The Prospector News

ESGold Expands Montauban Mine Building to 4,000 sq. ft. Ahead of Key Operational Milestones

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

ESGold Expands Montauban Mine Building to 4,000 sq. ft. Ahead of Key Operational Milestones

 

 

 

 

 

Increased facility footprint reflects advanced construction progress and preparation for active gold-silver production and concentrate processing

 

ESGold Corp(CSE: ESAU) (OTCQB: ESAUF) (FSE: Z7D)  is pleased to announce a significant expansion of its Montauban Project mine building to support the Company’s transition into gold and silver production. Originally planned at approximately 2,000 square feet, the building is now being expanded to 4,000 square feet to accommodate enhanced operational needs and support infrastructure.

 

This latest development reflects the Company’s continued momentum and preparation for a highly active construction and commissioning season at Montauban.

 

“As construction progresses and we prepare for near-term operations, we’re not just building infrastructure—we’re establishing the systems and capacity needed to support sustained production and long-term growth,” said Paul Mastantuono, CEO of ESGold. “This expanded footprint reflects the pace of our momentum and the long-term vision we are committed to delivering at Montauban.”

 

Expanded Capacity for Production Readiness

 

The enlarged facility will now include:

  • Dedicated crew accommodations, including change rooms and showers to support on-site personnel
  • Control rooms for monitoring the gravity separation and processing systems
  • A secure lab space for ongoing gold and silver concentrate testing
  • Expanded “Gold Room” storage for secure handling and safekeeping of gold and silver dore bars

 

The Company has also shipped railbed pre-concentrate samples for ongoing lab testing, with results expected in the near term. These results will guide final adjustments to the flow sheet and may impact future on-site processing efficiency.

 

What’s Ahead for ESGold

  • Preliminary Economic Assessment  – Imminent release of updated study outlining project economics
  • Ambient Noise Tomography Results – Final imaging and 3D model to be released shortly
  • Exploration Strategy – Expansion beyond tailings into district-scale targets
  • Scalable Processing Model – Progress toward validating a repeatable clean redevelopment framework

 

About ESGold Corp.

ESGold Corp. is a fully permitted, pre-production resource company at the forefront of clean mining and exploration innovation. With proven expertise in Quebec, the Company is advancing its projects toward production and feasibility while delivering long-term value through sustainable resource recovery and exploration. ESGold’s flagship Montauban property, located 80 kilometers west of Quebec City, serves as a model for responsible mining practices, combining near-term production with district-scale discovery potential.

 

Posted June 30, 2025

Share this news article

MORE or "UNCATEGORIZED"


URANIUM ENERGY CORP ANNOUNCES THE CLOSING OF $203 MILLION PUBLIC OFFERING

Proceeds to be Used to Accelerate the Development of the United ... READ MORE

October 6, 2025

Barrick Announces Sale of Interest in Tongon for Up To $305 Million

Barrick Mining Corporation (NYSE:B) (TSX:ABX) announced that it h... READ MORE

October 6, 2025

Aquitaine Metals Drills Broad High-Grade Gold Mineralization: 16.45 g/t gold over 20.00 metres at Limousin Project

Aquitaine Metals Corp. is pleased to announce the first drill res... READ MORE

October 6, 2025

B2Gold Achieves Commercial Production at the Goose Mine

B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) is pleased to announce th... READ MORE

October 6, 2025

Osisko Development Provides Infill Drilling Update on Its 13,000-Meter Lowhee Program at Cariboo Gold Project; Intercepts Include 45.24 G/T Gold Over 3.0 Meters, Including 233.92 G/T Gold Over 0.5 Meters

HIGHLIGHTS 2,279 m of infill drilling completed on 10-m dr... READ MORE

October 6, 2025

Copyright 2025 The Prospector News