The Prospector News

SANTO TOMAS PROJECT MOVES FORWARD

You have opened a direct link to the current edition PDF

Open PDF Close
Uncategorized

Share this news article

SANTO TOMAS PROJECT MOVES FORWARD

 

 

 

 

 

Oroco Resource Corp. (TSX-V: OCO) (OTC: ORRCF) Last week in Culiacan, Sinaloa, Craig Dalziel, Oroco’s Chairman, and other members of Oroco’s Senior Management Team met with Rubén Rocha Moya, the Governor of Sinaloa, Ricardo Velarde Cárdenas, Secretary of the Economy for Sinaloa, and other senior state government officials, to discuss the advancement of the Santo Tomás Copper Project in Choix, Sinaloa.  The Governor recognizes the project’s potential for responsible development, investment, and long-term economic growth, and confirmed the potential contribution of the Santo Tomás Project to the future of the state economy, particularly that of the Municipality of Choix.  The Governor stated that his government is committed to generating good jobs in the Choix region through environmentally and socially sustainable development.

 

The state meeting with Governor Rocha Moya followed the prior meetings in Mexico City with Dr. Luis Rosendo Gutiérrez Romano, the Undersecretary of the Mexican Economy, and his senior staff (refer to the Oroco news release of March 26, 2025), and a subsequent technical meeting in which Ian Graham, Oroco’s President, Ubaldo Trevizo Ledezma, Santo Tomas Project Manager, and senior Oroco technical personnel presented the Santo Tomas Project to Fernando José Aboitiz Saro, Head of the Extractives Activities Coordination Unit, and Luz Hiram Olimpia Laguna Morales, Director General of Mining Development, and their technical staff.  The purpose of the technical meeting was to prepare for the incorporation of the Santo Tomas Project into the Key Development Projects Registry to be maintained by the Ministry of the Economy’s Mining Coordination Office, an important element of Mexican Government support.

 

“The state executive and federal technical meetings continued to provide commitments of strong Mexican Government support for the Santo Tomás Project.  Coordinated by Congressional Deputy Mario Zamora and his staff, these meetings have led to a responsive and supportive dialogue with Mexico’s senior economic and mine development officials and we are extremely grateful for the guidance and support.  The pathway forward for the continued development of the Santo Tomas Project is now clear,” commented the Oroco Chairman, Craig Dalziel.

 

Read the official statement by Governor Rocha Moya at https://sinaloa.gob.mx/son-bienvenidas-las-inversiones-mineras-sustentables-y-generadoras-de-empleos-locales-gobernador-ruben-rocha/ and a sample of the extensive media coverage following the meetings can be followed from links tabled at www.orocoresourcecorp.com

 

ABOUT OROCO

 

The Company holds a net 85.5% interest in those central concessions that comprise 1,173 hectares “the Core Concessions” of The Santo Tomas Project, located in northwestern Mexico. The Company also holds an 80% interest in an additional 7,861 hectares of mineral concessions surrounding and adjacent to the Core Concessions (for a total Project area of 9,034 hectares, or 22,324 acres). The Project is situated within the Santo Tomas District, which extends up to the Jinchuan Group’s Bahuerachi Project, approximately 14 km to the northeast. The Project hosts significant copper porphyry mineralization initially defined by prior exploration spanning the period from 1968 to 1994. During that time, the Project area was tested by over 100 diamond and reverse circulation drill holes, totaling approximately 30,000 meters. Commencing in 2021, Oroco conducted a drill program (Phase 1) at Santo Tomas, with a resulting total of 48,481 meters drilled in 76 diamond drill holes.

 

The drilling and subsequent resource estimates and engineering studies led to a revised MRE and an updated PEA being published and filed in August of 2024, which studies are available at the Company’s website www.orocoresourcecorp.com and by reviewing the Company profile on SEDAR+ at www.sedarplus.ca.

 

The Santo Tomás Project is located within 170 km of the Pacific deep-water port at Topolobampo and is serviced via highway and proximal rail (and parallel corridors of trunk grid power lines and natural gas) through the city of Los Mochis to the northern city of Choix. The property is reached, in part, by a 32 km access road originally built to service Goldcorp’s El Sauzal Mine in Chihuahua State.

 

Posted April 2, 2025

Share this news article

MORE or "UNCATEGORIZED"


Delta Reports New Gold Intercept at Nova Target in Wedge Area, 4 Kilometres West of Eureka; Follow-Up Drill Program Underway

Delta Reports New Gold Intercept at Nova Target in Wedge Area, 4 ... READ MORE

February 4, 2026

Silver One Announces Closing Of Final Tranche Of $32 Million Financing

Silver One Resources Inc. (TSX-V: SVE) (OTCQX: SLVRF) (FSE: BRK1)... READ MORE

February 4, 2026

SAGA Metals Achieves 100% Drilling Success in 2025—Reports Final Assays from Trapper South at Radar Critical Minerals Project in Labrador

Exceptional grades of Titanium, Vanadium and Iron in all 15 drill... READ MORE

February 4, 2026

Near Surface Intersection Yields 6.58 g/t gold over 10.35 metres

Intersection is within 33 metres from surface and contained in a ... READ MORE

February 4, 2026

Alamos Gold Provides Three-Year Operating Guidance Outlining 46% Production Growth by 2028 at Significantly Lower Costs

Further production growth to one million ounces annually expected... READ MORE

February 4, 2026

Copyright 2026 The Prospector News