The Prospector News

Additional High Grade Antimony Results on the Bald Hill Property under Option from Globex

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Additional High Grade Antimony Results on the Bald Hill Property under Option from Globex

 

 

 

 

 

GLOBEX MINING ENTERPRISES INC. (TSX:GMX)  (FRA: G1MN)  (OTCQX:GLBXF) is pleased to inform shareholders that Antimony Resources Corp. (CSE:ATMY) (FRA: K8JO) have reported the final drill results from their 2025 drill campaign on the Bald Hill Antimony property under option form Globex (click to access press release dated January 22,2025 announcing the option).

 

“The 2025 drill programs completed a total of 8150 meters in 34 drill holes. High-grade antimony-bearing stibnite was intersected in between 75% and 80% of the drill holes with high-grade values including 4.4% Sb over 8.6 m (metres), 11.74 % Sb over 1.65 m, and 8.48 % Sb over 3.0 m. The overall average grade of mineralization appears to be in the order of 4% to 5% Sb.”

 

“Highlights from latest drilling are the following:

  • High-grade antimony-bearing stibnite (Sb) mineralization continues to be intersected in the drilling completed in the fall of 2025.
  • Multiple zones of antimony-bearing stibnite (Sb) mineralization were encountered in five of the six holes reported.
  • Drill Hole BH-25-22 has 6 individual zones of antimony mineralization.
  • High-grades and wide intersections are seen; up to 2.07% Sb over 27.05 meters and 2.75% Sb over 18.35 meters.
  • High-grade values include 4.4% Sb over 8.6 meters (m), 11.74 %Sb over 1.65 m, and 8.48 % Sb over 3.0 m. The overall average grade of mineralization appears to be in the order of 4% to 5% Sb.
  • Highest values of the grade times thickness to date (% Sb*m) = 55.99 and 50.46
  • The mineralization appears to be averaging greater than 4.5 meters in thickness.

 

The thickness reported in the following table are drill intersected thicknesses. The true thickness of mineralization is calculated to be approximately 75% of the intersected thickness.”

 

Drill intersection details are as follows:

 

Summary BH-25-17 to BH-25-22
BH-25-17 From
(m)
To (m) Length
(m)
Assay
(%Sb)
%Sb*m
Intersections 104.00 131.05 27.05 2.07 55.99
including 104.00 112.60 8.60 4.40 37.84
and 117.30 124.75 7.45 1.40 10.43
and 127.00 131.05 4.05 0.52 2.11
BH-25-18          
Intersections 110.00 120.65 10.65 3.75 39.94
and 184.30 189.89 5.59 5.90 32.98
and 203.00 205.35 2.35 5.25 12.34
BH-25-19          
Intersections 186.25 204.60 18.35 2.75 50.46
including 186.25 191.40 5.15 5.98 30.80
and 199.60 204.60 5.00 3.52 17.60
and 209.45 212.70 3.25 2.01 6.52
BH-25-20          
Hole Abandoned short of target
BH-25-21          
Intersections 259.30 263.95 4.65 0.54 2.51
BH-25-22          
Intersections 107.30 113.30 6.00 3.42 20.52
Including 107.30 110.30 3.00 8.48 25.44
and 119.70 124.60 4.90 0.55 2.70
and 163.75 169.60 5.85 3.63 21.24
Including 164.85 166.50 1.65 11.74 19.37
and 169.60 173.35 3.75 0.44 1.65
and 181.90 183.75 1.85 3.81 7.05
           

Shareholders can access the detailed Antimony Resources press release by clicking here.

 

This press release was written by Jack Stoch, P. Geo., Executive Chairman and CEO of Globex in his capacity as a Qualified Person (Q.P.) under NI 43-101.

 

Posted January 9, 2026

Share this news article

MORE or "UNCATEGORIZED"


Vior Gold Corporation Intersects 12.8 g/t Au Over 2.0 Meters and 5.45 g/t Au Over 3.0 Meters

VIOR GOLD CORPORATION INC. (TSX-V: VIO) (OTCQB: VIORF) (FRA: VL5)... READ MORE

May 7, 2026

One Bullion Reports Gravity-Finish Assay Results at Vumba Project, Including 30.8 g/t Au, and Receives EIA Approval for Maitengwe Project

Gravity-Finish Re-Assay Confirms High-Grade Gold Mineralization a... READ MORE

May 7, 2026

American Pacific Reports Underground Assays from Breccia Pipe and Decline Sampling at Madison Project

American Pacific Mining Corp. (CSE: USGD) (OTCQX: USGDF) (... READ MORE

May 7, 2026

PAN GLOBAL REPORTS SURFACE HIGH-GRADE GOLD WITH 20.2 g/t OVER 5.0 METERS AT CÁRMENES PROJECT, SPAIN

Saw-cut sampling returned 20.2 g/t gold over 5.0 meters at surfac... READ MORE

May 7, 2026

McEwen Generates Strong Q1 Results & Advances Multi-Asset Growth Strategy; Net Income $33.4M ($0.56 per Share) vs. Net Loss $6.3M ($0.12 per Share) in Q1 2025; Internally Funding Key Projects to Double Production by 2030

McEwen Inc. (NYSE:MUX) (TSX: MUX) announced its first quarter fin... READ MORE

May 7, 2026

Copyright 2026 The Prospector News