Atico Mining Corporation (TSX-V: ATY) (OTCID: ATCMF) is pleased to announce positive results from 21 drill holes completed in 2025 within an area of historical mining, successfully expanding the tonnage at the El Roble mine. The table below highlights some assay results in bold for drill core holes, which include 10.20m of 6.26% Cu, 8.50 g/t Au and 10.00m of 6.77% Cu, 3.39 g/t Au. Ore grade intercepts are reported over widths of 0.27 to 10.3 meters in areas with limited drilling with results highlighting the possibility of further extending the ore body with additional drill programs.
Holes ATD-0329 through ATD-0348 have discovered important new mineralization which are considerably beyond our expectations for the ¨Cuerpo Principal Inferior¨ CP ore body.
“Our ongoing drilling campaign at El Roble continues to deliver important results, intercepting new mineralization while successfully extending the boundaries of historical massive sulfide zones,” said Fernando E. Ganoza, CEO. “These assay results reinforce our confidence that higher-grade copper and gold mineralization extends beyond the historical footprint. The deposit remains open both at depth and along strike, confirming significant potential within and outside the previously defined mineralized shell. The drill campaign is planned to continue throughout 2026.”
Exploration Drilling Results with a 1% copper cutoff Include:
| Hole | From (m) | To (m) | Interval (m) | Cu % | Au g/t |
| ATD-0329 | 75.00 | 82.30 | 7.30 | 9.93 | 2.56 |
| ATD-0329 | 92.90 | 94.60 | 1.70 | 6.54 | 1.79 |
| ATD-0329 | 96.30 | 99.10 | 2.80 | 6.56 | 1.40 |
| ATD-0329 | 101.00 | 102.00 | 1.00 | 2.91 | 4.95 |
| ATD-0329 | 103.00 | 113.00 | 10.00 | 6.77 | 3.39 |
| ATD-0329 | 119.60 | 121.20 | 1.60 | 2.20 | 2.95 |
| ATD-0331 | 92.00 | 94.80 | 2.80 | 7.26 | 6.28 |
| ATD-0331 | 95.40 | 99.00 | 3.60 | 3.51 | 24.61 |
| ATD-0331 | 107.80 | 109.00 | 1.20 | 7.45 | 7.95 |
| ATD-0331 | 111.80 | 113.70 | 1.90 | 7.30 | 4.61 |
| ATD-0333 | 98.30 | 99.20 | 0.90 | 4.92 | 7.62 |
| ATD-0333 | 100.00 | 101.00 | 1.00 | 1.76 | 4.00 |
| ATD-0333 | 104.00 | 109.20 | 5.20 | 3.40 | 3.54 |
| ATD-0333 | 112.00 | 116.60 | 4.60 | 3.60 | 5.32 |
| ATD-0333 | 119.50 | 123.10 | 3.60 | 10.14 | 9.46 |
| ATD-0333 | 126.00 | 127.00 | 1.00 | 3.35 | 1.11 |
| ATD-0334 | 91.60 | 95.20 | 3.60 | 6.27 | 4.99 |
| ATD-0334 | 95.70 | 98.00 | 2.30 | 2.63 | 3.14 |
| ATD-0334 | 99.50 | 101.60 | 2.10 | 10.65 | 2.16 |
| ATD-0334 | 106.80 | 108.80 | 2.00 | 7.70 | 1.10 |
| ATD-0336 | 70.14 | 70.43 | 0.29 | 1.47 | 1.92 |
| ATD-0336 | 71.00 | 71.27 | 0.27 | 4.34 | 21.10 |
| ATD-0336 | 72.40 | 76.00 | 3.60 | 3.91 | 3.85 |
| ATD-0338 | 68.44 | 76.45 | 8.01 | 7.02 | 2.78 |
| ATD-0338 | 88.90 | 93.20 | 4.30 | 1.58 | .60 |
| ATD-0338 | 101.10 | 103.00 | 1.90 | 6.36 | 2.09 |
| ATD-0340 | 93.70 | 96.00 | 2.30 | 4.21 | 3.98 |
| ATD-0340 | 98.40 | 108.70 | 10.30 | 3.33 | 4.21 |
| ATD-0341 | 86.40 | 90.90 | 4.50 | 5.57 | .83 |
| ATD-0341 | 92.30 | 93.40 | 1.10 | 2.97 | 1.04 |
| ATD-0342 | 88.25 | 91.60 | 3.35 | 4.92 | 14.23 |
| ATD-0343 | 82.00 | 84.50 | 2.50 | 1.21 | 1.22 |
| ATD-0343 | 85.00 | 89.00 | 4.00 | 3.75 | 3.72 |
| ATD-0344 | 105.10 | 106.80 | 1.70 | 2.03 | 1.84 |
| ATD-0346 | 112.00 | 122.20 | 10.20 | 6.26 | 8.50 |
| ATD-0347 | 113.55 | 119.20 | 5.65 | 5.94 | 8.72 |
| ATD-0347 | 121.80 | 122.80 | 1.00 | 1.45 | 24.60 |
| ATD-0347 | 123.90 | 124.60 | 0.70 | 1.94 | 31.70 |
| ATD-0348 | 81.15 | 82.60 | 1.45 | 1.01 | 5.00 |
| ATD-0348 | 84.60 | 86.35 | 1.75 | 3.27 | 18.40 |
| ATDM-070 | 43.00 | 47.60 | 4.60 | 5.12 | 3.12 |
| ATDM-071 | 35.00 | 37.00 | 2.00 | 3.77 | 5.12 |
| ATDM-071 | 39.00 | 43.00 | 4.00 | 4.60 | 2.30 |
| ATDM-073 | 37.00 | 40.00 | 3.00 | 7.84 | 5.39 |
| ATDM-075 | 37.20 | 45.50 | 8.30 | 4.01 | 3.77 |
| ATDM-078 | 43.60 | 46.30 | 2.70 | 2.44 | 12.67 |
| ATDM-081 | 32.40 | 33.50 | 1.10 | 4.95 | 4.90 |
| ATDM-081 | 51.50 | 54.40 | 2.90 | 1.98 | 1.15 |
True widths are dependent on uncertainties in the local strike and dip of the mineralization and are estimated to be between 90% and 95% of the drill intercept.
Image 1: Mineralized shells based on historical massive and new bodies at the El Roble Mine with intercepts from the current drill program
Image 2: Detailed view of mineralized shells based on historical massive and new bodies at the El Roble Mine with intercepts from the current drill program
Exploration Drilling Program
The goal of the 2025 underground drilling program at the El Roble mine is to define zones of mineralization within the extent of the main historic massive sulphide body that were not exploited by previous operators, to expand the historically identified resource and explore for new massive sulfide bodies. The Company began this drill infill program to test the main mineralized body and the immediately adjacent area during the first quarter of 2023 and has continued the program with over 5,000 meters of drilling during 2025.
All intervals include only assays of greater than 1% Cu and higher-grade intervals within these sections do not occur.
El Roble Mine
The El Roble mine is a higher grade, underground copper and gold mine with nominal processing plant capacity of 1,000 tonnes per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.
Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a historical nominal capacity of 400 tonnes per day.
El Roble’s reserves estimate, with an effective date of March 12, 2024, includes Proven and Probable mineral reserves of 828 thousand tonnes averaging 2.49% Cu, 2.20 g/t Au and a life of mine until Q1-2027. A full NI 43-101 technical report is available on SEDAR+. For more information on the reserves estimate refer to SEDAR+ and on the Company’s website.
Mineralization is open at depth and along strike and the Company plans to further test the limits of the deposit. On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey pelagic sediments and cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified numerous target areas prospective for VMS type mineralization occurrence, which is the focus of the current surface drill program at El Roble.
About Atico Mining Corporation
Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company generates significant cash flow through the operation of the El Roble mine and is developing its high-grade La Plata VMS project in Ecuador. The Company is also pursuing additional acquisition of advanced stage opportunities. For more information, please visit www.aticomining.com.
ON BEHALF OF THE BOARD
Fernando E. Ganoza
CEO
Atico Mining Corporation
Trading symbols: TSX.V: ATY | OTCID: ATCMF
Investor Relations
Igor Dutina
Tel: +1.604.633.9022
Skeena Resources Limited (TSX: SKE) (NYSE: SKE) is pleased to announce the receipt of its British Co... READ MORE
Spanish Mountain Gold Ltd. (TSX-V: SPA) (FSE: S3Y) (OTCQB: SPAUF) is pleased to report additi... READ MORE
Minera Alamos Inc. (TSX-V: MAI) (OTCQX: MAIFD) today announces that a subsidiary of Equinox G... READ MORE
Altamira Gold Corp. (TSX-V: ALTA) (FSE: T6UP) (OTCQB: EQTRF), is pleased to report assay res... READ MORE