The Prospector News

Tectonic Metals Drills 9.94 g/t Au over 36.58 meters including 15.73 g/t Au over 22.86 metres with 104.23 g/t Au over 3.05 meters at Chicken Mountain, Flat Gold Project

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Tectonic Metals Drills 9.94 g/t Au over 36.58 meters including 15.73 g/t Au over 22.86 metres with 104.23 g/t Au over 3.05 meters at Chicken Mountain, Flat Gold Project

Tectonic Metals Inc. (TSX-V: TECT) (OTCQB: TETOF) today announced additional drill assay results from the Company’s flagship 99,800-acre Flat Gold Project in Southwest Alaska.  Results are highlighted by a 364 gram-metre intercept at Chicken Mountain returning 9.94 g/t Au over 36.58 m, including 15.73 g/t Au over 22.86 m, with a bonanza-grade interval of 104.23 g/t Au over 3.05 m (hole CMR25-084), see Figure 1.  The hole ended in mineralization at 54.86 m, indicating strong down-dip and along-strike expansion potential.

Assay results from 42 drill holes are reported herein – 4 diamond core holes and 38 reverse circulation holes – representing approximately 3,950 metres of drilling from the Company’s 18,373 m 2025 program. Drilling targeted step-out expansion and early-stage resource delineation in the southern portion of the Chicken Mountain intrusion.

 

CEO Commentary

“There aren’t many times in your career when you can announce a 364 gram-meter intercept and follow that with ‘…and by the way, the project boasts a 100% drill success across 176 drill holes,’ “stated Tony Reda, President and CEO.  “That combination is rare in exploration.  Every single hole hit gold, which we believe is evidence of a very robust mineralizing gold system. Furthermore, the bonanza-grade intercept in drill hole CMR25-084 demonstrates that the Chicken Mountain system can generate high grades within mappable structural corridors.”

“And we’re only scratching the surface…. literally. The fact that 65% of our holes ended in mineralization, including a 425-metre-long drill hole, means we’re drill-limited, not geology-limited. When you combine that depth extent with our demonstrated 3-kilometer strike length at Chicken Mountain, you start to see the scale potential here.”

“We’re systematically advancing toward a maiden mineral resource estimate while maintaining substantial blue-sky exploration upside across our 99,800-acre land package. With assays pending from 34 additional drill holes and aggressive drilling planned for 2026, our shareholders can expect continuous news flow and another exciting year ahead.”

 

Chicken Mountain Video and Figures

  • Please watch a video highlighting the 2025 resource delineation drilling at Chicken Mountain: Click Here to View Video

 

Key Geological Achievements and Characteristics

  1. 364 Gram-Metre Bonanza Intercept Anchors a New Interpreted Higher-Grade Corridor, see Figure 3 and 4.
    • CMR25-084:  104.23 g/t Au over 3.05 m within 15.73 g/t Au over 22.86 m, all within 9.94 g/t Au over 36.58 m
    • Represents the highest gram-metre intercept reported to date at Chicken Mountain
    • Hole ended in mineralization at 54.86 m, indicating down-dip and along-strike expansion potential.
  2. 100% Drill Success Rate
    • 176 of 176 holes intersected gold mineralization (100% success)
    • 108 of 176 holes (61.4%) ended in mineralization
    • Mineralization begins at or near surface along entire 3 km of strike length
  1. Significant Resource Expansion Potential
    • Chicken Mountain, including Alpha Bowl and Adit Zones, demonstrates over 3.0 km x 1 km x 400 m of potential mineralized strike, width and depth.
    • Multiple higher-grade corridors identified; see below.
    • Mineralization remains open at to the south, north, east, west and at depth. The depth is constrained only by drill depth, not by geological boundaries.
    • Early resource delineation drilling demonstrates continuity and predictability of the mineralized envelope
      • Five drill sections on a ~200 m x ~75 m spacing executed with all drill holes collared in mineralization
    • Diamond drilling on the central Chicken Mountain section confirms multiple mineralized intervals and corridor to at least ~230 m vertical extent, with mineralization continuing to >300 m downhole in deeper holes (e.g., CMD25-027).
  1. Multiple Interpreted Higher-Grade Corridors Emerging, see Figure 2
    1. Southern Chicken Mountain Corridor
      • Anchored by CMR25-084 bonanza intercept, 15.73 g/t Au over 22.86 m including 104.23 g/t Au over 3.05 m, all within 9.94 g/t Au over 36.58 m (364 gram-metres)
      • Supported by:
        • CMR25-080:  1.09 g/t Au over 25.91 m within 0.62 g/t Au over 89.92 m
        • CMR25-091:  1.02 g/t Au over 21.34 m within 0.55 g/t Au over 72.54 m
        • CRM25100:  1.27 g/t Au over 15.24 m and 1.09 g/t Au over 9.14 m within 0.49 g/t Au over 115.82 m
        • F88-10:  1.01 g/t Au over 33.60 m and 1.18 g/t Au over 32.00 m
        • Trench:  1.09 g/t Au over 24.13 m
      • Current Mineralized Strike Length, Width and Depth of Corridor:  400 m strike, 220 m width, 150 m depth and open
    2. Central Chicken Mountain Corridor 1
      • Anchored by CMD23-002 intersecting 1.22 g/t Au over 34.46 m, within 0.54 g/t Au over 170.00 m.
      • Supported by:
        • DDH97-18CM:  1.12 g/t Au over 37.79 m
        • DDH97-17CM:  1.09 g/t Au over 13.72 m, within 0.59 g/t Au over 71.70 m
        • CMD25-029:  0.83 g/t Au over 49.00 m
        • Trench:  1.09 g/t Au over 19.81 m
      • Current Mineralized Strike Length, Width and Depth of Corridor:  250 m strike, 150 m width, 150 m depth and open
    3. Central Chicken Mountain Corridor 2
      • Anchored by CMD25-011, intersecting 1.46 g/t Au over 26.00 m within 0.69 g/t Au over 124.97 m.
      • Supported by:
        • CMD25-027:  1.07 g/t Au over 13.00 m within 0.52 g/t Au over 18.00 m
        • CMD25-014:  1.10 g/t Au over 34.00 m, within 0.79 g/t Au over 51.15 m
        • Trench:  6.64 g/t Au over 27.44 m
      • Current Mineralized Strike Length, Width and Depth of Corridor:  200 m strike, 150 m width, 100 m depth and open
    4. Northern Chicken Mountain Corridor
      • Anchored by DDH97-16CM bonanza intercept, 12.56 g/t Au over 24.70 m, including 211.27 g/t Au over 1.40 m (310 gram-metres)
      • Supported by:
        • F88-02:  1.27 g/t Au over 39.60 m
        • DDH98-05CM:  1.19 g/t Au over 27.43 m
        • CMD23-001:  1.02 g/t Au over 37.32 m, within 0.41 g/t Au over 423.15 m
      • Current Mineralized Strike Length, Width and Depth of Corridor:  200 m strike, 200 m width, 250 m depth and open
    5. Adit Higher-Grade Corridor
      • Anchored by CMR25-121, intersecting 8.84 g/t Au over 13.72 m within 4.05 g/t Au over 30.48 m
      • Supported by:
        • CMD03-025:  27.20 g/t Au over 1.53 m, within 1.05 g/t Au over 36.80 m
        • CMD23-008:  1.08 g/t Au over 24.39 m
        • F90-02:  1.16 g/t au over 9.15 m and 1.08 g/t Au over 9.14 m
      • Current Mineralized Strike Length, Width and Depth of Corridor:  1000 m strike, 150 m width, 200 m depth and open
    6. Alpha Bowl Higher-Grade Corridor
      • CMR25-035:  4.00 g/t Au over 21.34 m, within 3.00 g/t Au over 41.15 m, open to the east
      • CMR24-026:  6.01 g/t Au including, 21.72 g/t Au over 1.52, all within 1.22 g/t Au over 65.53 m, open to the east
      • CMD25-015:  1.36 g/t Au over 39.00 m, including 25.16 g/t Au over 0.60 m, all within 0.85 g/t Au over 74.00 m

 

Key Drill Highlights Reported Today

CMR25-084 (Bonanza grade intercept)

  • 104.23 g/t Au over 3.05 m, within
    15.73 g/t Au over 22.86 m, all within
    9.94 g/t Au over 36.58 m
    RC drill ending in mineralization; total hole length 54.86 m

CMD25-027

  • 4.79 g/t Au over 5.00 m, within
    1.77 g/t Au over 16.00 m, all within
    0.74 g/t Au over 95.00 m
  • 1.07 g/t Au over 13.00 m, and
    0.61 g/t Au over 83.00 m, all within
    0.52 g/t Au over 118.00 m
    Diamond drill hole drill ending in mineralization; total hole length 322.17 m

CMR25-080

  • 1.09 g/t Au over 25.91 m, within
    0.62 g/t Au over 89.92 m
    RC drill hole ending in mineralization; total hole length 91.44 m

CMR25-091

  • 1.02 g/t Au over 21.34 m, within
    0.55 g/t Au over 72.54 m
    RC drill hole ending in mineralization; total hole length 80.16 m

CMR25-100

  • 1.27 g/t Au over 15.24 m, and
    1.09 g/t Au over 9.14, all within
    0.49 g/t Au over 115.82 m
    RC drill hole ending in mineralization; total hole length 121.92 m

CMR25-073

  • 1.08 g/t Au over 13.72 m, and
    0.96 g/t Au over 10.67 m, all within
    0.46 g/t Au over 91.44 m
  • RC drill hole ending in mineralization; total hole length 91.44 m

CMD25-029

  • 0.83 g/t Au over 49.00 m, within
    0.45 g/t Au over 179.00 m
    Diamond drill hole drill ending in mineralization; total hole 321.56 m

 

Results Summary

A summary of the results released today for the 38 RC holes are presented by drill section in Table 1, and a summary of the four diamond drill core results are presented in Table 2. Data pertaining to locations of drill holes included in the announcement are presented in Table 3. Full assay results for the 38 RC and four core results can be found at this link: Click Here for Full Assay Results.

 

Chicken Mountain Video and Figures: Please watch a video highlighting the scale and potential of the Chicken Mountain: Click Here to View Video

 

Drill Plan Maps and Images:  Click Here to View. Select images below.

 

Assay Results From 34 Additional Holes Pending

  • Remaining 2025 resource delineation drilling at Chicken Mountain
  • Exploration drilling at Alpha Bowl testing the additional 500m strike potential
  • First-pass exploration drilling at Black Creek and Jam Intrusion targets
  • Follow up drilling at Golden Apex
  • Tectonic will provide further updates as results are received, interpreted, and validated

 

To learn more about the 2025 Drill Programs, click here: Tectonic Metals Delivers Record 18,372 Metres Across 125 Drill Holes at Flat Gold Project, Alaska

 

Figure 1: Plan View and Long Section looking Northeast, drill results and pending drill hole assays can be viewed at: CLICK HERE TO VIEW FIGURE 1

Figure 2: Plan View of Chicken Mountain, highlighting the interpreted higher grade corridors can be viewed at: CLICK HERE TO VIEW FIGURE 2

Figure 3: Plan View of Chicken Mountain South Area, highlighting the drilling lines, drill results and pending drill hole assays can be viewed at: CLICK HERE TO VIEW FIGURE 3

Figure 4: Cross Section Looking North of Drilling Line 1, highlighting drill results and higher grade corridors can be viewed at: CLICK HERE TO VIEW FIGURE 4

 

Table 1. Significant Highlights Chicken Mountain RC Drill Results Line 1* 

Hole ID From (m) To (m) Length (m) Au (g/t)
CMR25-069 25.91 44.20 18.29 0.49
RC including 28.96 30.48 1.52 1.17
TD=44.20 m with 36.58 42.67 6.10 0.77
End in Min: Yes
CMR25-070 38.11 83.84 45.73 0.55
RC including 38.11 77.74 39.63 0.62
TD=105.18 m with 56.40 77.74 21.34 0.78
End in Min: Yes
89.94 105.18 15.24 0.33
CMR25-073 0.00 91.44 91.44 0.46
RC including 12.19 28.96 16.76 0.75
TD=91.44 m with 15.24 25.91 10.67 0.96
End in Min: Yes and including 74.68 88.39 13.72 1.08
TD=91.44 m
End in Min: Yes 86.87 88.39 1.52 6.22
CMR25-076 64.01 92.96 28.96 0.52
RC including 71.63 89.92 18.29 0.71
TD=103.63 m with 79.25 89.92 10.67 1.00
End in Min: No and with 83.82 85.34 1.52 4.57
CMR25-077 15.24 51.82 36.58 0.37
RC including 18.29 32.00 13.72 0.52
TD=53.34 m
End in Min: Yes
CMR25-080 1.52 91.44 89.92 0.62
RC including 9.14 18.29 9.14 0.78
TD=91.44 m and including 38.10 64.01 25.91 1.09
End in Min: Yes
CMR25-083 1.52 33.53 32.00 0.79
RC including 9.14 28.96 19.81 1.06
TD=77.24 m
End in Min: Yes 38.10 77.72 39.62 0.39
including 50.29 53.34 3.05 1.18
and including 62.48 67.06 4.57 0.78
CMR25-084 1.52 38.10 36.58 9.94
RC including 13.72 36.58 22.86 15.73
TD=54.86 m with 13.72 16.76 3.05 104.23
End in Min: Yes
44.20 47.24 3.05 0.64
51.82 54.86 3.05 1.01
CMR25-086 0.00 42.67 42.67 0.48
RC including 1.52 6.10 4.57 0.80
TD=96.01 m  
End in Min: Yes 28.96 39.62 10.67 0.97
including 28.96 32.00 3.05 1.82
with 36.58 39.62 3.05 1.27
48.77 96.01 47.24 0.51
including 51.82 70.10 18.29 0.73
with 89.92 96.01 6.10 1.11
CMR25-087 0.00 48.77 48.77 0.51
RC including 0.00 3.05 3.05 0.65
TD=74.68 m and including 10.67 19.81 9.14 1.61
End in Min: Yes with 12.19 13.72 1.52 7.06
CMR25-090 0.00 32.00 32.00 0.40
RC including 6.10 30.48 24.38 0.48
TD=32.00 m with 13.72 19.81 6.10 0.89
End in Min: Yes and with 27.43 30.48 3.05 0.54
CMR25-091 7.62 80.16 72.54 0.55
RC including 9.14 67.06 57.91 0.62
TD=80.16 m with 13.72 41.15 27.43 0.88
End in Min: Yes with 18.29 39.62 21.34 1.02

*All reported intercepts are reported as downhole lengths, as insufficient data exists to determine true widths. Select composites utilizing 0.10, 0.30 or 0.50 g/t Au cut-off with a maximum 3.2m continuous (two sample) below the cut-off inclusion.

 

Table 1. Significant Highlights Chicken Mountain RC Drill Results Line 2* 

Hole No.  From (m) To (m)  Length (m)  Au g/t 
CMR25-072 1.52 7.62 6.10 0.66
RC including 6.10 7.62 1.52 2.36
TD=65.53 m
End in Min: Yes 13.72 24.38 10.67 0.39
including 19.81 24.38 4.57 0.69
35.05 41.15 6.10 0.34
including 38.10 41.15 3.05 0.53
48.77 65.53 16.76 0.30
51.82 59.44 7.62 0.47
CMR25-074 0.00 48.78 48.78 0.25
RC including 32.01 39.63 7.62 0.79
TD=82.32 m
End in Min: No
CMR25-078 47.24 64.01 16.76 0.34
RC including 51.82 56.39 4.57 0.66
TD=50.29 m
End in Min: Yes
CMR25-081 12.19 24.38 12.19 0.50
RC including 12.19 16.76 4.57 1.09
TD=44.20 m
End in Min: No
CMR25-082 0.00 16.76 16.76 0.30
RC 9.14 10.67 1.52 0.81
TD=19.81 m
End in Min: Yes
CMR25-085 32.00 97.54 65.53 0.31
RC including 51.82 53.34 1.52 1.14
TD=99.06 m and including 62.48 68.58 6.10 0.68
End in Min: Yes and including 73.15 82.30 9.14 0.70
CMR25-088 1.52 51.82 50.29 0.32
RC including 3.05 10.67 7.62 0.41
TD=79.25 m and including 42.67 45.72 3.05 0.48
End in Min: Yes
56.39 79.25 22.86 0.20
including 56.39 57.91 1.52 0.90
CMR25-089 4.57 57.91 53.34 0.45
RC including 4.57 21.34 16.76 0.60
TD=57.91 m with 9.14 16.76 7.62 0.97
End in Min: Yes with 13.72 16.76 3.05 1.61
and including 35.05 41.15 6.10 0.54
and including 47.24 54.86 7.62 0.89
with 51.82 54.86 3.05 1.64
CMR25-092 13.72 73.15 59.44 0.29
RC including 16.76 33.53 16.76 0.44
TD=74.68 m and including 44.20 48.77 4.57 0.65
End in Min: Yes
CMR25-093 0.00 60.96 60.96 0.42
RC including 10.67 15.24 4.57 0.64
TD=60.96 m and including 47.24 60.96 13.72 1.01
End in Min: Yes with 53.34 60.96 7.62 1.59
CMR25-096 6.10 68.58 62.48 0.34
RC including 7.62 28.96 21.34 0.58
TD=106.68 m with 7.62 13.72 6.10 0.92
End in Min: Yes
82.30 106.68 24.38 0.25
including 102.11 103.63 1.52 1.04

*All reported intercepts are reported as downhole lengths, as insufficient data exists to determine true widths. Select composites utilizing 0.10, 0.30 or 0.50 g/t Au cut-off with a maximum 3.2m continuous (two sample) below the cut-off inclusion.

 

Table 1. Significant Highlights Chicken Mountain RC Drill Results Line 3* 

Hole No.  From (m) To (m)  Length (m)  Au g/t 
CMR25-094 3.05 89.92 86.87 0.19
RC including 6.10 12.19 6.10 0.41
TD=89.92 m and including 35.05 42.67 7.62 0.30
End in Min: Yes and including 86.87 89.92 3.05 0.49
CMR25-095 13.72 24.38 10.67 0.26
RC including 13.72 15.24 1.52 0.85
TD=53.34m
End in Min: Yes
CMR25-097 44.20 83.82 39.62 0.37
RC including 51.82 54.86 3.05 0.36
TD=85.34m and including 57.91 77.72 19.81 0.49
End in Min: Yes with 57.91 73.15 15.24 0.53
CMR25-100 3.05 118.87 115.82 0.49
RC including 18.29 54.86 36.58 0.95
TD=121.92 m with 21.34 30.48 9.14 1.09
End in Min: No and with 39.62 54.86 15.24 1.27
CMR25-102 15.24 83.82 68.58 0.35
RC including 18.29 32.00 13.72 0.56
TD=83.82 with 27.43 32.00 4.57 1.12
End in Min: Yes and including 38.10 45.72 7.62 0.47
and including 57.91 60.96 3.05 1.45
CMR25-104 9.14 38.10 28.96 0.27
RC including 9.14 22.86 13.72 0.38
TD=90.01
End in Min: Yes 42.67 96.01 53.34 0.40
including 54.86 77.72 22.86 0.66
with 57.91 64.01 6.10 1.20
with 57.91 60.96 3.05 1.79
CMR25-105 7.62 59.44 51.82 0.29
RC including 9.14 13.72 4.57 0.46
TD=59.44 m and including 21.34 27.43 6.10 0.80
End in Min: Yes with 24.38 25.91 1.52 2.05
CMR25-106 12.19 35.05 22.86 0.62
RC including 19.81 35.05 15.24 0.82
TD=35.05 with 24.38 35.05 10.67 0.95
End in Min: Yes

*All reported intercepts are reported as downhole lengths, as insufficient data exists to determine true widths. Select composites utilizing 0.10, 0.30 or 0.50 g/t Au cut-off with a maximum 3.2m continuous (two sample) below the cut-off inclusion.

 

Table 1. Significant Highlights Chicken Mountain RC Drill Results Line 4* 

Hole No.  From (m) To (m)  Length (m)  Au g/t 
CMR25-098 4.57 60.96 56.39 0.41
RC including 28.96 44.20 15.24 1.05
TD=79.25 m with 36.58 42.67 6.10 2.09
End in Min: Yes and including 57.91 60.96 3.05 0.76
74.68 99.06 24.38 0.39
including 76.20 80.77 4.57 0.47
and including 94.49 96.01 1.52 2.70
CMR25-099 3.05 68.58 65.53 0.25
RC including 13.72 15.24 1.52 1.28
TD=83.82 m and including 44.20 51.82 7.62 0.65
End in Min: Yes with 50.29 51.82 1.52 1.95
and including 57.91 64.01 6.10 0.40
74.68 83.82 9.14 0.36
including 80.77 82.30 1.52 0.73
CMR25-101 6.10 36.58 30.48 0.17
RC including 18.29 19.81 1.52 0.54
TD=109.73 m
End in Min: No 70.10 74.68 4.57 1.21
CMR25-103 102.11 106.68 4.57 0.31
RC
TD=106.68 m
End in Min: Yes

*All reported intercepts are reported as downhole lengths, as insufficient data exists to determine true widths. Select composites utilizing 0.10, 0.30 or 0.50 g/t Au cut-off with a maximum 3.2m continuous (two sample) below the cut-off inclusion.

 

Table 2. Significant Highlights Chicken Mountain Diamond Drill Core Assay Results Line 1*

Hole ID From (m) To (m) Length (m) Au (g/t)
CMD25-027 29.00 38.00 9.00 0.30
Core including 29.00 34.00 5.00 0.45
TD=322.17 m
End in Min: Yes 52.00 60.00 8.00 0.72
including 59.00 60.00 1.00 4.61
65.00 183.00 118.00 0.52
including 91.00 174.00 83.00 0.61
with 100.00 127.00 27.00 0.71
and with 147.00 153.00 6.00 1.15
and with 161.00 174.00 13.00 1.07
189.00 223.00 34.00 0.41
including 196.00 203.00 7.00 1.14
227.00 322.17 95.17 0.74
with 235.00 239.00 4.00 1.08
and including 255.00 258.00 3.00 0.86
and including 263.00 272.00 9.00 1.85
and including 276.00 292.00 16.00 1.77
with 282.00 292.00 10.00 2.65
with 282.00 287.00 5.00 4.79
CMD25-029 0.00 107.00 107.00 0.25
Core including 69.00 94.00 25.00 0.35
TD=321.56 with 76.00 84.00 8.00 0.42
End in Min: Yes and including 99.00 107.00 8.00 0.39
with 99.00 105.00 6.00 0.42
125.00 304.00 179.00 0.45
including 170.00 174.00 4.00 0.60
and including 204.00 253.00 49.00 0.83
with 206.00 236.00 30.00 0.87
and with 242.00 251.00 9.00 1.21
and including 275.00 288.00 13.00 0.65
with 278.00 282.00 4.00 1.39
CMD25-032 1.70 83.00 81.30 0.42
Core including 7.00 22.56 15.56 0.56
TD=271.76 m with 16.00 22.56 6.56 0.82
End in Min: No and including 45.00 47.00 2.00 0.53
and including 53.00 62.00 9.00 0.85
with 54.00 59.00 5.00 1.24
and including 71.00 78.00 7.00 0.90
105.00 182.00 77.00 0.45
and including 131.00 152.00 21.00 0.67
with 131.00 141.00 10.00 1.04
and including 156.00 182.00 26.00 0.51
with 163.00 177.00 14.00 0.64
236.00 249.00 13.00 1.04
including 241.00 249.00 8.00 1.62
CMD25-034 3.00 41.00 38.00 0.33
Core including 3.00 15.00 12.00 0.46
TD=279.20 m and including 24.00 35.00 11.00 0.42
End in Min: Yes
46.00 86.00 40.00 0.25
including 84.00 86.00 2.00 1.08
95.00 109.00 14.00 0.34
including 97.00 106.00 9.00 0.43
117.00 271.00 154.00 0.25
including 129.00 131.00 2.00 1.60
and including 184.00 187.00 3.00 0.76
and including 193.00 194.00 1.00 1.08
and including 204.00 206.00 2.00 0.56
and including 213.00 227.00 14.00 0.87
with 215.00 224.00 9.00 1.16

*All reported intercepts are reported as downhole lengths, as insufficient data exists to determine true widths. Select composites utilizing 0.10, 0.30 or 0.50 g/t Au cut-off with a maximum 3.2m continuous below cut-off inclusion.

 

Table 3. Drill Hole Details at Chicken Mountain

Hole No. Type Azimuth (o) Dip (o) Length (m) UTM E UTM N Prospect Purpose
CMD25-027 DDH 120 -55 322.17 552448 6916970 Chicken Mountain Resource Delineation
CMD25-029 DDH 120 -55 321.56 552587 6916886 Chicken Mountain Resource Delineation
CMD25-032 DDH 120 -55 251.76 552654 6916850 Chicken Mountain Resource Delineation
CMD25-034 DDH 120 -55 279.20 552709 6916816 Chicken Mountain Resource Delineation
CMR25-069 RC 120 -55 44.20 552545 6916743 Chicken Mountain Exploration
CMR25-070 RC 120 -70 105.20 552545 6916743 Chicken Mountain Resource Delineation
CMR25-071 RC 120 -55 16.80 552564 6916500 Chicken Mountain Exploration
CMR25-072 RC 120 -60 65.53 552564 6916500 Chicken Mountain Exploration
CMR25-073 RC 120 -55 91.45 552567 6916730 Chicken Mountain Resource Delineation
CMR25-074 RC 120 -55 82.30 552593 6916483 Chicken Mountain Exploration
CMR25-075 RC 120 -75 48.80 552592 6916484 Chicken Mountain Exploration
CMR25-076 RC 120 -55 99.10 552611 6916699 Chicken Mountain Resource Delineation
CMR25-077 RC 120 -75 53.34 552610 6916699 Chicken Mountain Exploration
CMR25-078 RC 120 -50 71.62 552629 6916469 Chicken Mountain Exploration
CMR25-079 RC 120 -75 24.40 552628 6916469 Chicken Mountain Exploration
CMR25-080 RC 120 -55 91.44 552663 6916670 Chicken Mountain Resource Delineation
CMR25-081 RC 120 -55 44.20 552667 6916451 Chicken Mountain Exploration
CMR25-082 RC 120 -75 19.81 552666 6916451 Chicken Mountain Exploration
CMR25-083 RC 120 -55 77.72 552710 6916641 Chicken Mountain Resource Delineation
CMR25-084 RC 120 -65 54.90 552710 6916641 Chicken Mountain Resource Delineation
CMR25-085 RC 120 -55 99.10 552684 6916442 Chicken Mountain Exploration
CMR25-086 RC 120 -55 96.01 552750 6916621 Chicken Mountain Resource Delineation
CMR25-087 RC 120 -75 76.68 552750 6916621 Chicken Mountain Exploration
CMR25-088 RC 120 -55 79.25 552740 6916419 Chicken Mountain Exploration
CMR25-089 RC 120 -75 57.91 552739 6916420 Chicken Mountain Exploration
CMR25-090 RC 120 -55 32.00 552805 6916588 Chicken Mountain Resource Delineation
CMR25-091 RC 120 -75 80.80 552804 6916589 Chicken Mountain Exploration
CMR25-092 RC 120 -55 74.70 552827 6916386 Chicken Mountain Exploration
CMR25-093 RC 120 -75 61.00 552827 6916386 Chicken Mountain Exploration
CMR25-094 RC 120 -55 89.92 552637 6916349 Chicken Mountain Exploration
CMR25-095 RC 120 -75 53.34 552636 6916349 Chicken Mountain Exploration
CMR25-096 RC 120 -55 106.70 552888 6916359 Chicken Mountain Exploration
CMR25-097 RC 120 -55 85.34 552681 6916319 Chicken Mountain Exploration
CMR25-098 RC 120 -55 99.10 552769 6916150 Chicken Mountain Exploration
CMR25-099 RC 120 -75 83.82 552769 6916150 Chicken Mountain Exploration
CMR25-100 RC 120 -55 121.92 552723 6916290 Chicken Mountain Exploration
CMR25-101 RC 120 -55 109.72 552819 6916125 Chicken Mountain Exploration
CMR25-102 RC 120 -55 83.82 552784 6916259 Chicken Mountain Exploration
CMR25-103 RC 120 -55 106.70 552896 6916091 Chicken Mountain Exploration
CMR25-104 RC 120 -55 96.01 552826 6916231 Chicken Mountain Exploration
CMR25-105 RC 120 -75 59.44 552825 6916232 Chicken Mountain Exploration
CMR25-106 RC 120 -55 35.10 552870 6916204 Chicken Mountain Exploration

 

On behalf of Tectonic Metals Inc.,
Tony Reda
President and Chief Executive Officer

For further information about Tectonic Metals Inc. or this news release, please visit our website at www.tectonicmetals.com or contact Investor Relations, toll-free at 1.888.685.8558 or by email at investorrelations@tectonicmetals.com.

Posted January 22, 2026

Share this news article

MORE or "UNCATEGORIZED"


Mining Association of British Columbia - Northern BC: the Powerhouse of BC’s Mining Industry

Twenty-four mining projects in Northern British Columbia (BC), representing $69 billion in economic ... READ MORE

January 22, 2026

Summit Confirms the High-Grade Gold-Silver Potential of the Finn Zone: Drills 5.30 g/t Gold and 157.9 g/t Silver over 6.0 meters at the JD Project

Sun Summit Minerals Corp. (TSX-V: SMN)(OTCQB: SMREF) is pleased to report assay results from all 202... READ MORE

January 22, 2026

GoldHaven Identifies Significant Indium Enrichment with Values up to 334 ppm at Magno

GoldHaven Resources Corp. (CSE: GOH) (OTCQB: GHVNF) (FSE: 4QS) is pleased to report further findings... READ MORE

January 22, 2026

Leviathan Metals Intersects High-Grade Zinc, Lead and Silver mineralization in trenching at Foča, Bosnia and Herzegovina

Leviathan Metals Corp. (LVX:TSX-V) (LVXFF:OTC) (0GP:FSE) is pleased to announce the receipt of resul... READ MORE

January 22, 2026

Greenridge Exploration Announces Results of Summer 2025 Drilling at the Carpenter Lake Uranium Project, Athabasca Basin Area

Greenridge Exploration Inc. (CSE: GXP) (OTC: GXPLF) (FRA: HW3), is pleased to announce the results o... READ MORE

January 22, 2026

Copyright 2026 The Prospector News