The Prospector News

Artemis Gold Commences Processing of Ore at the Blackwater Mine (Video)

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Artemis Gold Commences Processing of Ore at the Blackwater Mine (Video)

Artemis Gold Inc. (TSX-V: ARTG) is pleased to announce that commissioning of the grinding circuit at the Blackwater Mine has advanced and the Company has commenced milling first ore this week. As announced in December 2024, the Company continues to target first gold pour during January 2025.

Video

Watch here for a short video about the progress at Blackwater Mine: https://youtu.be/fpl3Vjd9slM

About Artemis Gold

Artemis Gold is a well-financed, growth-oriented gold development company with a strong financial capacity aimed at creating shareholder value through the identification, acquisition, and development of gold properties in mining-friendly jurisdictions. The Company’s current focus is the construction of the Blackwater Mine in central British Columbia approximately 160km southwest of Prince George and 450km northeast of Vancouver. The project is one of the largest capital investments in central British Columbia in over a decade. The first pour of gold and silver at Blackwater is targeted during January 2025. Artemis Gold trades on the TSX-V under the symbol ARTG. For more information visit www.artemisgoldinc.com.

Posted January 22, 2025

Share this news article

MORE or "UNCATEGORIZED"


Freegold Intersects 3.63 g/t Au over 45.4m at Golden Summit

Freegold Ventures Limited (TSX: FVL) (OTCQX: FGOVF) pleased to announce the results from four add... READ MORE

November 5, 2025

West Point Gold Extends Gold Mineralization at NE Tyro; Drills 24.4 m of 1.63 g/t Au near surface; Commences Drilling at Tyro NE Deep

West Point Gold Corp. (TSX-V: WPG) (OTCQB: WPGCF) (FSE: LRA0) announces additional drill results fr... READ MORE

November 5, 2025

Alpha Announces New Drilling Results from Ongoing 2025 Exploration Program at the Aburna Gold Project

Alpha Exploration Ltd. (TSX-V: ALEX) is pleased to announce drilling results from the initial 2,105 ... READ MORE

November 5, 2025

NevGold Announces Up to 85% Antimony Recovery From Positive Phase II Metallurgical Testwork at Oxide Gold-Antimony Limo Butte Project in Nevada

NevGold Corp. (TSX-V:NAU) (OTCQX:NAUFF) (Frankfurt:5E50) is pleased to announce further positive an... READ MORE

November 5, 2025

Perseverance Metals Reports High Grade, >4% Nickel from Initial Drilling of the Venus East Ni-Cu-Co-PGE Trend, Lac Gayot Project, Québec

Perseverance Metals Inc. (TSX-V: PMI) is very pleased to provide initial assay results from the 202... READ MORE

November 5, 2025

Copyright 2025 The Prospector News