The Prospector News

Abcourt Presents Operations Update for the Quarter ended March 31st, 2026, in the Development of the Sleeping Giant Mine

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Abcourt Presents Operations Update for the Quarter ended March 31st, 2026, in the Development of the Sleeping Giant Mine

Abcourt Mines Inc. (TSX-V: ABI) (OTCQB: ABMBF) is pleased to provide an update on development work completed in the quarter ended March 31st, 2026, at the Sleeping Giant Mine, located in the Eeyou Istchee region of Quebec.

In March, Abcourt continued hiring and training miners. Nine new employees joined the Abcourt team, bringing the total to 143 employees. The plan is to bring the total workforce to 190 employees in the coming months.

Operation Highlights

 

Q1 2025/09/30 Q2 2025/12/31 Q3 2026/03/31 YTD
Diamond Drilling (m) 6,467 4,572 7,153 18,192
Underground Rehabilitation (m) 1,703 903 455 3,061
Underground Development (m) 71 290 307 669
Tonnes Milled (tonnes) 3,511 5,652 7,445 16,608
Mill Head Grade (g/t) 5.9 6.2 5.2 5.7
Ounces Milled (oz) 664 1,125 1,250 3,039
% Recovered 94.9% 96.1% 95.8% 95.7%
Ounces Produced (oz) 630 1,081 1,197 2,908
Ounces Poured (oz) 26 837 1,138 2,001

The gold inventory in the circuit on March 31 was 907 ounces.

The development of the drifts leading to the next long-hole stopes remains the Company’s priority. The first long-hole drill will be commissioned underground during the month of April and Abcourt anticipates the start of the first long-hole stopes in early summer 2026.

Figure 1: Long-Hole Drill, Back View

 

Figure 2: Long-Hole Drill, Front View

 

 

The work at the mining camp continued in March with the addition of a 37-room block, on top of the existing 50 rooms. This second phase in the mining camp construction was commissioned April 13th. The construction of the third block of rooms in the mining camp is scheduled to begin in early summer.

Pascal Hamelin, President and CEO, stated: “With the long-hole drilling beginning in the coming weeks, we expect to increase our tonnage by an additional 1,500 tonnes per month average per long-hole stope. Ultimately, we plan to have three long-hole stopes in operation at the same time while developing the next stopes. Also, I wish to congratulate the construction team at the mining camp for the safe execution of the second phase. It shows very clear commitment to execute this type of construction on time and the middle of the Canadian winter.”


Gravimetric Geophysical Survey at Sleeping Giant

A gravimetric geophysical survey will soon be conducted across the entire Sleeping Giant property by the Val-d’Or-based firm Géophysique TMC. Approximately 750 measurement points will be used to cover the entire site.

The objective of this study is to identify the possible presence of significant mineralized zones at depth, which could correspond to massive sulfide deposits. This technology can detect anomalies up to approximately 2 kilometers below the surface, depending on conditions.

This survey is justified by recent observations of drill cores, which have revealed the presence of minerals such as sphalerite and chalcopyrite, often associated with gold. These observations suggest significant mineral potential linked to a deep volcanic source.

It is important to note that a survey of this scale has never been conducted on the property before, making it a first for Abcourt Mines. The results will allow for better targeting of future drilling and assessment of the deposit’s potential at depth, with the aim of optimizing the next stages of exploration.

Qualified Person

Pascal Hamelin, Eng, President and Chief Executive Officer of the Corporation, has verified and approved the technical information contained in this press release.

Mr. Hamelin is a qualified person under Regulation 43-101.

ABOUT ABCOURT MINES INC.

Abcourt Mines Inc. is a Canadian gold development company with properties strategically located in northwestern Québec, Canada. Abcourt owns the Sleeping Giant mine and mill, as well as the Flordin property, where it focuses its development activities.

For more information about Abcourt Mines Inc., please visit our website at www.abcourt.ca and view our filings under Abcourt’s profile on www.sedarplus.ca.

 

Pascal Hamelin
President and CEO
T : (819) 768-2857
Email: phamelin@abcourt.com
Dany Cenac Robert,
VP Communications and Corporate Development
T : (514) 722-2276, ext. 456
Email: ir@abcourt.com
Posted April 15, 2026

Share this news article

MORE or "UNCATEGORIZED"


Kobo Resources Announces Closing of Non-Brokered Private Placement for Gross Proceeds of $5.5 Million and Engagement of Atrium Research

Kobo Resources Inc. (TSX-V: KRI) is pleased to announce that it has closed its previously announced... READ MORE

April 15, 2026

VanadiumCorp Resource Receives Conditional Approval, Closes First Tranche of Financing

VanadiumCorp Resource Inc. (TSX-V: VRB) (FSE: NWNA) (OTC: VRBFF) Further to its April 6, 2026 news r... READ MORE

April 15, 2026

Grid Metals and Boliden Sign $10 Million Earn-In Agreement for the Thompson East Copper/Nickel Project in Northern Manitoba

Grid Metals Corp. (TSX-V:GRDM)(OTCQB:MSMGF) is pleased to announce it has executed a definitive opti... READ MORE

April 15, 2026

Brunswick Exploration Drills 90.5 Meters at 1.31% Li2O at Anatacau Project

Brunswick Exploration Inc. (TSX-V: BRW) (OTCQB: BRWXF) (Frankfurt: 1XQ) is pleased to announ... READ MORE

April 15, 2026

USA Rare Earth Completes First Commercial Yttrium Metal Production

USA Rare Earth, Inc. (Nasdaq: USAR), an emerging global leader in rare earth materials and te... READ MORE

April 15, 2026

Copyright 2026 The Prospector News