The Prospector News

ARIS MINING REPORTS Q1 2025 GOLD PRODUCTION ACHIEVING 8% YEAR-OVER-YEAR GROWTH

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

ARIS MINING REPORTS Q1 2025 GOLD PRODUCTION ACHIEVING 8% YEAR-OVER-YEAR GROWTH

 

 

 

 

 

Aris Mining Corporation (TSX: ARIS) (NYSE-A: ARMN) reports gold production of 54,763 ounces for the first quarter of 2025 (Q1 2025), with 47,549 oz from Segovia and 7,214 oz from the Marmato Upper Mine.

 

Q1 2025 Gold Production Highlights:

  • Positive trends across both the Segovia and Marmato operations, with a total gold production of 54,763 oz in Q1 2025, up 8% compared to 50,767 oz in Q1 2024.
  • Q1 2025 production reflects strong operational momentum heading into 2025. With the commissioning of the expanded Segovia processing facility on track for Q2 2025, additional production growth is anticipated in the coming quarters.
  • Aris Mining’s 2025 full-year production guidance is between 230,000 to 275,000 oz, with Segovia expected to produce 210,000 to 250,000 oz and the Marmato Upper Mine expected to contribute 20,000 to 25,000 oz.
 

*The Q1 2025 results provided in this news release are approximate and may differ from the final results to be included in the Company’s 2025 interim financial statements and MD&A, which the Company expects to release in early May 2025.

 

Neil Woodyer, CEO of Aris Mining, commented “We kicked off 2025 with strong momentum, highlighting our ability to effectively execute while advancing major growth initiatives. Q1 production came in slightly ahead of our budget target reflecting a solid operational start to the year. With the expanded Segovia processing facility set to be commissioned this quarter, we are well on track to deliver on our full-year production guidance of 230,000 to 275,000 oz.”

 

Chart 2: Segovia Operations – Quarterly Production Data

 

Operating Information Q1 2025 Q1 2024 Q2 2024 Q3 2024 Q4 2024 FY 2024
Tonnes processed (kt) 167 154 156 167 168 645
Tonnes per day (tpd) 1,966 1,817 1,834 1,940 1,949 1,885
Average gold grade processed (g/t) 9.37 9.42 9.14 9.23 9.84 9.41
Recoveries (%) 96.1 % 95.6 % 96.0 % 95.9 % 96.6 % 96.0 %
Gold produced (ounces) 47,549 44,908 43,705 47,493 51,477 187,583
Gold sold (ounces) 47,390 45,288 43,366 48,059 50,409 187,122

Chart 3: Marmato Upper Mine – Quarterly Production Data

Operating Information Q1 2025 Q1 2024 Q2 2024 Q3 2024 Q4 2024 FY 2024
Tonnes processed (kt) 74 62 61 70 60 254
Average gold grade processed (g/t) 3.32 3.27 3.18 3.06 3.61 3.28
Recoveries (%) 91.7 % 90.2 % 89.2 % 89.4 % 90.7 % 89.9 %
Gold produced (ounces) 7,214 5,859 5,511 6,115 5,887 23,372
Gold sold (ounces) 6,891 5,756 6,103 5,710 5,925 23,494
*The Q1 2025 results provided in this news release are approximate and may differ from the final results to be included in the Company’s 2025 interim financial statements and MD&A, which the Company expects to release in early May 2025.

 

About Aris Mining

 

Founded in September 2022, Aris Mining was established with a vision to build a leading Latin America-focused gold mining company. Our strategy blends current production and cashflow generation with transformational growth driven by expansions of our operating assets, exploration and development projects. Aris Mining is listed on the TSX (ARIS) and the NYSE-A (ARMN) and is led by an experienced team with a track record of value creation, operational excellence, financial discipline and good corporate governance in the gold mining industry.

 

Aris Mining operates two underground gold mines in Colombia: the Segovia Operations and the Marmato Upper Mine, which together produced 210,955 ounces of gold in 2024. With expansions underway, Aris Mining is targeting an annual production rate of more than 500,000 ounces of gold following the ramp-up of the Segovia mill expansion, expected during the second half of 2025, and the new Marmato Lower Mine, which is expected to start ramping up production in the second half of 2026. In addition, Aris Mining operates the 51% owned Soto Norte joint venture, where studies are underway on a new, smaller scale development plan, with results expected in mid-2025. In Guyana, Aris Mining owns the Toroparu gold/copper project, further diversifying its asset portfolio.

 

Colombia is rich in high-grade gold deposits and Aris Mining is actively pursuing partnerships with the Country’s dynamic small-scale mining sector. With these partnerships, we enable safe, legal, and environmentally responsible operations that benefit both local communities and the industry.

 

Aris Mining intends to pursue acquisitions and other growth opportunities to unlock value through scale and diversification.

 

 


Chart 1: Q1 2025 Gold Production (oz) Year-over-Year (CNW Group/Aris Mining Corporation)

 

Posted April 9, 2025

Share this news article

MORE or "UNCATEGORIZED"


Equinox Gold and Orla Mining Combine to Create North America’s New Senior Gold Producer: Built to Grow, Built to Last

Combined company expected to produce 1.1 million ounces of gold a... READ MORE

May 13, 2026

Viva Gold Reports Additional Shallow, High-Grade Hits at the Tonopah Gold Project in Nevada

  Viva Gold Corp (TSX-V: VAU) (OTCQB: VAUCF) is pleased t... READ MORE

May 13, 2026

Panoro Minerals Ltd. Announces Closing of Upsized Brokered LIFE Offering for Gross Proceeds of C$21,000,000

Panoro Minerals Ltd. (TSX-V:PML) (BVL: PML) (FSE: PZM) (OTCQB: PO... READ MORE

May 13, 2026

Gold X2 Intersects 60.7m of 1.51 g/t Au from 47.0m at QES as Part of the Moss Gold Project Infill Drilling Program

Gold X2 Mining Inc. (TSX-V: AUXX) (OTCQB: GSHRF) (FWB: DF... READ MORE

May 13, 2026

Scorpio Gold Drills 11.84 g/t Gold over 8.39 Metres, Including 40.15 g/t Gold over 0.88 Metres, from 106.21 Metres at Goldwedge

Hole 26MN-075 returned: 11.84 g/t gold over 8.39 metres (“m... READ MORE

May 13, 2026

Copyright 2026 The Prospector News