The Prospector News

Artemis Gold Commences Processing of Ore at the Blackwater Mine (Video)

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Artemis Gold Commences Processing of Ore at the Blackwater Mine (Video)

Artemis Gold Inc. (TSX-V: ARTG) is pleased to announce that commissioning of the grinding circuit at the Blackwater Mine has advanced and the Company has commenced milling first ore this week. As announced in December 2024, the Company continues to target first gold pour during January 2025.

Video

Watch here for a short video about the progress at Blackwater Mine: https://youtu.be/fpl3Vjd9slM

About Artemis Gold

Artemis Gold is a well-financed, growth-oriented gold development company with a strong financial capacity aimed at creating shareholder value through the identification, acquisition, and development of gold properties in mining-friendly jurisdictions. The Company’s current focus is the construction of the Blackwater Mine in central British Columbia approximately 160km southwest of Prince George and 450km northeast of Vancouver. The project is one of the largest capital investments in central British Columbia in over a decade. The first pour of gold and silver at Blackwater is targeted during January 2025. Artemis Gold trades on the TSX-V under the symbol ARTG. For more information visit www.artemisgoldinc.com.

Posted January 22, 2025

Share this news article

MORE or "UNCATEGORIZED"


Agnico Eagle Announces Disposition of its Interest in Orla Mining LTD.

Agnico Eagle Mines Limited (NYSE: AEM) (TSX: AEM) announced today that it sold 38,002,589 common s... READ MORE

September 9, 2025

Gladiator Metals Announces Closing of Upsized $22.5 Million Bought Deal Private Placement

Gladiator Metals Corp. (TSX-V: GLAD) (OTCQB: GDTRF) (FSE: ZX7) is pleased to announce that it has c... READ MORE

September 9, 2025

Vizsla Copper Expands Footprint of Strong Copper-Molybdenum Mineralization at The Thira Discovery; Drills 264 Meters of 0.43% Cueq In 400 Meter Step-Out Hole

Vizsla Copper Corp. (TSX-V: VCU) (OTCQB: VCUFF) (FRANKFURT: 97E0) is pleased to announce results fr... READ MORE

September 9, 2025

Sirios Receives $600,000 to Improve the Access Road to the Cheechoo Gold Project in Eeyou Istchee Baie-James

SIRIOS RESOURCES INC. (TSX-V: SOI) announces that the Government of Québec, through the Société ... READ MORE

September 9, 2025

Bravada Updates In-Pit Resource for Wind Mountain Project, Nevada

  Bravada Gold Corporation (TSX-V: BVA) (FSE: BRTN) reports an updated, independent In-pit Resour... READ MORE

September 9, 2025

Copyright 2025 The Prospector News