The Prospector News

Assays Pending on Globex’s Kewagama Royalty Portion of Radisson’s O’Brien Property

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Assays Pending on Globex’s Kewagama Royalty Portion of Radisson’s O’Brien Property

 

 

 

 

 

GLOBEX MINING ENTERPRISES INC. (TSX:GMX)  (FRA G1MN) (OTCQX:GLBXF)  is pleased to report in a press release dated January 22, 2024, Radisson Mining Resources Inc. (RDS-TSXV, RMRDF-OTCQB) announced that 4,570 metres of assays are pending from 9 completed drill holes on Trends 3 and 4, wholly located on the Kewagama Gold Mine portion of their O’Brien Gold Mine Project (see drill plan and longitudinal section below). Globex holds a 2% Net Smelter Royalty on the Kewagama Gold Mine property.

 

Longitudinal section looking north – O’Brien gold project – Radisson Mining Resources

 

 

Additional drilling is well underway.

 

This press release was written by Jack Stoch, Geo., President and CEO of Globex in his capacity as a Qualified Person (Q.P.) under NI 43-101.

 

Posted January 24, 2024

Share this news article

MORE or "UNCATEGORIZED"


Blue Star Gold Announces Phase 2 Exploration Drilling Results at Auma Project - Bamako Prospect Returns 1.9 m of 16.74 g/t Au and 2.0 m of 10.6 g/t Au

Blue Star Gold Corp. (TSX-V: BAU) (OTCQB: BAUFF) (FSE: 5WP0) anno... READ MORE

August 26, 2026

Guanajuato Silver Reports Second Consecutive Quarter of Positive Net Income

GSilver reports Q2 operating income of US$9.1M Guanajuato Silver ... READ MORE

August 26, 2026

Scandium Canada Intersects 124.9 m at 232 ppm Scandium Oxide at Crater Lake and Identifies a Favourable Corridor of Nearly 3 km

HIGHLIGHTS First drill assay results from the 2026 Crater Lake dr... READ MORE

August 26, 2026

Legacy Gold Extends Main Zone Width to 1,020ft (310m), Intersecting 0.67 g/t Gold over 50ft (15.2m) and 0.39 g/t over 200ft (61.0m) at Baner, Idaho

Legacy Gold Mines Ltd. (TSX-V: LEGY) is pleased to report assay r... READ MORE

August 26, 2026

VR intersects 317 m at 0.77% CuEq starting at surface, above 419 m of 0.48% CuEq, in 881 m drill hole of continuous polymetallic stockwork veining at New Boston Porphyry-Skarn project, Nevada

0.77% CuEq* over 317m starting at surface;   0.48% CuEq* over 41... READ MORE

August 26, 2026

Copyright 2026 The Prospector News