The Prospector News

Aura Announces Preliminary Q2 2025 Production Results

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Aura Announces Preliminary Q2 2025 Production Results

 

 

 

 

 

Aura Minerals Inc. (TSX: ORA) (B3: AURA33) (OTCQX: ORAAF) is pleased to announce Q2 2025 preliminary production results from the Company’s operating mines: Aranzazu, Apoena, Minosa, Almas and Borborema. Total production in Q2 2025 reached 64,033 gold equivalent ounces1,2, 7% higher than Q1 2025 and in line when compared to Q2 2024. At constant prices, Aura’s production increased by 9% compared to both Q1 2025 and Q2 2024.

 

Q2 2025 Highlights:

  • At Aranzazu, production reached 22,281 GEO, representing a 9% increase compared to the previous quarter, resulting from higher grades and better recoveries, despite the increase in gold prices which negatively impacted the conversion to GEO. When compared to Q2 2024, production decreased by 10% due to the sharp increase in gold prices between the periods which also impacted GEO conversion. At constant prices3, Aranzazu production increased by 17% when compared to Q1 2025 and 15% when compared to the Q2 2024, also due to higher grades.
  • At Minosa, production totaled 18,039 GEO, up 2% when compared to the previous quarter, resulting from higher grades processed during the quarter due to mine sequencing. When compared to the same quarter last year, production decreased by 6% and was in line with the Company’s expectations.
  • At Almas, production reached 12,917 GEO consistent with Q1 2025 (13,101 GEO). Compared to Q2 2024, production increased by 22%, driven by higher ore throughput and improved mine performance, reflecting the benefits of the plant expansion and the transition to the new mine contractor during Q2 2024.
  • At Apoena, production was in line with expectations and at 8,219 GEO, a 17% decrease from Q2 2024, primarily due to the mine’s investment phase and lower ore grades. Compared to Q1 2025, production decreased 7%, consistent with the mine plan, as lower-grade ore was mined. Despite this decrease, production remains in line with the Company`s full year 2025 expectations. Pre-stripping activities are underway while we push back the Nosde and Lavrinha mines to regain access to higher volume and higher grades by end of 2026 at Nosde Phase III.
  • At Borborema preliminary production totaled 2,577 GEO following the project’s first gold pour. Aura believes that Borborema remains on track to declare commercial production by the end of Q3 2025.

 

Production Results

 

Preliminary GEO45 production volume for the three months ended June 30, 2025, when compared to the previous quarter and the same period of the previous year is presented below by operating mine:

 

  Q2 2025 Q2 2024 Q1 2025 % change vs. Q2 2024 % change vs. Q1 2025
Ounces produced (GEO)          
Aranzazu 22,281 24,692 20,456 -10% 9%
Minosa 18,039 19,142 17,654 -6% 2%
Almas 12,917 10,580 13,101 22% -1%
Apoena 8,219 9,912 8,876 -17% -7%
Borborema 2,577 n.a. n.a.
Total GEO produced 64,033 64,326 60,087 -0% 7%
           

 

Qualified Person

 

The scientific and technical information contained within this news release has been reviewed and approved by Farshid Ghazanfari, P.Geo. Geology and Mineral Resources Manager for Aura Minerals Inc. and who serves as the Qualified Person as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

 

About Aura 360° Mining

 

Aura is focused on mining in complete terms – thinking holistically about how its business impacts and benefits every one of our stakeholders: our company, our shareholders, our employees, and the countries and communities we serve. We call this 360° Mining.

 

Aura is a company focused on the development and operation of gold and base metal projects in the Americas. The company’s five operating assets include the Minosa gold mine in Honduras; the Almas, Apoena, and Borborema gold mines in Brazil; and the Aranzazu copper, gold, and silver mine in Mexico. Additionally, the company owns Era Dorada, a gold project in Guatemala; Tolda Fria, a gold project in Colombia; and three projects in Brazil: Matupá, which is under development; São Francisco, which is in care and maintenance; and the Carajás copper project in the Carajás region, in the exploration phase.

 

The information contained in this press release is preliminary in nature and is provided for informational purposes only. It is based on current estimates, assumptions, and expectations, which remain subject to ongoing review, verification, and possible revision. Final Q2 2025 Production Results may differ from those set forth herein, and no assurance is given as to the accuracy or completeness of the information at this stage. Readers are cautioned not to place undue reliance on this preliminary results.

 

Posted July 4, 2025

Share this news article

MORE or "UNCATEGORIZED"


Spanish Mountain Gold Announces Larger Scale Preliminary Economic Assessment With a Base Case NPV5% After-Tax of C$1.0 Billion, 18.2 % IRR and 3.4 Year Payback at US$ 2,450/Oz Gold Price; at US$3,300/Oz Spot Gold Price NPV5% C$2.3 Billion, 32.0% IRR and 2.0 Year Payback; Including an Updated Mineral Resource Estimate for Its Spanish Mountain Gold Project

Spanish Mountain Gold Ltd. (TSX-V: SPA) (FSE: S3Y) (OTCQB: SPAUF)... READ MORE

July 4, 2025

Cascadia Announces Closing of Financing

Cascadia Minerals Ltd. (TSX-V:CAM) (OTCQB:CAMNF) is pleased to an... READ MORE

July 4, 2025

Abcourt Closes US$ 8M Loan Facility to Start Sleeping Giant Mine

Abcourt Mines Inc. (TSX-V: ABI) (OTCQB: ABMBF) is pleased to anno... READ MORE

July 4, 2025

Mishkeegogamang First Nation and First Mining Sign Long Term Relationship Agreement for the Development of the Springpole Gold Project

Agreement setting out the significant participation of Mishkeegog... READ MORE

July 4, 2025

Copyright 2025 The Prospector News