Ascot Resources Ltd (TSX: AOT) (OTCQX: AOTVF) is pleased to announce the results from forty-two drill holes completed at the Big Missouri deposit of Ascot’s Premier Gold Project near Stewart in northwestern British Columbia. These results should be considered in conjunction with previous news releases on Big Missouri dated June 27, July 17, July 25, August 8 and August 27.
Highlights of this release include:
Derek White, President and CEO of Ascot commented, “In 2019, the Company drilled just over 24,000 metres in 147 holes at Big Missouri with a total of 321 reported gold intercepts. In the past, Big Missouri was drilled to demonstrate wide zones of lower grade gold for open pit mining. Over the past two years the Company has focussed drilling on higher grade underground targets, especially around the S1 pit and Unicorn areas. We will incorporate this new drill data into an updated resource estimate.
“Big Missouri is a large area with enormous potential. We are confident that the drilling will convert a substantial amount of our inferred resources to the indicated category for our mine planning and the upcoming feasibility study.”
The Big Missouri deposit is located approximately five kilometres to the north of the Premier mill along the Big Missouri haul road. Westmin Resources previously mined gold from the S1 pit at Big Missouri and in the first half of the 20th century the deposit had limited production from underground. Mineralization at Big Missouri covers a large area and gold zones are present at three different stratigraphic levels in sub-horizontal zones with a gentle westerly dip. The drill program at Big Missouri was designed to convert a portion of the inferred resources to the indicated category. This news release completes the reporting of infill drilling from Big Missouri.
Drill Results
This news release presents the results from 42 drill holes, comprising 6,297 metres of drilling, completed from nine separate pads into the Big Missouri deposit. This set of holes was completed to test an area to the south of the S1 pit and the Unicorn area to the north (see figure 1). It is interesting that holes P19-2142 and P19-2145 intercepted gold mineralization as these holes were drilled for geotechnical purposes at a proposed portal site in the southern high wall of the S1 pit. This is the second proposed portal site where gold mineralization was intercepted during geotechnical investigations. The proximity of gold mineralization to a proposed access point is a very positive development in the course of our work towards restarting gold production at the Premier mill.
The drill results are favourable with gold intercepts at expected depth and confirming previously established orientations of mineralized zones. Figure 2 shows a cross section of drill holes P19-2109 and P19-2110 that were designed to follow up a previous high-grade intercept in hole P14-608 (83.5g/t Au over 1.52 metres). The drill holes intercepted gold mineralization at similar depth and are now aiding to establish one of the modeled zones, in this case solid 79 (see Figure 2). As a result of the two new drill holes, some of the ore blocks in the vicinity of the three holes will potentially qualify to be classified in the indicated category in an area where blocks were classified as inferred previously.
The results from the final set of drill holes at Big Missouri are summarized in Table 1 and the pad locations are listed in Table 2.
Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/927162f4-07d5-4aa3-8a34-6956c9e1b0a0
https://www.globenewswire.com/NewsRoom/AttachmentNg/b629c5bc-6413-4c5e-bcae-54330d18ce0d
Table 1 Summary of drill results from Big Missouri
Hole # | pad | azimuth/dip | From (m) | To (m) |
Width (m) |
Au (g/t) |
Ag (g/t) |
P19-1994 | BM-37 | 298/-45 | 107.00 | 117.98 | 10.98 | 2.04 | 4.2 |
also | 127.09 | 128.09 | 1.00 | 3.45 | 4.0 | ||
P19-1995 | BM-37 | 276/-53 | 123.74 | 125.74 | 2.00 | 2.62 | 3.0 |
P19-1996 | BM-37 | 270/-76 | 122.00 | 125.00 | 3.00 | 2.54 | 3.3 |
also | 141.33 | 141.94 | 0.61 | 2.19 | 2.0 | ||
and | 149.65 | 150.65 | 1.00 | 3.86 | 9.0 | ||
P19-1997 | BM-37 | 270/-87 | 144.03 | 152.03 | 8.00 | 1.25 | 4.8 |
P19-1998 | BM-37 | 240/-67 | 5.20 | 7.20 | 2.00 | 2.73 | 21.0 |
also | 98.80 | 102.20 | 3.40 | 1.36 | 6.2 | ||
and | 121.78 | 123.78 | 2.00 | 4.47 | 3.0 | ||
and | 141.35 | 142.40 | 1.05 | 3.24 | 4.0 | ||
and | 166.00 | 168.00 | 2.00 | 2.02 | 3.0 | ||
P19-1999 | BM-37 | 226/-75 | 4.88 | 6.88 | 2.00 | 2.75 | 13.0 |
also | 147.10 | 152.60 | 5.50 | 22.54 | 8.3 | ||
incl. | 149.10 | 151.10 | 2.00 | 45.30 | 11.0 | ||
P19-2000 | BM-37 | 155/-79 | 73.86 | 74.86 | 1.00 | 2.51 | 11.0 |
also | 128.50 | 130.10 | 1.60 | 2.42 | 9.0 | ||
and | 157.00 | 159.00 | 2.00 | 2.20 | 2.0 | ||
and | 161.30 | 162.30 | 1.00 | 2.94 | 6.0 | ||
and | 164.81 | 168.40 | 3.59 | 1.95 | 8.5 | ||
P19-2005 | BM-37 | 45/-48 | 94.43 | 95.93 | 1.50 | 6.41 | 28.0 |
P19-2014 | BM-17 | 90/-74 | 59.50 | 62.50 | 3.00 | 3.32 | 10.7 |
also | 66.50 | 67.50 | 1.00 | 3.85 | 16.0 | ||
and | 71.50 | 73.50 | 2.00 | 4.05 | 11.5 | ||
P19-2015 | BM-17 | 90/-82 | 65.28 | 70.50 | 5.22 | 2.51 | 10.1 |
also | 91.00 | 92.00 | 1.00 | 3.30 | 7.0 | ||
and | 114.50 | 118.00 | 3.50 | 3.28 | 13.5 | ||
P19-2016 | BM-17 | 0/-59 | 57.00 | 59.00 | 2.00 | 8.01 | 7.0 |
also | 88.00 | 89.00 | 1.00 | 4.85 | 9.0 | ||
P19-2017 | BM-17 | 310/-85 | 62.00 | 65.06 | 3.06 | 3.33 | 11.91 |
P19-2018 | BM-30 | 240/-50 | 11.47 | 12.47 | 1.00 | 1.91 | 5.0 |
P19-2019 | BM-30 | 90/-77 | 34.50 | 35.50 | 1.00 | 2.47 | 8.0 |
also | 50.00 | 52.00 | 2.00 | 2.65 | 9.0 | ||
P19-2020 | BM-30 | 270/-64 | 22.00 | 23.50 | 1.50 | 2.88 | 4.0 |
also | 35.94 | 38.00 | 2.06 | 24.90 | 7.0 | ||
and | 63.00 | 65.00 | 2.00 | 3.65 | 17.0 | ||
and | 148.94 | 151.00 | 2.06 | 2.08 | 3.0 | ||
P19-2021 | BM-30 | 270/-82 | no significant intercept | ||||
P19-2022 | BM-30 | 90/-86 | 8.05 | 9.05 | 1.00 | 9.40 | 12.0 |
also | 71.70 | 73.70 | 2.00 | 2.99 | 8.0 | ||
and | 94.30 | 95.30 | 1.00 | 21.20 | 9.0 | ||
and | 118.50 | 119.50 | 1.00 | 2.51 | 5.0 | ||
P19-2023 | BM-30 | 90/-65 | 9.50 | 10.50 | 1.00 | 2.76 | 3.0 |
also | 22.78 | 23.78 | 1.00 | 5.72 | 22.5 | ||
and | 106.70 | 108.70 | 2.00 | 3.04 | 10.0 | ||
and | 114.10 | 117.25 | 3.15 | 5.78 | 13.0 | ||
P19-2067 | BM-33 | 90/-66 | 9.10 | 13.10 | 4.00 | 3.57 | 21.5 |
also | 19.83 | 21.83 | 2.00 | 5.53 | 23.5 | ||
and | 28.04 | 30.04 | 2.00 | 2.56 | 7.0 | ||
and | 34.24 | 36.24 | 2.00 | 7.21 | 4.0 | ||
and | 73.35 | 86.15 | 12.80 | 3.44 | 13.5 | ||
incl. | 78.57 | 80.57 | 2.00 | 6.66 | 27.0 | ||
and | 111.06 | 117.79 | 6.73 | 2.73 | 10.6 | ||
and | 137.00 | 138.00 | 1.00 | 9.70 | 7.0 | ||
P19-2068 | BM-33 | 90/-86 | 18.36 | 23.50 | 5.14 | 5.68 | 10.6 |
also | 38.25 | 39.57 | 1.32 | 9.39 | 8.0 | ||
and | 130.73 | 132.00 | 1.27 | 3.20 | 77.5 | ||
P19-2069 | BM-33 | 30/-47 | 17.02 | 26.77 | 9.75 | 2.15 | 15.4 |
P19-2070 | BM-33 | 270/-82 | 149.50 | 150.50 | 1.00 | 17.70 | 17.0 |
also | 154.50 | 155.50 | 1.00 | 149.00 | 67.0 | ||
P19-2071 | BM-33 | 270/-72 | 22.50 | 24.50 | 2.00 | 9.40 | 10.0 |
P19-2075 | BM-33 | 90/-60 | 18.55 | 22.41 | 3.86 | 8.02 | 26.3 |
incl. | 20.41 | 21.14 | 0.73 | 12.20 | 39.0 | ||
also | 58.42 | 60.42 | 2.00 | 2.99 | 6.0 | ||
and | 114.67 | 121.95 | 7.28 | 4.73 | 15.7 | ||
incl. | 121.24 | 121.95 | 0.71 | 9.50 | 22.0 | ||
and | 125.42 | 126.42 | 1.00 | 2.80 | 18.0 | ||
and | 154.45 | 155.45 | 1.00 | 6.80 | 8.0 | ||
and | 170.00 | 172.00 | 2.00 | 5.76 | 5.0 | ||
P19-2100 | BM-44 | 280/-64 | 22.00 | 24.00 | 2.00 | 7.34 | 12.0 |
also | 100.00 | 101.00 | 1.00 | 1.87 | 3.0 | ||
P19-2101 | BM-44 | 280/-55 | 135.94 | 137.50 | 1.56 | 1.99 | 8.0 |
also | 140.50 | 142.00 | 1.50 | 1.96 | 6.0 | ||
P19-2102 | BM-44 | 11/-82 | 73.70 | 76.00 | 2.30 | 2.16 | 8.0 |
P19-2103 | BM-44 | 280/-84 | 31.00 | 32.48 | 1.48 | 7.67 | 16.0 |
also | 98.00 | 99.00 | 1.00 | 4.08 | 5.0 | ||
and | 144.90 | 147.00 | 2.10 | 2.02 | 3.0 | ||
P19-2104 | BM-44 | 62/-72 | 83.00 | 85.00 | 2.00 | 2.57 | 8.0 |
also | 111.00 | 113.00 | 2.00 | 2.07 | 16.0 | ||
P19-2105 | BM-44 | 135/-76 | 17.85 | 18.91 | 1.06 | 2.22 | 13.0 |
also | 99.08 | 100.50 | 1.42 | 1.70 | 32.0 | ||
P19-2106 | BM-02 | 90/-49 | 63.09 | 66.24 | 3.15 | 5.51 | 21.3 |
incl. | 64.09 | 65.09 | 1.00 | 9.67 | 22.0 | ||
also | 117.16 | 120.25 | 3.09 | 5.61 | 30.6 | ||
incl. | 118.70 | 120.25 | 1.55 | 8.27 | 47.0 | ||
P19-2107 | BM-02 | 90/-64 | 36.29 | 37.65 | 1.36 | 8.56 | 10.0 |
P19-2108 | BM-02 | 90/-75 | 8.84 | 10.84 | 2.00 | 3.05 | 12.0 |
P19-2109 | BM-01 | 280/-60 | 214.31 | 215.67 | 1.36 | 5.48 | 12.0 |
P19-2110 | BM-01 | 280/-72 | 173.36 | 174.61 | 1.25 | 1.12 | 2.5 |
P19-2119 | BM-48 | 285/-48 | 109.62 | 111.55 | 1.93 | 1.01 | 5.0 |
P19-2120 | BM-48 | 268/-50 | 59.00 | 60.45 | 1.45 | 1.57 | 3.0 |
P19-2121 | BM-48 | 249/-67 | 18.35 | 22.66 | 4.31 | 4.31 | 15.4 |
incl. | 18.35 | 20.00 | 1.65 | 6.12 | 16.0 | ||
also | 116.50 | 117.50 | 1.00 | 4.04 | 26.0 | ||
P19-2122 | BM-48 | 228/-75 | 12.17 | 13.59 | 1.42 | 1.85 | 18.0 |
P19-2141 | GT-BM-02 | 290/-52 | no significant intercept | ||||
P19-2142 | GT-BM-02 | 290/-85 | 22.00 | 24.00 | 2.00 | 2.08 | 3.0 |
P19-2145 | GT-BM-02 | 290/-38 | 92.41 | 93.56 | 1.15 | 12.00 | 10.0 |
True width is estimated to be approximately 70-90% of reported intercepts. The drill holes that are missing in the sequence have already been reported or are geotechnical holes.
Table 2 Drill pad locations
Pad # | UTM N | UTM E | Elevation | Hole no. |
BM-01 | 6219000 | 436330 | 1049 | 2109, 2110 |
BM-02 | 6219128 | 436357 | 1058 | 2106-2108 |
BM-17 | 6219585 | 436765 | 965 | 2014-2017 |
BM-30 | 6219650 | 436675 | 992 | 2018-2023 |
BM-33 | 6219675 | 436667 | 1000 | 2067-2071, 2075 |
BM-37 | 6219775 | 436772 | 1018 | 1994-2000, 2005 |
BM-44 | 6219867 | 436760 | 1028 | 2100-2105 |
BM-48 | 6219911 | 436722 | 1022 | 2119-2122 |
GT-BM-02 | 6219209 | 436496 | 1002 | 2141, 2142, 2145 |
Quality Assurance/Quality Control
Lawrence Tsang, P. Geo., the Company’s Senior Geologist provides the field management for the Premier exploration program. John Kiernan, P. Eng., Chief Operating Officer of the Company is the Company’s Qualified Person (QP) as defined by National Instrument 43-101 and has reviewed and approved the technical contents of this news release.
Analytical work is being carried out by SGS Canada Inc (“SGS”). Ascot’s quality-assurance and quality-control program includes the use of analytical blanks to monitor for cross contamination, certified reference material standards to assess analytical accuracy, and duplicate samples to quantify sampling precision. This is in addition to the internal quality assurance program employed by SGS.
Samples are dried and weighed by SGS. They are then crushed to 75% passing 2mm, with 250g split and pulverized to 85% passing 75µm. Samples are processed on site by a mobile lab supplied by SGS and run by SGS personnel. All splits are sent to SGS in Burnaby. There, all samples are digested using aqua-regia with an ICP-AES finish and fire assay with AA finish for gold. Samples over 100ppm silver are digested with aqua regia and then volumetrically diluted before an ICP-AES or AA finish (up to 1,500ppm). Samples over 1,500ppm silver are fire assayed with a gravimetric finish. Samples over 10ppm gold are fire assayed with a gravimetric finish. Identified or suspected metallic gold or silver are subjected to “metallics” assays. Sampling and storage are at the Company’s secure facility in Stewart.
About Ascot Resources Ltd.
Ascot is a Canadian-based junior exploration company focused on re-starting the past producing historic Premier gold mine, located in British Columbia’s Golden Triangle. The Company continues to define high-grade resources for underground mining with the near-term goal of converting the underground resources into reserves, while continuing to explore nearby targets on its Premier/Dilworth and Silver Coin properties (collectively referred to as the Premier project). Ascot’s acquisition of IDM Mining added the high-grade gold and silver Red Mountain project to its portfolio and positions the Company as a leading consolidator of high- quality assets in the Golden Triangle.
Silver Mountain Resources Inc. (TSX-V: AGMR) (OTCQB: AGMRF) is ... READ MORE
Mandalay Resources Corporation (TSX: MND) (OTCQB: MNDJF) announce... READ MORE
Collective Mining Ltd. (TSX: CNL) (OTCQX: CNLMF) (FSE: GG1) is pl... READ MORE
Significant copper and molybdenum intersections include: HM19: 11... READ MORE
Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE