Abcourt Mines Inc. is pleased to present a major, unaudited operational update for the fourth quarter ending June 30, 2026, as well as the year-to-date consolidated results for its Sleeping Giant gold mine, located in Abitibi, Quebec.

 

Q4 2026 Operational Highlights (Quarter ended June 30, 2026):

  • Strong acceleration in mill processing: A total of 11,891 tonnes of ore was processed during Q4, representing an impressive 160% increase compared to the previous quarter (7,445 tonnes in Q3). The month of June marked a historical peak for the year with 5,229 tonnes milled.
  • Ongoing gold production: Gold production in Q4 amounted to 720 ounces produced (with 646 ounces poured), bringing the annual cumulative total to 3,628 ounces produced (including 2,647 ounces poured for the fiscal year).
  • Underground development up 180%: Underground mine development reached a record 554 meters in Q4 (including 215 meters in the month of June alone), compared to 307 meters in Q3.
  • Intensification of exploration drilling: Diamond drilling totaled 11,059 meters in Q4, representing a 155% increase compared to Q3, demonstrating the sustained effort to expand the mine’s resources.
  • Start of the first Long Hole stope: The drill is currently operating in the mine, allowing the start of long hole stope extraction.

 

Detailed Operational Data — 2025-2026 Fiscal Year

 

The following table presents the monthly and quarterly evolution of mill activities and underground operations at the Sleeping Giant mine:

 

  1. Processing Plant Operations

 

Period Tonnes Milled Grade (g/t Au) Ounces Fed Recovery Rate (%) Ounces Produced Ounces Poured
July 2025 0 0 0 0.00% 0 0
August 2025 1 072 5.66 195 100.00% 195 0
September 2025 2 439 5.98 469 92.80% 435 26
TOTAL-Q1 (09/30/25) 3 511 5.88 664 94.90% 630 26
             
October 2025 2 563 6 496.8 95.60% 475 124
November 2025 1 346 7.2 311 95.80% 298 425
December 2025 1 743 5.7 317 97.20% 308 288
TOTAL-Q2 (12/31/25) 5 652 6.2 1 124.8 96.10% 1 081 837
             
January 2026 2 759 7.3 644 97.20% 626 374
February 2026 1 803 5.7 328 97.00% 318 398
March 2026 2 883 3 278 91.00% 253 366
TOTAL-Q3 (03/31/26) 7 445 5.2 1 250.0 95.80% 1 197 1 138
             
April 2026 2 872 1.8 162 87.00% 141 282
May 2026 3 790 2 239.8 90.10% 216 189
June 2026 5 229 2.3 393 92.40% 363 175
TOTAL-Q4 (06/30/26) 11 891 2.1 794.8 90.60% 720 646
             
Cumulative (YTD) 28 499 4.18 3 834.0 94.60% 3 628 2 647

Production Variance Analysis:

  • Milled Tonnage (Q4 vs Q3): +160% in mill throughput capacity, driven by the ongoing training of the underground workforce.
  • Average Grade: The average grade for the fiscal year stands at 4.18 g/t Au. The decrease in Q4 (2.1 g/t) reflects the processing of lower-grade development zones, typical of a transitional expansion phase in underground workings.
  • Ounces Produced (Q4 vs Q3): 60 % of Q3 production, directly correlated with the lower grade during these three months, though partially offset by the increased mill throughput.

 

  1. Underground Operations and Development

 

Period Diamond Drill (m) Gallery
Rehabilitation (m)
Underground
Development (m)
T1 6 467 1 703 71.6
T2 4 572 903 290
T3 7 153 455 307
T4 11 059 1 052 554
Variations
T4 vs T3
155% 231% 180%
Total YTD 29 251 m 4 113 m 1 222.6 m

 

Underground mine development experienced a major leap in Q4 with 554 meters completed (a 180% increase compared to Q3). Gallery rehabilitation also showed a marked increase of 231% (1,052 m compared to 455 m in Q3), which will help improve the number of available working faces in the future.

 

A message from Management:

 

“This fourth quarter demonstrates the success of our ramp-up phase at Sleeping Giant,” states Pascal Hamelin, President and CEO of Abcourt Mines. “Despite temporarily lower grades this quarter, due to mine plan sequencing, mill efficiency and daily throughput have reached new heights. With over 11,000 meters of drilling and 1,052 meters of rehabilitated galleries during the last quarter, we are laying solid foundations for the upcoming fiscal year.”

 

Qualified Person : Pascal Hamelin, P. Eng., President and Chief Executive Officer of the Company, has reviewed and approved the technical information contained in this press release. Mr. Hamelin is a Qualified Person under National Instrument 43-101.

 

About Abcourt Mines Inc.

 

Abcourt Mines Inc. is a Canadian gold development company with properties strategically located in northwestern Quebec, Canada. Abcourt owns the Sleeping Giant mine and mill and the Flordin property, where it focuses its activities.

 

Posted July 16, 2026

Share this news article

MORE or "UNCATEGORIZED"


Canadian Copper Inc. Announces Closing of $44M Project Financing with OR Royalties Inc.

Canadian Copper Inc. (CSE: CCI) announces that it has closed its ... READ MORE

July 16, 2026

New Pacific Metals Reports Results of Updated Carangas Preliminary Economic Assessment: Post-tax $2.65 Billion NPV (5%) and 35.9% IRR; 339.0 Million Oz of Silver Equivalent Produced

New Pacific Metals Corp. (TSX: NUAG) (NYSE-A: NEWP) is pleased to... READ MORE

July 16, 2026

Thunder Gold Reports 1.793 g/t Au over 45.0 metres at UV Target Advancing Tower Mountain Resource Growth Strategy

Thunder Gold Corp. (TSX-V: TGOL) (FSE: Z25) (OTCQB: TGOLF) is ple... READ MORE

July 16, 2026

Vior Gold Corporation Extends High-Grade Mineralization Laterally

5.17 g/t Au Over 2.9 Meters and 7.37 g/t Au Over 2.0 Meters   VI... READ MORE

July 16, 2026

Copyright 2026 The Prospector News