
Endurance Gold Corporation (TSX-V: EDG) (OTCQB: ENDGF) (FSE: 3EG) is pleased to announce assay results from three additional drill holes from the Crown “Gap” Zone and one hole from the Imperial Zone at its 100%-owned Reliance Gold Project. All four drill holes intersected gold mineralization hosted in the prime Royal Shear contact target, and one of the holes further tested a mineralized ultramafic-chert contact target in the footwall sequence, initially discovered and reported in hole DDH25-115. Highlights include:
“Testing of the Crown Gap is now delivering a high success rate of encouraging drill intersections. The wide-spaced drilling success statistics demonstrate potential for mineralized continuity along the 1.5 kilometre Royal Shear trend from the Imperial to Upper Eagle Zones,” stated Robert T. Boyd, President & CEO of the Company. “The association of ultramafic-associated gold mineralization makes the Crown Area unique along this trend.”
Twelve of eighteen drill holes completed to date from the “Crown Gap” have returned significant gold and antimony mineralization. In addition to hosting mineralization along the Royal Shear structure, Crown Zone holes have consistently intersected narrower high-grade quartz-carbonate veins that have occasionally exhibited visible gold (such as in DDH23-078, DDH24-093 and DDH24-103).
The 2025 diamond drilling program has twenty holes completed to date for a total of 6,438 m drilled. Assay results are pending for five completed holes. The drilling rig is currently testing at 70 m step-out of the Lower Crown discovery hole DDH24-103. The current drilled hole will also test deeper into the footwall volcanic package to evaluate the interpreted extension of the ultramafic-chert structural contact intersected in holes DDH25-115 and DDH25-121.
All drill assay results are reported as core length intervals. True composite widths are estimated at 90% to 100% of core length. Highlighted intervals are reported in Table 1 below and the 2025 completed drill holes are shown on the plan map in Figure 1 and the Royal Shear inclined longitudinal section in Figure 2.
In other ongoing activities, mineral resource modeling is in progress and metallurgical testwork is in progress at the Blue Coast Research laboratory. Prospecting, geological mapping and soil sampling have continued through September on the eastern Olympic structures, and the southeast extension of the Royal Shear Trend. Over 1,500 soil samples and 150 rock samples have been collected to date.
Endurance Gold Corporation is a company focused on the acquisition, exploration and development of highly prospective North American mineral properties.
Figure 1: Reliance Property – 2025 Royal Shear Drill Plan Map – Crown Gap Target Area
Figure 2: Reliance Property – Royal Shear Inclined Longitudinal – 2025 Drill Targeting Areas
Table 1 – 2025 Significant Composite DDH Assays Results
Proceeds to be Used to Accelerate the Development of the United ... READ MORE
Barrick Mining Corporation (NYSE:B) (TSX:ABX) announced that it h... READ MORE
Aquitaine Metals Corp. is pleased to announce the first drill res... READ MORE
B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) is pleased to announce th... READ MORE
HIGHLIGHTS 2,279 m of infill drilling completed on 10-m dr... READ MORE