The Prospector News

Argonaut Gold Completes C$10,000,000 Non-Brokered Private Placement with Ausenco and Provides Magino Project Construction Update

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Argonaut Gold Completes C$10,000,000 Non-Brokered Private Placement with Ausenco and Provides Magino Project Construction Update

 

 

 

 

 

Argonaut Gold Inc. (TSX: AR) is pleased to announce it has completed a private placement of 4,255,319 common shares, issued at a price of C$2.35 per common share, representing an 8.3% premium to the closing price on March 30, 2021, for gross proceeds of C$10,000,000 with Ausenco Engineering Canada Inc. Argonaut Gold and Ausenco previously executed a fixed-bid engineering, procurement, construction and commission contract for the construction of the Magino processing facility and other parts of the Magino construction project (see press release dated January 4, 2021) at which time a private placement was contemplated.  The Company intends to use the proceeds for Magino construction activities and general corporate purposes.

 

Pete Dougherty, President and CEO of Argonaut stated: “The private placement by Ausenco aligns our respective companies, as we work together to advance and unlock value of the Magino project.  We are very pleased to have a partner with ‘skin in the game’ as we continue to advance Magino’s construction.”

 

Zimi Meka, CEO and Managing Director of Ausenco commented: “With our intimate knowledge of the Magino project, we are excited to partner with Argonaut in building Canada’s next gold mine.  We are pleased to be a shareholder of Argonaut and look forward to working with Peter and his team to maximise the value of Magino for all shareholders.”

 

Magino Project Construction Update

 

Argonaut is also pleased to provide a construction update at its Magino project in Ontario, Canada.  The overall Magino construction project is tracking on schedule and ahead of schedule in relation to logging activities. The Company has secured all long lead items and is actively preparing the site for earthworks, which are expected to commence during the second quarter 2021.

 

Argonaut is very pleased to report that 100% of the process plant site has been cleared, which allows for earthworks to begin in this area.  Earthworks in the process plant site area will be followed by concrete pouring and steel erection so that the Company is in a position to enclose the process facility building prior to next winter, allowing construction to continue on the recovery plant.

 

Magino project activities since commencing construction include:

 

  • Logging;
  • Pioneering of roads and worksites;
  • Earthworks to level the area of the process facility site for preparation of concrete pouring for the foundation;
  • Installed construction offices;
  • Completed the pad for a 144 person camp;
  • Installation of the first 88 person camp units; and
  • Placed orders of long lead time equipment.

 

About Argonaut Gold

 

Argonaut Gold is a Canadian gold company engaged in exploration, mine development and production.  Its primary assets are the El Castillo mine and San Agustin mine, which together form the El Castillo Complex in Durango, Mexico, the La Colorada mine in Sonora, Mexico and the Florida Canyon mine in Nevada, USA.  The Company also holds the construction stage Magino project, the advanced exploration stage Cerro del Gallo project and several other exploration stage projects, all of which are located in North America.

 

 

Posted March 31, 2021

Share this news article

MORE or "UNCATEGORIZED"


Silver Mountain Announces Closing of Prospectus Offering

Silver Mountain Resources Inc. (TSX-V: AGMR) (OTCQB: AGMRF) is ... READ MORE

April 24, 2024

Mandalay Extends the Storheden Gold Deposit Adjacent to the Operating Björkdal Mine

Mandalay Resources Corporation (TSX: MND) (OTCQB: MNDJF) announce... READ MORE

April 24, 2024

Collective Mining Intercepts 632.25 Metres at 1.10 g/t Gold Equivalent in a 200 Metre Step-Out Hole to the South at Trap

Collective Mining Ltd. (TSX: CNL) (OTCQX: CNLMF) (FSE: GG1) is pl... READ MORE

April 24, 2024

Koryx Copper Intersects 207 Meters at 0.49% and 116 Meters at 0.54% Copper Equivalent

Significant copper and molybdenum intersections include: HM19: 11... READ MORE

April 24, 2024

Red Pine Intercepts Significant Mineralization at the Wawa Gold Project, including 5.34 g/t over 13.39 metres including 16.50 g/t gold over 0.97 metre and 13.62 g/t gold over 2.13 metres

Red Pine Exploration Inc. (TSX-V: RPX) (OTCQB: RDEXF) is pleased ... READ MORE

April 24, 2024

Copyright 2024 The Prospector News