The Prospector News

Arizona Gold & Silver Announces Drill on Site to Test the Red Hills Bulk Tonnage Target on The Philadelphia Project, Arizona

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Arizona Gold & Silver Announces Drill on Site to Test the Red Hills Bulk Tonnage Target on The Philadelphia Project, Arizona

 

 

 

 

 

Vancouver, British Columbia, October 08, 2024 – Arizona Gold & Silver Inc.(TSX-V: AZS) (OTCQB:AZASF) is pleased to announce site preparation is nearing completion for diamond core drilling  on  the Red Hills bulk tonnage target on the Philadelphia Gold-Silver property. The target is the down dip extension to known mineralization and the western fringe of a CSAMT anomaly below a hydrothermally altered flow dome known as Red Hill.

Significant drill intercepts in holes PRC21-80 and PRC21-85 were 103.70 metres grading 1.57 grams per tonne (gpt) gold and 7.6 gpt silver, and 115.85 metres grading 1.34 gpt gold and 5.78 gpt silver, respectively.  The new core holes will be drilled from unpatented claims on BLM administered land where drilling permits were recently received. Additional holes are planned to further test this target both along strike and down dip to the east.

 

Greg Hahn, Vice President of Exploration, states “We are excited to be drilling our Red Hill target. The hydrothermally altered flow dome and the underlying CSAMT anomaly just to the east have considerable dimensions. That combined with +100 metre mineralized intercepts on the western side of the target area provide ample encouragement for this program. Success in this drilling will have a significant impact on the potential size of the Philadelphia epithermal gold-silver system”.

 

Drill holes are expected to take 10-20 days each to complete.  Drilling will proceed on a 20 days on and 10 days off schedule, operating one 10-hour shift per day. Upon the completion of each hole, core will be transported to the ALS Laboratories sample preparation facility in Tucson, Arizona, where core will be photographed, sawed and sampled according to explicit instructions from the project geologist. Samples will be crushed, split, and pulverized at the ALS facility in Tucson and representative pulps will be sent to the ALS analytical facility in Vancouver for gold fire assay and multi-element ICP analyses which include silver. Unsampled sawed splits of core will be returned to the Company for further geologic evaluation and storage.

 

 

Qualified Person

 

Gregory Hahn, VP-Exploration and a Certified Professional Geologist (#7122) is a Qualified Person under National Instrument 43-101 (“NI 43-101”) and has reviewed and approved the technical information contained in this news release.

 

About Arizona Gold & Silver Inc.

 

Arizona Gold & Silver Inc. is a leading exploration company focused on uncovering precious metal resources in Arizona and Nevada. With a commitment to sustainable practices and innovative exploration techniques, the company aims to drive value for stakeholders while prioritizing environmental stewardship. The flagship asset is the Philadelphia gold-silver property where the Company is drilling off an epithermal gold-silver system ahead of an initial resource calculation.

 

Posted October 8, 2024

Share this news article

MORE or "UNCATEGORIZED"


Hudbay Provides Annual Reserve and Resource Update with Mine Life Extensions and Improved Three-Year Production Outlook

Hudbay Minerals Inc. (TSX:HBM) (NYSE: HBM) today released its ann... READ MORE

March 27, 2026

OREZONE GOLD COMPLETES STRATEGIC ACQUISITION OF CASA BERARDI GOLD MINE AND QUEBEC EXPLORATION PORTFOLIO AND REPORTS FOURTH QUARTER 2025 RESULTS

Strategic acquisition of an established operating gold mine, loca... READ MORE

March 27, 2026

Cerro de Pasco Resources Secures Access Agreement Over Entire Quiulacocha Tailings Area, Enabling Next Phase of Project Development

Cerro de Pasco Resources Inc. (TSX-V: CDPR) (OTCQB: GPPRF) (FRA: ... READ MORE

March 26, 2026

SAGA Metals Acquires Strategic Titanium Assets from Rio Tinto in Quebec

The Garneau Titanium Project Features Ilmenite-Rich Boulder with ... READ MORE

March 26, 2026

ValOre Reports Positive Leaching Results from Ongoing Metallurgical Program for Pedra Branca PGM Project, Brazil; 73% Platinum and 74% Palladium Achieved Extraction from Weathered Material and 66% Platinum and 79% Palladium from Chromitite;

ValOre Metals Corp. (TSX‐V: VO) (OTCQB: KVLQF) (Frankfurt: KEQ0... READ MORE

March 26, 2026

Copyright 2026 The Prospector News