The Prospector News

Asante Announces Significant Gold Intercepts From Its Ongoing Exploration Program at Aboduabo Prospect

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Asante Announces Significant Gold Intercepts From Its Ongoing Exploration Program at Aboduabo Prospect

 

 

 

 

 

Asante Gold Corporation (CSE:ASE) (GSE:ASG) (FRANKFURT:1A9) (U.S.OTC:ASGOF) is pleased to announce results from its ongoing exploration drilling program at the Aboduabo prospect located on our Bibiani – Chirano mines corridor, Sefwi Greenstone Belt, Ghana.

 

The Sefwi Greenstone Belt is host to historically significant gold mining operations including our Bibiani and Chirano mines which have produced +8Moz to date from shear faults and veins. Asante controls a 53km long by up to 5km wide corridor which is transected by both the Bibiani and Chirano shear zones. Bibiani and Chirano together have current mineral reserves of ~2.8Moz and Measured and Indicated mineral resources over 4.5Moz. The Company is exploring the corridor for new discoveries, to grow our mine and near mine resources, and to increase the Life of Mine at both operations.

 

Aboduabo Prospect

 

The Company announced initial exploration results on January 17, 2023. To date nineteen holes totaling 4,300m have been completed. The drilling program has been accelerated and new intercepts confirm near surface, high grade mineralization, with increased widths. The gold mineralization remains open along strike and to depth.

 

The Aboduabo prospect is located approximately 5km north of the Chirano Process Plant and 10km south of the Bibiani Process Plant. It lies within the Bibiani mineralized trend and is hosted in Birimian sedimentary rock sequences. The Chirano gold deposits are primarily hosted in Birimian volcanic and granitoid sequences along the sub parallel Chirano trend.

 

Highlights

  • New drill intercepts include CHDD3347, which intersected 43.10m grading 3.07g/t Au; including 9.95m grading 6.85 g/t Au.
  • All holes intersected gold mineralization, which remains open in all directions.
  • Footprint of gold mineralization tested and confirmed over 1km strike length and remains open along strike and depth.
  • Several mineralized intercepts indicate grade and width that are amenable to open pit mining.
  • Additional drilling is currently underway to follow up on these drill results.
  • Selected intercepts include:
    • CHDD3347 – 43.10m @ 3.07 g/t Au from 169.5 to 212.6m
      • Includes 9.95m @ 6.85 g/t Au from 196.0m to 205.95m
    • CHRC3359 – 26.0m @ 3.12 g/t Au from 121.0m to 147.0m
      • Includes 18.0m @ 4.19 g/t Au from 123.0m to 141.0m
    • CHRC3350 – 15.0m @ 2.65 g/t Au from 85.0m to 100.0m
      • Includes 7.0m @ 4.44 g/t Au from 85.0m to 92.0m
    • CHRC3357- 17.0m @ 1.74 g/t Au from 44.0m to 61.0m
      • Includes 5.0m @ 4.22 g/t Au from 55.0m to 60.0m
    • CHRC3348D – 13.2m @ 1.59 g/t Au from 199.3m to 212.5m

 

Dave Anthony, President, and CEO stated, “We are pleased to report these additional assay results from our exploration drilling program at Aboduabo. These results highlight the potential of this deposit, which is close to surface and mineralized over an area up to 130m wide x 1km long. The drill program to advance the target to resource definition has been accelerated. These results demonstrate the significant exploration potential that remains along the Bibiani – Chirano Corridor.”

 

Drill Results

 

Table 1: Summary drill results from the Aboduabo Prospect

 

Hole ID From To Interval Au Elevation Intercept
  (m) (m) (m) (g/t) mRL  
CHDD3347 169.5 212.6 43.1 3.07 126 43.1m @ 3.07 g/t Au
CHDD3347 Including   196.0 205.95 9.95 6.85 119 9.95m @ 6.85 g/t Au
CHRC3359 121.0 147.0 26.0 3.11 209 26.0m @3.11 g/t Au
CHRC3359 Including   123.0 141.0 18.0 4.19 211 18.0m @ 4.19 g/t Au
CHRC3350 85.0 100.0 15.0 2.64 226 15.0m @ 2.64 g/t Au
CHRC3350 Including      85.0 92.0 7.0 4.44 229 7.0m @ 4.44 g/t Au
CHRC3357 44.0 61.0 17.0 1.74 294 17.0m @ 1.74 g/t Au
CHRC3357 Including      55.0 60.0 5.0 4.22 291 5.0m @ 4.22 g/t Au
CHRC3348D 199.3 212.5 13.2 1.59 94 13.2m @ 1.59 g/t Au
CHRC3348D Including 200.15 203.5 3.35 3.93 97 3.35m @ 3.93 g/t Au
CHDD3346 219.4 224.55 5.15 1.45 206 5.15m @ 1.45 g/t Au
CHRC3349 258.0 269.0 11.0 0.48 92 11.0m @ 0.48 g/t Au
CHRC3351 131.0 134.0 3.0 3.55 209 3.0m @ 3.55 g/t Au
CHRC3352 80.0 82.0 2.0 0.99 216 2.0m @ 0.99 g/t Au
CHRC3353 38.0 39.0 1.0 0.82 294 1.0m @ 0.82 g/t Au
CHRC3354 86.0 91.0 5.0 0.78 225 5.0m @ 0.78 g/t Au
CHRC3355 189.0 190.0 1.0 0.56 139 1.0m @ 0.56 g/t Au
CHRC3356 173.0 190.0 17.0 0.89 146 17.0m @ 0.89 g/t Au
CHRC3356 Including    173.0 177.0 4.0 2.74 151 4.0m @ 2.74 g/t Au
*CHDD3339 96.5 117.95 21.45 2.99 238 21.45m @ 2.99 g/t Au
*CHDD3339 Including    106.6 117.95 11.35 4.73 234 11.35m @ 4.73 g/t Au
*CHDD3341 188.0 210.0 22.0 1.31 117 22.0m @ 1.31 g/t Au
*CHDD3341 Including    198.0 210.0 12.0 1.72 114 12.0m @ 1.72 g/t Au
*CHRC3343D 264.5 268.55 4.05 5.56 74 4.05m @ 5.56 g/t Au
*CHDD3344 58.0 75.6 17.6 1.20 268 17.6m @ 1.20 g/t Au
*CHDD3345 168.0 177.0 9.0 2.93 200 9.0m @ 2.93 g/t Au

Notes:

  1. Intervals reported are down hole lengths. True width estimated @ 80%.
  2. Length-weighted averages from uncapped assays with assumptions of 0.5g/t cut off and <3m internal waste.
  3. * Previously reported.

 

 

Figure 1: Aeromagnetic map of the Bibiani – Chirano Gold Corridor, principal Asante gold deposits and recent significant intercepts at the Aboduabo prospects.

 

Figure 2: Plan view map of Aboduabo showing collar locations and recent drill results.
(* Previously reported result.)

 

Figure 3: Aboduabo – Cross-section looking north recent drill intercepts (CHDD3347 and CHRC3351)

 

 

QA/QC

 

Asante employs a QA/QC program consistent with NI 43-101 and industry best practices. Surface drilling was conducted by GTS Drilling Services supervised by the Asante exploration teams.  Selected drill core intervals were sawn in half with a diamond blade saw. Half of the sampled core was left in the core box and the remaining half was bagged and sealed. Asante utilizes accredited laboratories, and the samples were transported to ALS-Kumasi, Ghana. Gold was analyzed by 50-gram fire assay with AA-finish. Certified reference material (CRM) standards and coarse blank material are inserted every 20 samples. Drill intercepts cited do not necessarily represent true widths, unless otherwise noted.

 

Qualified Person Statement

 

Scientific and technical information contained in this news release has been reviewed and approved by Kwamina Ackun-Wood, a member of the Australasian Institute of Mining and Metallurgy, and the Exploration Manager for Mensin Gold Bibiani Ltd., a wholly owned subsidiary of Asante, and by Daniel Apau, a member of the Australasian Institute of Geoscientists, and the Exploration Manager for Chirano Gold Mines Limited, both of whom are “qualified persons” under NI 43-101.

 

About Asante Gold Corporation

 

Asante is a gold exploration, development and operating company with a high-quality portfolio of projects and mines in Ghana. Asante is currently operating the Bibiani and Chirano Gold Mines with combined forecast production of approximately 400,000 ounces of gold for 2023.  The Company continues with detailed technical studies at its Kubi Gold Project for early production. All mines and projects are located on the prolific Bibiani-Sefwi and Ashanti Gold Belts. Asante has an experienced and skilled team of mine finders, builders and operators, with extensive experience in Ghana.  Asante is listed on the Canadian Securities Exchange, the Ghana Stock Exchange and the Frankfurt Stock Exchange. Asante is also exploring its Keyhole, Fahiakoba and Betenase projects for new discoveries, all adjoining or along strike of major gold mines near the centre of Ghana’s Golden Triangle.

 

About the Bibiani Gold Mine

 

Bibiani is an operating open pit gold mining operation situated in the Western North Region of Ghana, with previous gold production of more than 4 million ounces.  It is fully permitted with available mining and processing infrastructure on-site, consisting of a newly refurbished 3 million tonne per annum process plant and existing mining infrastructure. Mining re-commenced in late February 2022 with the first gold pour announced on July 7, 2022.  Commercial production was announced November 10, 2022. For additional information relating to the mineral resource and mineral reserve estimates for the Bibiani Gold Mine, please refer to Asante’s press releases dated July 18, 2022 and September 1, 2022 and the technical report filed on its SEDAR profile (www.sedar.com) on September 1, 2022.

About the Chirano Gold Mine

 

Chirano is an operating open-pit and underground mining operation located in Western Region of Ghana, immediately south of the Company’s Bibiani Gold Mine.  Chirano was developed as a large scale mine by RedBack Mining from 1996 and began production in October 2005. The mine comprises the Akwaaba, Suraw, Akoti South, Akoti North, Akoti Extended, Paboase, Tano, Obra South, Obra, Sariehu and Mamnao open pits and the Akwaaba and Paboase underground mines. Gold Equivalent Production in 2021 was 154,668 oz on a 100% basis (source Kinross Gold Corporation).

 

Posted February 8, 2023

Share this news article

MORE or "UNCATEGORIZED"


Evergold Announces Closing of $1,242,000 Private Placement to Support First-Ever Drilling of High Potential DEM Porphyry Copper-Gold-Silver Prospect, BC

Evergold Corp. (TSX-V: EVER) (WKN: A2PTHZ) is pleased to announc... READ MORE

September 30, 2023

Lavras Gold closes upsized private placement

Lavras Gold Corp. (TSX-V: LGC) (OTCQB: LGCFF) has raised gross pr... READ MORE

September 30, 2023

First Phosphate Receives Letter of Interest in the Amount of up to US$170 Million from the Export-Import Bank of the United States (EXIM)

First Phosphate Corp. (CSE: PHOS) (OTC Pink: FRSPF) (FSE: KD0) is... READ MORE

September 30, 2023

New Pacific Metals Closes C$35 Million Bought Deal Financing

New Pacific Metals Corp. (TSX: NUAG) (NYSE American: NEWP) announ... READ MORE

September 30, 2023

Laramide intercepts broad-based uranium mineralization in initial holes from 2023 Australian exploration program

Laramide Resources Ltd. (TSX: LAM) (ASX: LAM) (OTCQX: LMRXF) is p... READ MORE

September 30, 2023

Copyright 2023 The Prospector News