Alaska Silver Corp. (TSX-V: WAM) (Frankfurt: MK17) (OTCQX: WAMFF) is pleased to report the voting results from the Company’s annual and special general meeting of shareholders held on June 19, 2026. A total of 26,946,579 common shares were represented at the Meeting, representing 30.36% of the issued and outstanding common shares of the Company on the record date for the Meeting.
All matters presented for approval at the Meeting were duly authorized and approved, as follows:
| Number of Votes | % of Votes | |
| Votes For: | 26,881,474 | 99.766% |
| Votes Against: | 63,105 | 0.234% |
| Name of Director | Votes For | % For | Votes Withheld | % Withheld |
| Christopher Marrs | 25,658,403 | 95.227% | 1,286,176 | 4.773% |
| Nathan Brewer | 24,516,340 | 90.988% | 2,428,239 | 9.012% |
| David Smallhouse | 24,507,340 | 90.955% | 2,437,239 | 9.045% |
| Kevin Nishi | 24,507,340 | 90.955% | 2,437,239 | 9.045% |
| Susan Mitchell | 25,728,736 | 95.488% | 1,215,843 | 4.512% |
| Aaron Schutt | 25,707,253 | 95.408% | 1,237,326 | 4.592% |
| Number of Votes | % of Votes | |
| Votes For: | 26,896,549 | 99.822% |
| Votes Withheld: | 48,030 | 0.178% |
| Number of Votes | % of Votes | |
| Votes For: | 25,655,086 | 95.214% |
| Votes Against: | 1,289,493 | 4.786% |
| Number of Votes | % of Votes | |
| Votes For: | 14,201,471 | 98.983% |
| Votes Against: | 145,945 | 1.017% |
“The results of this year’s shareholder meeting demonstrate strong support for Alaska Silver’s vision and growth strategy,” said Kit Marrs, President and CEO of Alaska Silver. “As we advance one of the largest silver-focused exploration programs in the Company’s history, we remain focused on expanding our resource base, unlocking the broader district-scale potential of Illinois Creek, and building a premier Alaska-based silver company.”
Alaska Silver’s 2026 6,000-metre exploration program is off to a strong start, with just over 1,000 metres completed to date and drilling productivity meeting or exceeding planned targets at both the Silver Sage and Waterpump Creek targets. The program commenced on June 10 at Silver Sage, with a second drill rig beginning operations at Waterpump Creek North on June 14, accelerating the evaluation of multiple high-priority targets across the Illinois Creek district.
At Waterpump Creek North, drill holes WPC26-0038 and WPC26-0039, located approximately 200 metres north of the existing Waterpump Creek resource, have been completed, and drilling has commenced on WPC26-0040. These holes are testing a highly prospective area with the potential to significantly expand the known mineralized footprint of the district.
At Silver Sage, drill hole SS26-10 has been completed to target depth, while drilling is currently underway on SS26-11. Silver Sage is one of several priority targets being evaluated for its potential to add high-grade silver mineralization within trucking distance of the proposed Illinois Creek processing hub.
With drilling progressing efficiently and multiple targets being tested, management is encouraged by the pace of the program and looks forward to providing investors with a steady stream of assay results as they become available.
Alaska Silver is a junior exploration company focused on the discovery and development of high-grade silver, gold and critical metals assets within one of North America’s major high-grade silver and critical minerals districts at their Illinois Creek (IC) Project in western Alaska. Illinois Creek is a contiguous, 100%-owned land package totaling 80,895 acres (126.4 square miles or 32,337 hectares) anchored by two resource-level mineralization zones separated by 8 km of high potential exploration ground. At one end lies the high-grade silver mineralization at the Waterpump Creek zone, which hosts an Inferred Mineral Resource of 75 Moz AgEq at a grade of 279 g/t silver, 11.28 % zinc and 9.87% lead1,2, that remains open to the north and south, as well as by the Illinois Creek mine. At the western end is the historical past-producing Illinois Creek Mine that closed due to low metal prices leaving untouched Indicated Mineral Resources of 260,000 oz gold at 0.92 g/t Au and 8.3 Moz silver at 29.72 g/t Ag, along with Inferred Mineral Resources of 290,000 oz gold at 0.84 g/t Au and 10.4 Moz silver at 30.11 g/t Ag2,3. The IC Project is located approximately 38 kilometers from the Yukon River, the region’s primary marine transportation corridor. Headquartered in Alaska and Arizona, Alaska Silver is led by a team with a proven track record of large-scale mine discoveries.
1For Waterpump Creek, the formulas for AgEq are AgEq (g/t)= Ag (g/t) + 28.56 x Pb(%) + 37.12 x Zn(%) and assume metal prices of US$24/oz Ag, US$1.30/lb Zn, and US$ 1.00/lb Pb.
2Please refer to the NI 43-101 Technical Report titled “Illinois Creek Project, Western Alaska, USA” dated February 25, 2026 (effective date of January 22, 2026).
3For Illinois Creek, AuEq values are based only on gold and silver values using metal prices of US$3,500/oz Au and US$45/oz Ag.
Patrick Donnelly P.Geo, a Qualified Person under National Instrument 43-101, has reviewed and approved the scientific and technical information in this news release.
On behalf of the Company
“Kit Marrs”
Kit Marrs
President & CEO
kit@alaskasilver.com
Phone: 1-520-200-1667
For further information, please contact:
Patrick Donnelly
Executive Vice President
pat@alaskasilver.com
Or visit our website at: www.alaskasilver.com
Discover the story behind First Canadian Graphite (TSX-V:FCI) (OTCQB:GRAPF) in this on-location inte... READ MORE
In this presentation, Jeffrey Christian of CPM Group gives a precious metals update, covering... READ MORE
The One Word That Could Shake Markets Harder Than Bad News | https://www.themorganreport.com This we... READ MORE
During THE Mining Investment Event in Quebec City, Dryden Gold CEO & Director Trey Wasser presen... READ MORE
Good morning, Last week’s SMC generated a lot of positive responses. I am talking about the Claude... READ MORE