The Prospector News

Artemis Gold Reports Q3 2025 Production Results

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

Artemis Gold Reports Q3 2025 Production Results

 

 

 

 

 

Artemis Gold Inc. (TSX-V: ARTG) announces production results for the three months ended September 30, 2025 for the Blackwater Mine in central British Columbia.

 

Blackwater produced 60,985 ounces of gold during Q3 2025, consistent with guidance, bringing production for the five months ended September 2025 to 95,809 ounces of gold. On a year-to-date basis at the end of September 2025, Blackwater produced 124,328 ounces of gold.

 

During Q3 2025, the mill operated at an average throughput rate of 16,618 tonnes per day or 101% of design capacity for quarter. This is after accounting for a major 3-day shutdown in July 2025. For August and September 2025, the mill operated at an average rate of 17,248 tonnes per day or 105% of design capacity. Gold recovery in the mill improved to approximately 87% in the last two months of the quarter.

 

Artemis Gold CEO Dale Andres commented: “We continue to steadily progress our ramp-up and optimization of the Blackwater operation, including our mill feed blending strategy to optimize recoveries.

 

“As planned, production for the year is weighted to Q4 2025, with higher mill throughput rates and feed grades expected compared to Q3 2025. We remain well positioned to achieve full-year production guidance of 190,000 to 230,000 ounces of gold.”

 

About Artemis Gold

 

Artemis Gold is a well-financed, growth-oriented gold and silver producer and development company with a strong financial capacity aimed at creating shareholder value through the identification, acquisition, and development of gold properties in mining-friendly jurisdictions. The Company’s current focus is the Blackwater Mine in central British Columbia approximately 160km southwest of Prince George and 450km northeast of Vancouver. The first gold and silver pour at Blackwater was achieved in January 2025 and commercial production was declared on May 1, 2025.

 

Qualified Person

 

Artemis Gold Vice President, Technical Services Alastair Tiver, a Qualified Person as defined by National Instrument 43-101, has reviewed and approved the scientific and technical information in this press release.

 

Posted October 7, 2025

Share this news article

MORE or "UNCATEGORIZED"


55 North Gold Enters into Mineral Exploration Agreement with Marcel Colomb First Nation

55 North Gold Inc. (CSE: FFF) (OTCQB: FFFNF) (FSE: 6YF) is pleased to announce that it has entered i... READ MORE

November 23, 2026

Sitka Gold Announces Strategic Investment of $72.7 Million from AngloGold Ashanti

Sitka Gold Corp. (TSX-V: SIG) (FSE: 1RF) (OTCQX: SITKF) is pleased to announce a strategic partnersh... READ MORE

November 23, 2026

Brunswick Closes Life Offering and First Tranche of Concurrent Non-Brokered Private Placement for Gross Proceeds of $18.6 Million

Brunswick Exploration Inc. (TSX-V: BRW) (OTCQB: BRWXF) (FRANKFURT:1XQ) is pleased to announce the cl... READ MORE

November 23, 2026

Kuya Silver Reports Q3 2026 Financial Results, Updates Progress on Bethania Mine Ramp-Up

Kuya Silver Corporation (CSE: KUYA) (OTCQB: KUYAF) (FSE: 6MR1) is pleased to announce financial and... READ MORE

November 23, 2026

Cadillac Mines Intersects 3.39 Grams Per Tonne Gold Over 8.4 Metres at the Chesterville East Extension Supporting Potential Northeast Expansion of the Open Pit Resource

Cadillac Mines Corporation (TSX: CADY), is pleased to announce additional assay results from diamon... READ MORE

November 23, 2026

Copyright 2026 The Prospector News