African Gold Group, Inc. (TSX-V: AGG) is pleased to report the highest grade intersection to date at its Kobada Gold Project (Figure 1).
Highlights Include (Table 1):
Building on the successful Phase 1 campaign, the first results from Phase 2, returned significant intersections, extending the mineralization to the north and south. Phase 2 is currently approximately 80% complete and is progressing northwards (Figure 3) from the central zone and aims to expand the overall mineral resource at the Kobada Gold Project.
“We are extremely happy with these high-grade intersections in the immediate northern and southern extensions of our highly prolific Kobada Shear Zone,” says Dr. Andreas Rompel, Vice President Exploration. “Furthermore, it confirms the mineralization in the shear zones beyond what was previously known, which gives rise to expectations to a much larger mineralized shear zone system on our concessions.”
The outstanding results to date confirm management’s belief that the resource at the Kobada Gold Project is larger and of greater thicknesses than suggested in the 2016 Feasibility Study, and clearly highlights the strong upside potential given the results are materially above the current resource grade.
The Phase 2 drilling campaign is progressing towards the north and aims to extend the resource northward. Continuing mineralization to the north of central zone further supports our view that the Kobada Gold Project is larger than previously suggested.
The Company initially planned to issue an updated mineral resource statement based on the Phase 1 drilling program in early February, with the subsequent update based on the Phase 2 drilling results. Due to the quick turn-around time from the assay labs in Bamako, Mali and accelerated drilling schedule by our drilling contractor AMCO, the Company decided to issue an updated mineral resource statement based on results from both our Phase 1 and Phase 2 drilling program. With the Phase 2 drilling program approximately 80% complete, management anticipates issuing an updated mineral resource statement in approximately five to six weeks.
Table 1: Highlights
Mineralized Zone | Includes | ||||||||
BHID | Ore Body | From | To | Composite Length (m) |
Composite Grade (g/t) |
From | To | Includes (m) |
Includes (g/t) |
KB19_P2_02 | Main Shear South | 1.00 | 13.50 | 12.50 | 0.82 | 12.00 | 13.50 | 1.50 | 4.15 |
KB19_P2_04 | Main Shear South | 117.00 | 138.00 | 21.00 | 6.14 | 135.00 | 136.00 | 1.00 | 124.85 |
KB19_P2_06 | Main Shear South | 68.00 | 70.00 | 2.00 | 2.49 | ||||
88.60 | 91.10 | 2.50 | 3.98 | ||||||
93.50 | 96.00 | 2.50 | 1.63 | ||||||
103.40 | 106.00 | 2.60 | 1.89 |
Figure 1: Kobada exploration targets is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/00fbeb3a-42a8-412e-af8d-5d9aabf63a74
Figure 2: Section showing the drill hole KB19_P2_04 (blue) intersecting the mineralized Kobada Shear Zone (orange and red) is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/410666a0-860e-44e8-92b9-06fb6c2d7aa9
Figure 3: Drill hole locations and section lines in the central part of the Kobada Main Shear Zone is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/19f90708-8502-4a99-ae32-3a420f6ef794
Qualified Persons
The scientific and technical information contained in this press release has been reviewed, prepared and approved by Dr. Andreas Rompel, PhD, Pr. Sci. Nat. (400274/04), FSAIMM, Vice President Exploration of AGG, who is a “Qualified Person” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects and by Mr. Uwe Engelmann (BSc (Zoo. & Bot.), BSc Hons (Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the South African Council for Natural Scientific Professions.
About African Gold Group
African Gold Group is a Canadian listed exploration and development company on the TSX Venture Exchange with its focus on developing a gold platform in West Africa. Its principal asset is the Kobada Project in southern Mali.
Table 2: Assay results from the main mineralized zone (reported length measured along the holes)
Mineralized Zone | Includes | ||||||||
BHID | Ore Body | From | To | Composite Length (m) |
Composite Grade (g/t) |
From | To | Includes (m) |
Includes (g/t) |
KB19_P2_02 | Main Shear South | 1.00 | 13.50 | 12.50 | 0.82 | 12.00 | 13.50 | 1.50 | 4.15 |
24.70 | 34.00 | 9.30 | 0.18 | ||||||
KB19_P2_01 | Main Shear South | 4.50 | 65.00 | 60.50 | 0.40 | 20.50 | 21.50 | 1.00 | 3.28 |
30.50 | 33.00 | 2.50 | 1.09 | ||||||
40.00 | 42.00 | 2.00 | 1.69 | ||||||
48.00 | 49.00 | 1.00 | 1.71 | ||||||
57.00 | 59.00 | 2.00 | 1.22 | ||||||
KB19_P2_05 | Main Shear South | 0.00 | 5.90 | 5.90 | 0.16 | ||||
48.00 | 50.00 | 2.00 | 0.20 | ||||||
98.00 | 100.30 | 2.30 | 1.33 | 98.00 | 99.20 | 1.20 | 2.40 | ||
KB19_P2_04 | Main Shear South | 5.00 | 17.00 | 12.00 | 0.43 | 13.00 | 14.00 | 1.00 | 3.00 |
21.00 | 23.00 | 2.00 | 0.27 | ||||||
56.00 | 57.00 | 1.00 | 0.64 | ||||||
84.00 | 97.00 | 13.00 | 0.46 | 84.00 | 85.00 | 1.00 | 3.37 | ||
88.00 | 89.00 | 1.00 | 1.18 | ||||||
117.00 | 138.00 | 21.00 | 6.14 | 135.00 | 136.00 | 1.00 | 124.85 | ||
136.00 | 137.00 | 1.00 | 1.24 | ||||||
143.00 | 147.00 | 4.00 | 0.17 | ||||||
158.00 | 160.00 | 2.00 | 0.30 | ||||||
KB19_P2_06 | Main Shear South | 32.30 | 34.00 | 1.70 | 0.56 | ||||
42.40 | 44.20 | 1.80 | 0.95 | ||||||
50.50 | 124.50 | 74.00 | 0.63 | 62.40 | 63.30 | 0.90 | 1.19 | ||
68.00 | 70.00 | 2.00 | 2.49 | ||||||
88.60 | 91.10 | 2.50 | 3.98 | ||||||
93.50 | 96.00 | 2.50 | 1.63 | ||||||
97.00 | 99.00 | 2.00 | 1.31 | ||||||
101.00 | 102.40 | 1.40 | 1.01 | ||||||
103.40 | 106.00 | 2.60 | 1.89 | ||||||
140.30 | 141.50 | 1.20 | 0.81 | ||||||
164.00 | 166.20 | 2.20 | 0.37 | ||||||
172.20 | 179.80 | 7.60 | 0.26 | ||||||
187.80 | 207.00 | 19.20 | 0.12 |
Cumulative Mineralization Widths
BHID | Cumulative Mineralization Width (m) |
Mean Grade (g/t) |
KB19_P2_02 | 21.80 | 0.55 |
KB19_P2_01 | 60.50 | 0.40 |
KB19_P2_05 | 10.20 | 0.43 |
KB19_P2_04 | 55.00 | 2.59 |
KB19_P2_06 | 107.70 | 0.51 |
Significant Intersections (Above 1 g/t)
BHID | From | To | Intersection Length (m) |
Au Grade (g/t) |
KB19_P2_02 | 12.00 | 13.50 | 1.50 | 4.15 |
KB19_P2_01 | 20.50 | 21.50 | 1.00 | 3.28 |
30.50 | 33.00 | 2.50 | 1.09 | |
40.00 | 42.00 | 2.00 | 1.69 | |
48.00 | 49.00 | 1.00 | 1.71 | |
57.00 | 59.00 | 2.00 | 1.22 | |
KB19_P2_05 | 98.00 | 99.20 | 1.20 | 2.40 |
KB19_P2_04 | 13.00 | 14.00 | 1.00 | 3.00 |
84.00 | 85.00 | 1.00 | 3.37 | |
88.00 | 89.00 | 1.00 | 1.18 | |
135.00 | 136.00 | 1.00 | 124.85 | |
136.00 | 137.00 | 1.00 | 1.24 | |
KB19_P2_06 | 62.40 | 63.30 | 0.90 | 1.19 |
68.00 | 70.00 | 2.00 | 2.49 | |
88.60 | 91.10 | 2.50 | 3.98 | |
93.50 | 96.00 | 2.50 | 1.63 | |
97.00 | 99.00 | 2.00 | 1.31 | |
101.00 | 102.40 | 1.40 | 1.01 | |
103.40 | 106.00 | 2.60 | 1.89 |
Vizsla Silver Corp. (TSX-V: VZLA) (NYSE: VZLA) (Frankfurt: 0G3) i... READ MORE
Reunion Gold Corporation (TSX-V: RGD) (OTCQX: RGDFF) is pleased t... READ MORE
STLLR Gold Inc. (TSX: STLR) (OTCQX: STLRF) (FSE: O9D) announces ... READ MORE
Consolidated copper production is expected to average 153,000i to... READ MORE
Aya Gold & Silver Inc. (TSX: AYA) (OTCQX: AYASF) is pleased t... READ MORE