The Prospector News

Arizona Gold Drills 11.8 m of 8.8 g/t Gold Including 53.5 g/t

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Arizona Gold Drills 11.8 m of 8.8 g/t Gold Including 53.5 g/t

 

 

 

 

 

Arizona Gold Corp. (TSX: AZG) (OTCQB: AGAUF) is pleased to announce additional underground drilling results at its 100% owned Copperstone gold project located in Arizona, United States.

 

Michael R. Smith, Technical Advisor, stated: “We are pleased to announce drill results from our current in-fill delineation core drilling program. The holes were drilled from underground to support and guide follow up reverse circulation drilling on close-spaced centers, which will lead to final stope mine planning. The drill hole intervals realized with the core drilling encountered mineralization where modelled, while continuing to add further confidence in the current resource model.”

 

Drilling Highlights Include:

 

Drill Hole AZG-21-P3B-04C

  • 11.8 m at 8.8 g/t Au, including 1.1 m at 53.5 g/t Au

Drill Hole AZG-21-P2B-02C

  • 3.3 m at 11.4 g/t Au, including 1.1 m at 17.9 g/t Au

Drill Hole AZG-21-P2G-07C

  • 3.2 m at 11.3 g/t Au, including 1.7 m at 20.3 g/t Au

 

2021 Drilling Program

 

The underground core hole in-fill delineation drilling of previously planned stopes has advanced with three holes in Stope 3 (north end of C Zone) and six in Stope 2 (north end of D Zone). It is planned to do limited in-fill core drilling in planned stopes, to support and guide follow up reverse circulation drilling on close-spaced centers. Mineralization was intersected in the holes about where modelled, increasing confidence in the resource model.

 

The following provides additional information for each of the drill holes reported in Table 1 below with further assays pending:

 

  Drill Hole AZG-21-P3B-04C is an down angle in-fill hole drilled northeasterly into Stope 3 and intersected mineralization where modelled.
   
  Drill Hole AZG-21-P2B-02C is an down angle in-fill hole drilled southwesterly into Stope 2 and intersected mineralization where modelled.
   
  Drill Hole AZG-21-P2C-03C is an down angle in-fill hole drilled southwesterly into Stope 2 and intersected mineralization where modelled.
   
  Drill Hole AZG-21-P2G-07C is an down angle in-fill hole drilled southwesterly into Stope 23 and intersected mineralization where modelled.

 

 

Table 1: Underground Core Drilling

 

          True
  From To Length Gold (1) Thickness (2)
Hole ID meter meter meter gram/tonne meter
AZG-21-P3B-04C 12.6 24.4 11.8 8.8 8.3
including 13.4 15.2 1.8 40.4 1.1
and 14.1 15.2 1.1 53.5 0.5
AZG-21-P2B-02C 11.9 15.2 3.3 11.4 3.0
including 11.9 13.0 1.1 17.9 1.0
and 13.7 14.5 0.8 17.3 0.7
AZG-21-P2C-03C 17.2 22.6 5.4 8.9 3.9
including 18.0 20.3 2.3 17.3 1.7
and 18.0 18.7 0.7 39.5 0.6
AZG-21-P2G-07C 4.6 7.8 3.2 11.3 3.1
including 5.3 7.0 1.7 20.3 1.6

(1) Au grades herein are reported as uncapped values.
(2) Estimated perpendicular distance between footwall and hanging wall of the mineralized interval.

 

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in NI 43-101 and reviewed and approved by Michael R. Smith, SME Registered Member (Geology), who is a “Qualified Person” as defined by NI 43-101 for this project.

 

Quality Assurance and Quality Control Statement

Procedures have been implemented to assure Quality Assurance Quality Control (QAQC) of drill hole assaying being done at an ISO Accredited assay laboratory.  Drill hole samples to be assayed are securely stored for shipment, with chain of custody documentation through delivery.  Mineralized commercial reference standards or blank standards are inserted approximately every 20th sample in sequence and results are assessed to ascertain acceptable limits for analytical variance. Duplicate samples will also be taken as a further check in lab precision and accuracy. All results will be analyzed for consistency and corrective actions taken, if needed.

 

About Arizona Gold Corp.

 

Arizona Gold is an emerging American gold producer advancing the restart of production at its 100-per-cent-owned, fully permitted, past-producing Copperstone mine project, located in mining-friendly Arizona. The Copperstone mine project demonstrates significant upside exploration potential that has yet to be drilled within a 50 square-kilometre land package that includes past production of over 500,000 ounces of gold by way of an open-pit operation.

 

The company’s current focus is on maximizing Copperstone’s potential by defining and expanding current resources and further optimizing the mine’s economics for purposes of the restart of gold production in the near term as a result of the recent project funding transaction with Star Royalties Ltd.

 

Posted June 1, 2021

Share this news article

MORE or "UNCATEGORIZED"


New Found to Acquire Labrador Gold’s Kingsway Project

New Found Gold Corp. (TSX-V: NFG, NYSE-A: NFGC) is pleased to an... READ MORE

April 22, 2024

AbraSilver Announces C$20 Million in Strategic Investments by Kinross Gold and Central Puerto and Formation of a Regional Partnership in Argentina

AbraSilver Resource Corp. (TSX-V: ABRA) (OTCQX: ABBRF) is pleased... READ MORE

April 22, 2024

Ascot Pours First Gold During Commissioning at the Premier Gold Project

Ascot Resources Ltd. (TSX: AOT; OTCQX: AOTVF) is pleased to annou... READ MORE

April 22, 2024

G Mining Ventures and Reunion Gold Announce Combination to Set the Stage for a Leading Intermediate Gold Producer in the Americas

Sets the stage for the creation of a leading intermediate gold pr... READ MORE

April 22, 2024

GOLD ROYALTY ANNOUNCES RECORD TOTAL REVENUE, LAND AGREEMENT PROCEEDS AND INTEREST AND GEOS

Gold Royalty Corp. (NYSE American: GROY) is pleased to announce ... READ MORE

April 22, 2024

Copyright 2024 The Prospector News