8 343
BOU-DD26-792 150.0 151.0 0.68 2 1.0 0.0 0.0 0.0 11 57
BOU-DD26-792 168.5 169.8 0.73 35 1.3 0.0 0.3 0.5 16 111
BOU-DD26-792 239.0 240.0 0.83 1 1.0 0.0 0.0 0.0 3 68
BOU-DD26-792 247.0 248.0 0.88 11 1.0 0.0 0.2 0.8 4 101
BOU-DD26-792 287.9 292.0 0.61 147 4.1 0.0 1.4 1.4 505 260
Including 287.9 289.0 1.47 368 1.1 0.0 3.3 3.9 1,594 654
BOU-DD26-792 297.0 305.1 0.79 237 8.1 0.0 4.5 3.0 835 462
Including 300.9 303.1 1.50 563 2.2 0.0 10.4 5.2 2,891 1,036
BOU-DD26-792 306.0 306.6 0.16 38 0.6 0.0 1.1 1.7 21 107
BOU-DD26-792 326.1 326.6 0.49 32 0.5 0.0 0.6 1.0 122 104
BOU-DD26-792 381.0 381.6 0.62 15 0.6 0.0 0.0 0.0 12 65
BOU-DD26-793 140.3 141.0 0.18 42 0.7 0.5 1.4 2.1 8 158
BOU-DD26-793 145.0 145.7 0.72 8 0.7 0.0 0.0 0.1 5 69
BOU-DD26-793 152.9 153.4 1.35 22 0.5 0.1 0.3 0.2 8 145
BOU-DD26-794 0.0 204.0 NSR
BOU-DD26-795 113.0 113.6 0.59 9 0.6 0.0 0.1 0.1 7 63
BOU-DD26-795 153.5 154.5 0.69 2 1.0 0.0 0.1 0.8 2 76
BOU-DD26-795 256.9 258.2 1.25 25 1.3 0.0 1.3 2.2 0 194
BOU-DD26-795 261.0 262.0 1.11 8 1.0 0.0 0.2 1.1 0 123
BOU-DD26-796 368.4 373.1 0.63 231 4.7 0.0 3.0 2.3 57 387
Including 371.6 372.2 2.14 1,108 0.6 0.1 15.1 5.6 67 1,687
BOU-DD26-796 378.0 384.1 0.20 117 6.1 0.1 2.6 2.4 0 236
Including 381.0 382.2 0.46 265 1.2 0.2 11.8 10.5 0 751
BOU-DD26-796 387.2 387.7 0.27 47 0.5 0.1 0.4 0.2 0 88
BOU-DD26-797 167.1 168.0 0.07 70 0.9 0.0 0.3 3.8 0 157
BOU-DD26-797 195.9 196.4 0.15 92 0.5 0.0 0.7 4.6 7 210
BOU-DD26-798 80.8 82.9 1.07 81 2.1 0.2 1.5 0.7 44 223
BOU-DD26-798 98.2 99.2 1.37 22 1.0 0.1 0.2 0.1 8 140
BOU-DD26-798 118.3 119.1 0.73 26 0.8 0.1 0.4 0.4 4 104
BOU-DD26-798 284.0 286.2 0.71 19 2.2 0.0 0.9 1.4 4 119
BOU-DD26-799 127.0 128.0 0.69 1 1.0 0.0 0.0 0.0 3 56
BOU-DD26-799 250.0 251.0 0.83 6 1.0 0.0 0.1 0.4 4 82
BOU-DD26-799 265.0 266.0 0.27 50 1.0 0.0 0.8 1.4 3 116
BOU-DD26-799 271.5 276.4 1.05 210 4.9 0.3 2.6 4.5 60 452
BOU-DD26-799 297.0 298.0 0.13 51 1.0 0.0 0.9 1.0 2 98
BOU-DD26-799 302.0 303.0 0.18 39 1.0 0.0 1.0 1.3 12 98
BOU-DD26-799 339.6 340.2 0.60 286 0.6 0.0 1.3 2.2 247 408
BOU-DD26-800 107.7 109.5 0.04 62 1.8 0.0 0.1 3.6 14 138

* True width remains undetermined at this stage; all values are uncut.

  1. Ag equivalent is based on a silver price of US$30/oz with a process recovery of 89%, a gold price of US$2,800/oz with a process recovery of 85%, a zinc price of US$1.20/lb with a process recovery of 72%, a lead price of US$1.00/lb with a process recovery of 85%, and a copper price of US$4.00/lb with a process recovery of 75% resulting in the following ratios: 1g/t Au: 79.3g/t Ag; 1% Cu: 68.3 g/t Ag; 1% Pb: 19.4 g/t Ag; and 1% Zn: 19.7 g/t Ag.

 


Appendix 2 – New Drillhole Coordinates of 2026 Boumadine Exploration Program (completed holes)

 

DDH No. Easting Northing Elevation Azimuth Dip Length (m)
BOU-DD26-829 317370 3474105 1275 73 -50 288
BOU-DD26-830 317533 3474988 1279 249 -50 621
BOU-DD26-831 316082 3478350 1256 269 -50 408
BOU-DD26-832 315379 3478258 1290 269 -50 210
BOU-DD26-833 317341 3474094 1271 69 -49 303
BOU-DD26-834 317409 3473961 1269 70 -58 514
BOU-DD26-835 315699 3478156 1252 270 -50 453
BOU-DD26-836 315421 3478261 1283 270 -50 285
BOU-DD26-837 315983 3478349 1260 270 -50 342
BOU-DD26-838 317305 3474079 1265 69 -51 387
BOU-DD26-839 317268 3474065 1262 72 -50 435
BOU-DD26-840 315464 3478267 1266 270 -50 342
BOU-DD26-841 315497 3478265 1262 270 -50 351
BOU-DD26-842 317324 3474193 1276 69 -51 207
BOU-DD26-843 317290 3474181 1270 68 -49 270
BOU-DD26-844 317344 3474972 1281 249 -50 207
BOU-DD26-845 315760 3478157 1263 268 -49 501
BOU-DD26-846 315537 3478265 1262 269 -50 477
BOU-DD26-847 317253 3474168 1263 70 -50 300
BOU-DD26-848 317217 3474159 1256 70 -50 411
BOU-DD26-849 317176 3474149 1255 70 -50 459
BOU-DD26-850 315805 3478151 1276 269 -50 615
BOU-DD26-851 317401 3474998 1265 249 -51 246
BOU-DD26-852 317127 3474124 1266 69 -49 552
BOU-DD26-853 315575 3478263 1255 269 -50 354
BOU-DD26-854 317087 3474109 1270 68 -50 651
BOU-DD26-855 317471 3475030 1256 246 -52 402
BOU-DD26-856 315613 3478273 1250 269 -50 351
BOU-DD26-857 317045 3474093 1276 73 -50 756
BOU-DD26-858 315656 3478263 1249 270 -50 402
BOU-DD26-859 315289 3478064 1280 269 -50 138
BOU-DD26-860 317271 3474287 1272 70 -50 255
BOU-DD26-861 317229 3474270 1270 71 -49 312
BOU-DD26-862 315700 3478264 1251 271 -49 450
BOU-DD26-863 315751 3478266 1256 269 -50 504
BOU-DD26-864 317188 3474256 1270 69 -50 354
BOU-DD26-865 315342 3478063 1285 269 -51 198
BOU-DD26-866 317154 3474239 1266 70 -50 528
BOU-DD26-867 317118 3474233 1261 68 -50 582
BOU-DD26-868 315797 3478263 1267 270 -50 576
BOU-DD26-869 317078 3474216 1257 68 -50 600
BOU-DD26-870 317038 3474201 1257 70 -51 708
BOU-DD26-871 315378 3478063 1278 270 -50 270
BOU-DD26-873 315412 3478063 1266 270 -50 255
BOU-DD26-874 315450 3478065 1257 270 -50 297
BOU-DD26-875 317216 3474372 1280 70 -50 411
BOU-DD26-877 315538 3478063 1258 270 -50 402
BOU-DD26-878 317175 3474357 1279 69 -50 582
BOU-DD26-880 315589 3478059 1265 270 -50 357
BOU-DD26-881 317137 3474344 1273 66 -50 615
BOU-DD26-882 315683 3478062 1279 268 -50 501
BOU-DD26-883 317257 3474110 1255 71 -50 360
BOU-DD26-885 317285 3474502 1296 71 -50 156
BOU-DD26-886 315285 3477963 1283 270 -50 123
BOU-DD26-887 315766 3478068 1274 270 -50 555
BOU-DD26-888 317101 3474179 1259 70 -50 630
BOU-DD26-889 317249 3474487 1288 71 -50 255
BOU-DD26-890 317214 3474474 1280 68 -50 429
BOU-DD26-891 315400 3477963 1270 270 -50 216
BOU-DD26-892 315437 3477960 1262 270 -50 261
BOU-DD26-893 315327 3477963 1285 270 -50 156
BOU-DD26-896 315531 3477959 1269 269 -51 402
BOU-DD26-897 317143 3474450 1277 73 -50 612
BOU-DD26-898 317100 3474437 1273 68 -50 663
BOU-DD26-899 315364 3477963 1279 270 -50 192
BOU-DD26-900 317219 3474214 1264 70 -50 342
BOU-DD26-901 317137 3474192 1257 69 -50 516
BOU-DD26-902 315278 3477858 1279 270 -50 108
BOU-DD26-903 315581 3477963 1279 270 -50 513
BOU-DD26-904 315628 3477962 1283 269 -48 474
BOU-DD26-906 315321 3477858 1279 270 -50 156
BOU-DD26-910 317292 3474453 1295 71 -50 504
BOU-DD26-913 315400 3477858 1272 270 -50 252
BOU-DD26-914 315480 3477860 1272 269 -50 375
BOU-DD26-915 315524 3477860 1272 270 -50 426
BOU-DD26-916 317076 3474372 1267 70 -51 657
BOU-DD26-917 315441 3477853 1269 270 -50 300
BOU-DD26-918 317263 3474548 1293 70 -50 201
BOU-DD26-920 317195 3474521 1276 70 -51 356.2
BOU-DD26-924 317172 3474564 1275 70 -51 255
BOU-DD26-926 317215 3474580 1282 70 -51 168

2. The complete NI 43-101 Technical Report entitled “Technical Report and Updated Mineral Resource Estimate of the Boumadine Polymetallic Project, Kingdom of Morocco” dated December 18, 2025, (2025 PEA) is available on Aya’s website and on SEDAR+ (www.sedarplus.ca). The PEA is preliminary in nature, and it includes inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and, as such, there is no certainty that the PEA results will be realized.

Posted May 20, 2026

Share this news article

MORE or "UNCATEGORIZED"


Leviathan Metals Announces Closing of $10 Million LIFE Offering

Leviathan Metals Corp. (TSX-V: LVX) (OTCQB: LVXFF) (FSE: 0GP) is pleased to announce that it has clo... READ MORE

May 20, 2026

Orezone Reports First Set Of Drill Results From Casa Berardi Mine Including16.10g/T Au Over 6.7m And 6.47g/T Au Over 21.5m

Orezone Gold Corporation (TSX: ORE) (ASX: ORE) (OTCQX: ORZCF) is pleased to announce the first set o... READ MORE

May 20, 2026

Valhalla Metals Announces Closing of First Tranche of Over-Subscribed Private Placement

Valhalla Metals Inc. (TSX-V: VMXX) (OTCQB: VMXXF) is pleased to announce that the Company has comple... READ MORE

May 20, 2026

Azimut Continues to Expand the Fortin Antimony-Gold Zone, Wabamisk Property, James Bay Region, Québec

Azimut Exploration Inc. (TSX-V: AZM) (OTCQX: AZMTF) is pleased to report the complete results of it... READ MORE

May 20, 2026

DPM Metals Reports New High-Grade Intercepts from the Chelopech Wedge Zone Deep Prospect; Expects Mineral Resource Estimate by Year-End 2026

DPM Metals Inc. (TSX: DPM) (ASX: DPM) is pleased to report results from delineation drilling at the ... READ MORE

May 20, 2026

Copyright 2026 The Prospector News