The Prospector News

Artemis Gold Commences Processing of Ore at the Blackwater Mine (Video)

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Artemis Gold Commences Processing of Ore at the Blackwater Mine (Video)

Artemis Gold Inc. (TSX-V: ARTG) is pleased to announce that commissioning of the grinding circuit at the Blackwater Mine has advanced and the Company has commenced milling first ore this week. As announced in December 2024, the Company continues to target first gold pour during January 2025.

Video

Watch here for a short video about the progress at Blackwater Mine: https://youtu.be/fpl3Vjd9slM

About Artemis Gold

Artemis Gold is a well-financed, growth-oriented gold development company with a strong financial capacity aimed at creating shareholder value through the identification, acquisition, and development of gold properties in mining-friendly jurisdictions. The Company’s current focus is the construction of the Blackwater Mine in central British Columbia approximately 160km southwest of Prince George and 450km northeast of Vancouver. The project is one of the largest capital investments in central British Columbia in over a decade. The first pour of gold and silver at Blackwater is targeted during January 2025. Artemis Gold trades on the TSX-V under the symbol ARTG. For more information visit www.artemisgoldinc.com.

Posted January 22, 2025

Share this news article

MORE or "UNCATEGORIZED"


Blue Jay Gold Corp. Announces Closing of Brokered Private Placement of Subscription Receipts for Proceeds of Approximately $14.7 Million

Blue Jay Gold Corp. is pleased to announce that it has closed its... READ MORE

April 8, 2026

Opus One Gold Corp Releases the First Assay Results from Its Winter Drilling Program on Noyell

Opus One Gold Corp (TSX-V: OOR) is pleased to announce the first... READ MORE

April 8, 2026

DPM Metals Announces First Quarter 2026 Preliminary Production Results; Ramp-up of Vareš Proceeding Well

DPM Metals Inc. (TSX: DPM) (ASX: DPM) (ARBN: 689370894) is please... READ MORE

April 8, 2026

Pecoy Copper Intersects 1,020.50 m of 0.43% Cu and 0.09 g/t Au from 48 m in Follow-Up Hole, a Second Consecutive Kilometre-Scale Intercept within South Breccia

Pecoy Copper Corp. (TSX-V: PCU) (FSE: D5E) (OTCQB: PCUUF) is plea... READ MORE

April 8, 2026

Rio Silver Inc. Reports: Initial Silver – Gold - Lead Recoveries of 85 %, 74 % and 77% Respectively From the Maria Norte in Central Peru

Initial Test Work Demonstrates Good Silver Recovery, High Grade C... READ MORE

April 8, 2026

Copyright 2026 The Prospector News