The Prospector News

Auro Intersects 905m Grading 0.60 g/t Gold and 0.12% Copper and Commences 20,000 Metre – Phase II Drill Program at the Santa Barbara Gold-Copper Project, Ecuador

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Auro Intersects 905m Grading 0.60 g/t Gold and 0.12% Copper and Commences 20,000 Metre – Phase II Drill Program at the Santa Barbara Gold-Copper Project, Ecuador

 

 

 

 

 

Auro Metals Inc. (TSX-V: AURO) (OTCQB: AURFF)  is pleased to announce the fifth batch of assay results, of three drillholes, from the 2026 Phase I Drill Program at its 100%-owned Santa Barbara Gold-Copper Project located in the Zamora-Chinchipe Province in southeastern Ecuador. Since the commencement of the program, 22 drillholes have been completed and assay results of 17 holes (including the fourteen holes released on June 22, July 13, July 28 and August 18, 2026) have been received. Additionally, the Company is pleased to announce that it has completed the Phase I Drill Program consisting of 11,047.35 metres and has continued without interruption into its Phase II – 20,000m Drill Program at the Project.

 

SUMMARY OF DRILL RESULTS

 

These three holes were drilled at the southern part of the known mineralized porphyry system (“Santa Barbara South”), which is currently believed to be the core area of the known porphyry mineralization system. Like the previously reported holes from the 2026 Phase I Drill Program, these holes were designed to test the continuity of mineralization between historical drill intercepts and the extension of mineralization up-dip, down-dip, and at depth. Highlights are as follows:

  • Drillhole DSB-68 intersected 905.22m grading 0.60 grams per tonne gold and 0.12% copper from 56.5m to 961.72m. Further down the drillhole, weaker mineralization continues until the end of hole at a depth of 1,282m
  • Drillhole DSB-70 intersected 262.5m grading 0.71 g/t Au and 0.10% Cu from 10m to 272.5m, including 100.45m grading 1.01 g/t Au and 0.11% Cu from 169.35m to 269.8m.
  • Drillhole DSB-69 intersected 103.05m grading 0.53 g/t Au and 0.09% Cu from 70.45m to 173.5m, and 200.55m grading 0.59 g/t Au and 0.08% Cu from 247.45m to 448.0m, including 57.83m grading 1.06 g/t Au and 0.10% Cu from 266.67m to 324.5m.

 

“This latest batch of drillholes continues to demonstrate the scale and consistency at Santa Barbara. These results, along with the previously reported intercepts, continue to demonstrate that mineralization is open up-dip, down-dip, and at depth,” said Victor Feng, CEO of Auro. “DSB-68 is the longest and deepest hole drilled at Santa Barbara. On a gram by metre basis, it returned the best reportable intercept at the Project to date, including all historical drilling. The hole remained mineralized to the end at a depth of 1,282m, showing mineralization is open at depth. DSB-69 showed mineralization is open down-dip and DSB-70 intersected higher-grade gold at depth.”

 

“The Phase I Drill Program was successful in confirming historical drill results, increasing drill density in inferred resource areas, and in several cases, showed mineralization remains open in all directions and at depth. Completion of Phase I also gives us fresh core to begin our own initial metallurgical test work. With 17 holes published to date, assay results for the remaining 5 Phase I drillholes will be published as they become available.”

 

“Our Phase II – 20,000m Drill Program is already underway. We will increase the overall drilling speed with the addition of three rigs, each capable of drilling to a depth of more than 1,000m. This allows us to test extensions of the mineralized zones at depth, as multiple long holes from Phase I ended in mineralization. Phase II will focus on testing gaps between known parts of the deposit, stepping out to test new targets, and drilling deeper than has ever been drilled at the Project.”

 

These drill results are summarized in Table 1 below. Drillhole specifications for all completed Phase I drillholes are provided in Table 2, and a drill plan view is shown in Figure 1.

 

Table 1 Summary of Drill Intercepts

 

Hole_ID Depth_from Depth_to Interval_m Au_g/t Cu_% AuEq_g/t
DSB-68 56.50 961.72 905.22 0.60 0.12 0.63
DSB-69 70.45 173.50 103.05 0.53 0.09 0.56
247.45 448.00 200.55 0.59 0.08 0.61
incl. 266.67 324.50 57.83 1.06 0.10 1.08
DSB-70 10.00 272.50 262.50 0.71 0.10 0.73
incl. 169.35 269.80 100.45 1.01 0.11 1.04

 

Notes:

  1. Drill location, altitude, azimuth, and dip of drillholes are provided in Table 2.
  2. Drill intercept is core length, and grade is length weighted. True width of mineralization is unknown.
  3. A cut-off of 0.2 g/t Au is applied for calculation of drill intercept.
  4. Calculation of gold equivalent (“AuEq”) is defined as AuEq (g/t) = Au (g/t) + Cu (%) x 0.259, based on a gold price of US$3,200/oz, and copper price of US$12,000/t metal, assuming average processing recoveries of 85.5% Au and 19.6% Cu. It is the Company’s view that all elements in the metal equivalent calculations have a reasonable potential to be recovered and sold.

 

 Figure 1: Plan view of drillholes

 

SUMMARY OF PHASE I DRILL PROGRAM

 

Phase I consisted of 11,047.35m across 22 drillholes. Results for 17 holes have been published to date, with the remaining 5 pending to be released once assays become available.

 

Phase I was designed to: (i) confirm historical drill results; (ii) complete infill drilling to upgrade the existing mineral resource ahead of a future resource update; and (iii) obtain fresh drill core to advance the Company’s understanding of mineralization controls and metallurgy at Santa Barbara. The program successfully increased drill density across large parts of the inferred resource, intersecting numerous long intercepts of gold-copper mineralization. Results improved overall resource confidence, extended mineralization at depth in several areas, and demonstrated up-dip and down-dip openness in certain areas of the known deposit. In several long infill holes published to date, gold grades were significantly higher than the gold grades of the current inferred resource.

 

PHASE II – 20,000M DRILL PROGRAM

 

The ongoing Phase II – 20,000m drill program is designed to: (i) test gaps between known parts of the deposit; (ii) step out to test new targets identified through historical surface rock chip sampling and chargeability anomalies found in a historical IP survey; (iii) test the depth extension of the known mineralized zones; and (iv) complete further infill drilling ahead of a future resource update.

 

The three additional drill rigs which will be mobilized to site are KD1700 rigs capable of drilling to a depth of more than 1,000m and will be used to test resource extension at depth.

 

A subsequent Phase III drill program, expected to dovetail with the conclusion of Phase II, will continue to focus on step-out drilling and resource expansion, including testing targets at depth.

 

INITIAL METALLURGICAL TEST WORK PROGRAM

 

The Company is preparing samples for a comprehensive metallurgical test program, including gravity concentration, comminution, flotation, and cyanide leaching. For each test, three sample types will be evaluated: oxide material, sulfide material from the upper portion of the deposit (<400m), and sulfide material from the lower portion of the deposit (>400m). The objective of the test program is to optimize the processing flowsheet and maximize gold and copper recoveries.

 

DESCRIPTION OF HOLES

 

Hole DSB-68 is drilled sub vertically in the southern portion of Santa Barbara South to test the depth extent of the porphyry mineralization system. The hole was completed at a depth of 1282m, the longest and deepest hole drilled at Santa Barbara so far and intersected 905.22m (from 56.5m to 961.72m) grading 0.60 g/t Au and 0.12% Cu (Figure 2). Further down the hole, weaker mineralization continues until the end of hole. The hole was terminated due to the difficulty of drilling resulting from limitations of the drill rig. The results of this hole indicate that the mineralization system at Santa Barbara reached a depth of more than one thousand metres from surface, suggesting the significant size potential of the Project.

 

Lithology in hole DSB-68 is mainly dark aphanitic basaltic andesite cut by some porphyritic diorite dykes. Mineralization is characterized by dissemination and narrow veinlets of pyrite-chalcopyrite, closely associated with potassic alteration (secondary biotite) and quartz veining (Figure 3 and Figure 4). Secondary biotite occurs as dark brownish to reddish patches in basaltic andesite and as halos along some vein structures (Figure 5).

 

Figure 2: Section A-A’

 

Figure 3: Core photo of DSB-68, Box 89, from 253.37m to 256.36m, mineralized basaltic andesite cut by quartz veining.

 

Figure 4: Core photo of DSB-68, Box 183, from 519.18m to 522.07m, mineralized basaltic andesite cut by quartz veining and quartz-carbonate veining.

 

Figure 5: Core photo of DSB-68, depth 521.79m, mineralized basaltic andesite cut by quartz and quartz-calcite veining, with patchy dark brownish secondary biotite (potassic alteration) and dissemination of pyrite and chalcopyrite.

 

Hole DSB-69 was drilled around 120m to the east of hole DSB-66 in the direction of 260 degrees from north and at a dip angle of -63 degrees to a depth of 490.05m to test the down-dip extension of the mineralization intercepted in hole DSB-66 of which drill results were released on August 18, 2026. This hole intersected 103.05m (from 70.45m to 173.5m) grading 0.53 g/t Au and 0.09% Cu, and 200.55m (from 247.45m to 448m) grading 0.59 g/t Au and 0.08% Cu, including 57.83m (from 266.67m to 324.5m) grading 1.06 g/t Au and 0.10% Cu. The results indicate that mineralization is open in the down-dip direction to the east (Figure 6).

 

Lithology in the hole is dominated by diorite porphyry in the upper portion to a depth of 243m, whereas the lower portion is mainly basaltic andesite locally intruded by diorite porphyry. Mineralization in forms of both dissemination and narrow veinlets of pyrite and chalcopyrite are closely associated with the intensity of secondary biotite alteration and quartz veining in both rock types of basaltic andesite and diorite porphyry (Figure 7 and Figure 8).

 

Figure 6: Section B-B’

 

Figure 7: Core photo of DSB-69, Box 108, from 293.97m to 296.52m, mineralized basaltic andesite cut by quartz veining.

 

Figure 8: Core photo of DSB-69, Box 113, from 307.55m to 310.47m, mineralized diorite porphyry cut by quartz veining.

 

Hole DSB-70 was drilled to a depth of 306.6m, in the northern part of Santa Barbara South, in a westerly dipping direction to infill between the historical hole DSB-10 and the 2026 hole DSB-64. It intercepted 262.5m (from 10m to 272.5m) grading 0.71 g/t Au and 0.10% Cu, including 100.45m (from 169.35m to 269.8m) grading 1.01 g/t Au and 0.11% Cu in the lower portion of the hole. Results from this hole indicate mineralization starts from near surface and there is higher grade mineralization hosted in a deeper structure zone of basaltic andesite, diorite porphyry and volcano-sediments (Figure 9).

 

The upper portion of the hole is dominated by diorite porphyry which is pervasively altered (secondary biotite and sericite) and cut by quartz and quartz-calcite veining with mineralization of dissemination and narrow veinlets of pyrite and chalcopyrite. From a depth of around 100m to 270m there is a structural mixture zone of basaltic andesite, diorite porphyry and volcano-sediments, likely resulting from a combination of hydrothermal hydraulic fracturing and tectonic movement. Mineralization is strong and characterized by rich sulfides of pyrite and chalcopyrite associated with lots of quartz and quartz-calcite veining (Figure 10). From 270m to 306.6m at the end of the hole, lithology changes to mainly volcano-sediments with little mineralization and quartz veining.

 

Figure 9: Section C-C’

 

Figure 10: Core photo of DSB-70, Box 67, from 181.57m to 184.35m, mineralized volcano-sediments cut by quartz veining.

 

Table 2 Summary of Phase I Drillholes of Santa Barbara Gold-Copper Project

 

 Hole_ID Easting Northing Altitude Depth_m Azimuth (°) Dip (°)  Assay Results
DSB-54 765463.70 9544445.53 931.38 705.70 260 -82 complete
DSB-55 765539.93 9544383.21 940.76 285.50 240 -45 complete
DSB-56 765417.68 9544434.13 960.10 274.85 260 -47 complete
DSB-57 765541.01 9544245.95 973.91 315.70 240 -60 complete
DSB-58 765488.12 9544749.44 920.64 274.80 260 -63 complete
DSB-59 765466.41 9544269.27 1030.67 706.55 60 -80 complete
DSB-60 765434.27 9544155.26 1060.67 802.65 60 -60 complete
DSB-61 765557.28 9544184.88 990.14 720.60 236 -77.5 complete
DSB-62 765394.10 9544671.12 892.48 200.00 260 -55 complete
DSB-63 765384.50 9544605.71 891.07 253.90 260 -60 complete
DSB-64 765356.92 9544537.66 924.00 199.35 260 -60 complete
DSB-65 765463.12 9544268.74 1030.43 379.80 240 -70 complete
DSB-66 765427.24 9544493.67 909.15 312.15 260 -60 complete
DSB-67 765258.71 9544399.36 1040.33 599.00 80 -52 complete
DSB-68 765596.09 9544275.58 983.66 1,282.00 240 -85 complete
DSB-69 765556.17 9544523.38 922.05 490.05 260 -63 complete
DSB-70 765404.89 9544551.38 900.01 306.60 260 -60 complete
DSB-71* 765256.00 9544398.00 1039.00 745.00 80 -63 pending
DSB-72 765494.39 9544498.07 905.17 400.90 260 -60 pending
DSB-73 765508.60 9544621.44 927.45 485.65 260 -60 pending
DSB-74 765592.12 9544640.03 961.68 856.95 260 -64 pending
DSB-75 765550.96 9544694.00 938.32 449.65 260 -65 pending
Total 11,047.35

 

Notes:

  1. Drill collar coordinate system is PSAD56 UTM Zone 17S.
  2. Coordinate of drill collar is picked with Real Time Kinematics (RTK) GPS.
  3. * Coordinate of drill collar is picked with handheld GPS.

 

QUALITY ASSURANCE AND QUALITY CONTROL

 

All samples in respect of the exploration program at the Project discussed in this news release were shipped in securely-sealed bags by a chartered commercial truck, directly from the field to the sample preparation facilities of SGS in Guayaquil, Ecuador for preparation, and to SGS in Lima, Peru for geochemical analysis. SGS is a global leader in inspection, verification, testing, and certification. It is an ISO/IEC 17025 accredited laboratory independent from Auro. All samples go through fire assay (SGS code FAA313) for gold and multi-acid digestion ICP-AES multi-element assay (SGS code ICP40B) for other elements. Certified reference materials, various types of blank samples and duplicate samples are inserted into normal drill core sample sequences prior to delivery to laboratory for preparation and analysis. The overall ratio of quality control samples in sample sequences is around twenty percent.

 

QUALIFIED PERSON

 

The scientific and technical information contained in this news release has been reviewed and approved by Alex Zhang, P. Geo., a Director of the Company, who is a Qualified Person for the purposes of National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The Qualified Person has verified the information disclosed herein, including the sampling, preparation, security and analytical procedures underlying such information, and is not aware of any significant risks and uncertainties that could be expected to affect reliability or confidence in the information discussed herein.

 

ABOUT AURO METALS INC.

 

Auro Metals Inc. is a mineral exploration company which holds a 100% interest in the Santa Barbara Gold-Copper Project in the Zamora Copper-Gold Belt of southeastern Ecuador. The Santa Barbara Project is a large-scale porphyry system comprising Indicated resources of 29.8 million tonnes grading 0.73 grams per tonne gold and 0.1% copper containing 697,000 ounces gold and 68 million pounds copper, and Inferred resources of 205.7 million tonnes grading 0.52 grams per tonne gold and 0.09% copper containing 3,418,000 ounces gold and 426 million pounds copper. For more detail, see the Company’s mineral resource estimate prepared in accordance with NI 43-101 by SRK Consulting, effective March 23, 2026 which can be found on SEDAR+ and the Company’s website.

 

Posted September 16, 2026

Share this news article

MORE or "UNCATEGORIZED"


Aya Gold & Silver Reports High-Grade Silver Exploration Results Near Pit and at Depth at Zgounder

Aya Gold & Silver Inc. (TSX: AYA; NASDAQ: AYA) is pleased to... READ MORE

September 16, 2026

New Break Resources Ltd. (CSE: NBRK) (OTCQB: NBRKF) (FSE: O91) has received results from the last four holes of a ten-hole, 1,996 metre summer drilling program in the Zavitz gold zone at the Company's 100% owned Moray gold project. In total, New Break has completed 5,372 metres of drilling in 32 drillholes in 2026. Moray is located 49 km southeast of Timmins, Ontario and 32 km northwest of the Young-Davidson gold mine operated by Alamos Gold Inc. Select results from the final four of ten holes drilled in the summer drilling program are presented below in Table 1, while drillhole collar locations are detailed in Table 2 in Appendix A. Table 1 – Moray Summer 2026 Final Drill Results Hole ID Length (m) From (m) To (m) Width (1) (m) Au Grade (2) (g/t) NBR-26-29 322.0 77.3 78.8 1.5 0.42 and 138.0 139.1 1.1 0.38 and 162.5 173.3 10.8 (3) 1.61 and 227.4 229.0 1.6 1.21 and 231.5 232.1 0.6 1.72 NBR-26-30 250.0 37.0 38.0 1.0 0.30 and 102.8 103.5 0.7 0.60 and 121.5 122.5 1.0 0.36 and 124.5 125.5 1.0 0.33 and 128.5 129.0 0.5 0.90 and 131.0 132.0 1.0 0.36 and 169.8 174.0 4.2 2.65 and 178.0 179.5 1.5 0.77 and 183.5 186.6 3.1 1.22 and 190.0 190.5 0.5 1.06 and 191.5 192.5 1.0 1.48 and 196.0 200.5 4.5 2.53 and 203.5 204.0 0.5 2.15 and 206.5 212.0 5.5 1.57 NBR-26-31 274.0 169.0 170.5 1.5 0.37 and 184.5 186.0 1.5 0.51 and 197.0 200.0 3.0 0.94 and 201.5 202.0 0.5 0.50 and 203.5 210.0 6.5 (3) 3.12 NBR-26-32 352.0 73.5 74.0 0.5 0.44 and 174.0 174.6 0.6 0.52 and 194.0 195.0 1.0 0.66 and 199.8 203.3 3.5 2.29 and 227.3 228.0 0.7 0.97 (1) Intervals are drill intersections and do not necessarily represent true widths. (2) All intervals are presented using a cut-off grade of 0.3 g/t Au and internal dilution of no more than 1.0 metres at grades less than 0.3 g/t Au and assays are not capped (see QA/QC Procedures). (3) Drill core photos shown in Appendix B. Figure 1 – Newly Reported Drillholes NBR-26-29, 30 Figure 2 – Newly Reported Drillholes NBR-26-30, 31, 32 Note: The bottom of NBR-26-30 deviated southeast and is represented in both sections. Figure 1: Section B-B1 incorporates drillholes NBR-26-06, 07, 08, 25, 26, 27, 28, 29 and part of 30. Gold mineralization extends southeast into the syenite as exhibited in NBR-26-29. NBR-26-30 is identified in both sections A-A1 and B-B1 as the drillhole was collared along section A-A1 but deviated southeast, intersecting gold mineralization in the mafic volcanics in section B-B1. Figure 2: A-A1 incorporates drillholes NBR-26-03, 04, 05, 23, 24, 30, 31 and 32. NBR-26-31 exhibits gold mineralization both within the syenite (at the contact) and within a "flow breccia" within the hematite altered mafic volcanic at the contact. NBR-26-32 is typified by blocky faulted ground with lamprophyre dykes and gold mineralization in the hematite altered mafic volcanics in a brecciated quartz vein with angular syenitic fragments. William Love, Chief Executive Officer of New Break commented, "Ongoing drilling this summer in the Zavitz gold zone continues to deliver significant gold values, with gold mineralization intercepted in every drillhole. As depicted in Figures 1 and 2, gold mineralization has been encountered predominantly within the mafic volcanics. Importantly, drillholes NR-26-29 and NR-26-32, the deepest drilled to date, demonstrate that gold mineralization extends into the syenite to the southeast at the contact with the mafic volcanics." He further noted, "The intrusive-mafic volcanic contact in the Zavitz gold zone has a distinctive magnetic high. This could be reflective of the higher proportion of iron in these mafic volcanics, which is associated with the higher gold values. This same magnetic and IP signature has been identified elsewhere in areas also believed to be along the intrusive-mafic volcanic contact. Drilling these never before tested targets with the goal of identifying gold mineralization similar to that encountered in the Zavitz zone represents the potential for significantly expanding the Moray gold discovery. There is also the belief that the Zavitz zone could represent the first of a series of stacked mineralized gold zones, which would point to the potential for a much larger gold system at depth. We plan to test this through deeper drilling directly into the Zavitz zone." About the Moray Gold Project The Moray property is located in the heart of the Ontario Abitibi greenstone belt, 49 km southeast of Timmins surrounded by a number of significant gold producing companies and existing mills (see Figure 3). The Young-Davidson gold mine operated by Alamos Gold Inc., with its 8,000 tonne per day mill is the closest and within a short trucking distance of approximately 45 km by road from Moray. The understanding of gold mineralization at Moray continues to evolve with each round of drilling. The occurrence of gold mineralization extending into the syenite to the southeast of the Zavitz zone and in the deepest drillholes is noteworthy given the presence of syenite-hosted mineralization at Young-Davidison. More recent examination of the drill core also suggests that the gold mineralization discovered to date may resemble an intrusion related style of deposit like Agnico Eagle's Upper Beaver gold deposit east of Kirkland Lake, as opposed to a structurally hosted gold system. Both Young-Davidson and Upper Beaver host multi-million ounce gold deposits. Figure 3 – Moray Location Map: Surrounding Gold Producers and Upper Beaver Gold Project Technical Content and Qualified Person The scientific and technical information contained in this news release has been reviewed and approved by Peter C. Hubacheck, P. Geo, consulting geologist to New Break, and an independent Qualified Person as defined by National Instrument 43-101. Mr. Hubacheck certifies that this news release fairly and accurately reflects the technical information and data presented. New Break conducts its exploration activities in accordance with CIM Best Practices Guidelines. QA/QC Procedures QA/QC procedures were executed to ensure all work is conducted in accordance with best practices. All drill core was sawn in half with one half of the core prepared for shipment and the other half retained for future verification. All core is under watch from the drill site to the core processing facility. Drill core is BQTK size and sample intervals range from 0.5 metres to 1.0 metres in length. Commercially prepared certified reference material ("CRM") standards and blanks were inserted with each shipment at a rate of 1 QAQC sample in every 12 core samples. Samples from New Break's 2026 Moray drilling program were analyzed at Activation Laboratories in Timmins, Ontario, which is ISO 17025 certified, by 30-gram fire assay with atomic absorption finish. Any sample assaying greater than 10.0 g/t Au was re-assayed with fire assay gravimetric analysis. Grade composite intervals over core lengths are calculated using a weighted average grade with a cut-off grade of 0.3 g/t Au. Up to 1.0 m of internal dilution (consecutive interval below cut-off grade) are included within specific geologic domains and alteration assemblages, except as otherwise noted. The composites are constrained geologically by metasomatic alteration processes sourcing from the Fiset syenite intrusion and contact mafic volcanic rocks. Elevated gold values are coincident with hematite, silica, sericite and pyrite mineralization within structurally prepared brecciated corridors flanking the intrusion. Intervals are not true widths and no top cutting has been applied to the higher gold values. About New Break Resources Ltd. New Break is a Canadian mineral exploration company focused on its Moray gold project located 49 km southeast of Timmins, Ontario, in a well-established mining camp within proximity to existing infrastructure, and 32 km northwest of the Young-Davidson gold mine, operated by Alamos Gold Inc. Shareholders are also leveraged to exploration success in Nunavut, Canada, through New Break's 20% carried interest in the Sundog gold project and ownership of 6.0 million shares of Guardian Exploration Inc. (TSXV: GX). The Company is supported by a highly experienced team of mining professionals. Appendix A – Drillhole Data and Locations Table 2 – Moray Summer 2026 Drillhole Collar Locations Hole ID Length (m) UTM Easting UTM Northing UTM Elevation Azimuth (degrees) Dip (degrees) NBR-26-29 322.0 492703 5320285 363 220 -70 NBR-26-30 250.0 492708 5320329 363 220 -47 NBR-26-31 274.0 492708 5320329 363 220 -60 NBR-26-32 352.0 492708 5320329 363 220 -70 Total 1,198.0 Coordinates are reported in UTM Zone 17 North, with units in metres. Figure 4 – Zavitz Gold Zone – Surface Traces of 2025 and 2026 Drillholes. All of the drilling at Moray has been completed by Enviro North Exploration Inc. out of Sturgeon Falls, Ontario. Drilling in the Zavitz gold zone is shown in figure 4, with the 1,996 metres in 10 holes drilled this summer depicted in red, the 2,807 metres in 20 holes drilled from January to April 2026 shown in blue and the 1,817 metres in 8 holes drilled in 2025 shown in black. In total, 6,620 metres in 38 drillholes have been completed in the Zavitz gold zone, while New Break has completed a total of 5,372 metres in 32 drillholes of our planned 2026, 10,000 metre drilling program. Appendix B – Drill Core Photos From NBR-26-29 and NBR-26-31

New Break Resources Ltd. (CSE: NBRK) (OTCQB: NBRKF) (FSE: O91) ha... READ MORE

September 16, 2026

New Found Gold Declares Commercial Production at Hammerdown Gold Mine

New Found Gold Corp. (TSX: NFGC) (NYSE American: NFGC) is pleased... READ MORE

September 16, 2026

G Mining Ventures Extends High-Grade Mineralization at Gurupi and Confirms Continuity at Depth at TZ

G Mining Ventures Corp. (TSX:GMIN | OTCQX:GMINF) provides an upda... READ MORE

September 16, 2026

Goliath Reports Multiple Holes With Visible Gold And Up To 13.81 g/t Au Over 4.85 Meters From Golden Gate Zone, 5.27 g/t AuEq Over 9.85 Meters From Surebet Zone At The High-Grade Gold Surebet Discovery that Remains Open for Expansion, Golden Triangle, B.C.

Assay results for drill holes GD-26-414, GD-26-426, GD-26-439, GD... READ MORE

September 16, 2026

Copyright 2026 The Prospector News