The Prospector News

Atico Produces 3.73 Million Pounds of Cu and 2,874 Ounces of Au in Second Quarter 2024

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Atico Produces 3.73 Million Pounds of Cu and 2,874 Ounces of Au in Second Quarter 2024

 

 

 

 

 

Atico Mining Corporation (TSX-V: ATY) (OTCQX: ATCMF) announces its operating results for the three months ended June 30, 2024 from its El Roble mine. Production for the quarter totaled 3.73 million pounds of copper and 2,874 ounces of gold in concentrates, an increase of 33% for copper and 25% for gold, respectively, over the same period in 2023.

 

“The El Roble mine continued to operate within set expectations for this quarter as we saw improvements in most metrics over the previous quarter and especially over the same period last year” said Fernando E. Ganoza, CEO. “In the second half of the year, we are anticipating a continuation of good production results as we gain further access to the newly discovered areas of high-grade ore. In parallel, we will continue looking for opportunities to improve metal output to take advantage of the higher metal price environment, as well as the continuation of the near mine exploration program aimed at replenishing resources and extending the life of mine.”

 

Second Quarter Operational Highlights

  • Production of 3.73 million pounds of copper contained in concentrates; an increase of 33% over Q2 2023.
  • Production of 2,874 ounces of gold contained in concentrates; an increase of 25% over Q2 2023.
  • Average processed tonnes per day of 852, an increase of 7% over Q2 2023.
  • Copper head grade of 2.59%, an increase of 27% over Q2 2023.
  • Gold head grade of 1.94 grams per tonne; an increase of 9% over Q2 2023.
  • Copper and gold recovery of 92% and 65%; an increase of 1% for copper and 11% for gold, respectively, over Q2 2023.

 

Second Quarter Concentrate Shipment

 

The Company had scheduled one large concentrate shipment of around 9,100 dry metric tonnes for this period. Due to poor weather conditions and shipping delays, the vessel had arrived considerably later than scheduled and as a result approximately 60% of the planned tonnes of concentrate were loaded by the June 30th cutoff date. The remaining 40% of the planned second quarter shipment was loaded on the following two days. In accordance with our accounting policies, the revenue derived from tonnes loaded after June 30th will be recognized in the subsequent quarter along with the expected revenue from the shipment planned for the third quarter.

 

Therefore, the second quarter financials will be impacted by lower recognized revenues from this concentrate shipment which will then be offset by higher recognized revenue for the third quarter.

 

Second Quarter Operational Details

 

  Q2 2024 Total Q2 2023 Total % Change
Production (Contained in Concentrates)      
Copper (000s pounds) 3,728 2,804 33 %
Gold (ounces) 2,874 2,294 25 %
Mine      
Tonnes of ore mined 70,826 72,340 -2 %
Mill      
Tonnes processed 71,079 68,471 4 %
Tonnes processed per day 852 800 7 %
Copper grade (%) 2.59 2.04 27 %
Gold grade (g/t) 1.94 1.78 9 %
Recoveries      
Copper (%) 92.0 91.1 1 %
Gold (%) 65.2 58.7 11 %
Concentrates      
Copper and Gold Concentrates (dmt) 9,200 6,784 36 %
       
Payable copper produced (000s lbs) 3,505 2,639 44 %

Note: Metal production figures are subject to adjustments based on final settlement. The reported results are preliminary in nature and are awaiting independent lab verification.

 

Concentrate Inventory

 

The number of shipments the Company can export in any given quarter depends on several variables some of which the Company does not control, hence there may be an inherent variability in tonnes shipped quarter to quarter.

 

  Q2 2024 Total  
Amounts in dry metric tonnes  
Opening inventory 7,002  
Production 9,200  
Sales (5,603 )
Adjustments 28  
Number of shipments 1  
Closing inventory 10,627  

Note: Concentrate figures are subject to adjustments based on final settlement.

 

El Roble Mine

 

The El Roble mine is a high grade, underground copper and gold mine with nominal processing plant capacity of 1,000 tonnes per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.

 

Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a historical nominal capacity of 400 tonnes per day.

 

El Roble’s reserves estimate, with an effective date of March 12, 2024, includes Proven and Probable mineral reserves of 828 thousand tonnes averaging 2.49% Cu, 2.20 g/t Au and a life of mine until Q1-2027. A full NI 43-101 technical report is available on SEDAR+.  For more information on the reserves estimate refer to SEDAR+ and on the Company’s website.

 

Mineralization is open at depth and along strike and the Company plans to further test the limits of the deposit. On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey pelagic sediments and cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified numerous target areas prospective for VMS type mineralization occurrence, which is the focus of the current surface drill program at El Roble.

 

Qualified Person

 

Mr. Thomas Kelly (SME Registered Member 1696580), advisor to the Company and a qualified person under National Instrument 43-101 standards, is responsible for ensuring that the technical information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico.

 

About Atico Mining Corporation

 

Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company generates significant cash flow through the operation of the El Roble mine and is developing its high-grade La Plata VMS project in Ecuador. The Company is also pursuing additional acquisition of advanced stage opportunities.

Posted July 19, 2024

Share this news article

MORE or "UNCATEGORIZED"


Imperial Metals Drilling Intersects 152.5 Metres Grading 0.46% Copper and 0.97 g/t Gold at Mount Polley

Imperial Metals Corporation (TSX:III) reports initial diamond drill results from the Mount Polley 20... READ MORE

May 23, 2025

Silvercorp Reports Adjusted Net Income of $75.1 Million, $0.37 Per Share, and Cash Flow from Operations of $138.6 Million for Fiscal 2025

Silvercorp Metals Inc. (TSX: SVM) (NYSE American: SVM) reported its financial and operating results... READ MORE

May 23, 2025

New Found Gold Continues to Expand the Dropkick Zone at the Queensway Gold Project: 42.8 g/t Au over 14.95 m, 47.6 g/t Au over 3.95 m and 22.9 g/t Au over 2.40 m

New Found Gold Corp. (TSX-V: NFG) (NYSE-A: NFGC) is pleased to announce new drill results from the ... READ MORE

May 22, 2025

West Red Lake Gold Announces Official Restart of the Madsen Mine

West Red Lake Gold Mines Ltd. (TSX-V: WRLG) (OTCQB: WRLGF) is pleased to report that, at a meeting... READ MORE

May 22, 2025

Troilus Intercepts 2.44 g/t AuEq Over 23m Within Broader Zone of 1.79 g/t AuEq Over 36m; Extends High-Grade Zone to Surface in the Southwest Zone

Troilus Gold Corp. (TSX: TLG) (OTCQX: CHXMF) (FSE: CM5R) is pleased to report additional positive dr... READ MORE

May 22, 2025

Copyright 2025 The Prospector News