The Prospector News

Atico Reports 2020 Fourth Quarter and Full Year Production Results

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Atico Reports 2020 Fourth Quarter and Full Year Production Results

 

 

 

 

 

Atico Mining Corporation (TSX-V: ATY) (OTC: ATCMF) is pleased to announce operating results for the three and twelve month periods ended December 31, 2020 from its El Roble mine. Production totaled 5.22 million pounds of copper with 2,809 ounces of gold for the fourth quarter and 20.66 million pounds of copper with 10,792 ounces of gold in concentrates for the full year 2020.

 

“First and foremost, I would like to commend and extend appreciation to all of our employees for their hard work and dedication as we continued to operate safely during these extremely challenging circumstances,” said Fernando E. Ganoza, CEO. “The Company delivered strong production results for the year, achieving the set production guidance despite having to navigate stringent COVID-19 restrictions. We are anticipating that these results along with selling the majority of the scheduled concentrate inventory will lead to strong revenues for the fourth quarter and robust financials for year-end 2020. In the upcoming year, we will continue aggressive exploration at El Roble and La Plata properties to unlock value of the respective land packages while working towards achieving operational guidance for 2021.”

 

Fourth Quarter and Full Year Operational Highlights

 

Fourth Quarter

 

  • Production of 5.22 million pounds of copper contained in concentrates; a decrease of 7% over Q4 2019.
  • Production of 2,809 ounces of gold contained in concentrates; a decrease of 20% over Q4 2019.
  • Average processed tonnes per day of 870; no significant change over Q4 2019.
  • Copper and gold head grades of 3.52% and 2.00 grams per tonne; a decrease of 2.5% for copper and a decrease of 19% for gold over Q4 2019.
  • Copper and gold recovery of 91.5% and 59.5%; no significant change over Q4 2019.

 

2020 Year-end

 

  • Production of 20.66 million pounds of copper contained in concentrates; an increase of 23% over 2019.
  • Production of 10,792 ounces of gold contained in concentrates; an increase of 3% over 2019.
  • Average processed tonnes per day of 871; an increase of 1.9% over 2019.
  • Copper and gold head grades of 3.49% and 2.35 grams per tonne; no significant change for copper and a decrease of 15% for gold over 2019.
  • Copper and gold recovery of 92.0% and 58.5%; no significant change over Q4 2019.

 

 

Fourth Quarter and Full Year Operational Details

 

  Q1 Total Q2 Total Q3 Total Q4 Total 2020 Total
Production (Contained in Concentrates)          
Copper (000s pounds) 4,947 4,956 5,540 5,216 20,662
Gold (ounces) 2,658 2,718 2,607 2,809 10,792
Mine          
Tonnes of ore mined 72,777 76,825 71,993 72,825 294,421
Mill          
Tonnes processed 73,374 71,804 73,603 73,500 292,281
Tonnes processed per day 878 903 860 870 871
Copper grade (%) 3.32 3.37 3.74 3.52 3.49
Gold grade (g/t) 1.94 2.02 1.93 2.00 1.97
Recoveries          
Copper (%) 91.9 92.7 91.4 91.5 92.0
Gold (%) 59.0 58.6 56.3 59.5 58.5
Concentrates          
Copper and gold concentrates (dmt) 10,232 10,828 11,957 11,516 44,534
           
Payable copper produced (000s lbs) 4,700 4,708 5,263 4,955 19,629

Note: Metal production figures are subject to adjustments based on final settlement.

2021 Operating and Capital Guidance

2021 Production and Cost Guidance  
Copper (000s pounds) 20,500 to 21,500
Gold (ounces) 10,500 to 11,500
C1 Cash Cost ($US)(1) $1.15 to $1.25

Note: Please see “Non-GAAP Financial Measures” at the end of this release. C1 cash cost per pound of payable copper produced net of by-product credits and selling costs.

 

El Roble Mine

 

The El Roble mine is a high grade, underground copper and gold mine with nominal processing plant capacity of 1,000 tonnes per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.

 

Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a historical nominal capacity of 400 tonnes per day.

 

El Roble has Proven and Probable reserves of 1.47 million tonnes grading 3.40% copper and 1.88 g/t gold, at a cut-off grade of 1.93% copper equivalent as of June 30th, 2018. Mineralization is open at depth and along strike and the Company plans to further test the limits of the deposit.

 

On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey pelagic sediments and cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified numerous target areas prospective for VMS type mineralization occurrence, which is the focus of the current surface drill program at El Roble.

 

Qualified Person

 

Mr. Thomas Kelly (SME Registered Member 1696580), advisor to the Company and a qualified person under National Instrument 43-101 standards, is responsible for ensuring that the technical information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico.

 

About Atico Mining Corporation

 

Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company operates the El Roble mine and is pursuing additional acquisition opportunities.

 

Posted January 21, 2021

Share this news article

MORE or "UNCATEGORIZED"


Silver Mountain Announces Closing of Prospectus Offering

Silver Mountain Resources Inc. (TSX-V: AGMR) (OTCQB: AGMRF) is ... READ MORE

April 24, 2024

Mandalay Extends the Storheden Gold Deposit Adjacent to the Operating Björkdal Mine

Mandalay Resources Corporation (TSX: MND) (OTCQB: MNDJF) announce... READ MORE

April 24, 2024

Collective Mining Intercepts 632.25 Metres at 1.10 g/t Gold Equivalent in a 200 Metre Step-Out Hole to the South at Trap

Collective Mining Ltd. (TSX: CNL) (OTCQX: CNLMF) (FSE: GG1) is pl... READ MORE

April 24, 2024

Koryx Copper Intersects 207 Meters at 0.49% and 116 Meters at 0.54% Copper Equivalent

Significant copper and molybdenum intersections include: HM19: 11... READ MORE

April 24, 2024

Red Pine Intercepts Significant Mineralization at the Wawa Gold Project, including 5.34 g/t over 13.39 metres including 16.50 g/t gold over 0.97 metre and 13.62 g/t gold over 2.13 metres

Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE

April 24, 2024

Copyright 2024 The Prospector News