Titan Mining Corporation (TSX: TI) (OTCQB: TIMCF) announces the results for the quarter ended September 30, 2024. (All amounts are in U.S. dollars unless otherwise stated)

 

Don Taylor, Chief Executive Officer of Titan, commented, “Despite the setback caused by Tropical Storm Debby, management and staff at the mine were able to make full repairs and stockpile ore during the recovery period while the crusher repairs were being completed. As a result, Titan reiterates its full year production guidance and fully expects Q4 cash costs to offset the higher costs reflected in Q3.   Additionally, in Q4, Titan expects to release an updated Life of Mine Plan for its zinc operations and a maiden resource estimate for its Kilbourne graphite project.”

 

Q3 2024 HIGHLIGHTS:

  • Appointment of Rita Adiani as President of the Company
  • Zero Lost Time Injuries in the third quarter.
  • Returned to full commercial production on September 26, 2024 following the temporary suspension of operations resulting from the historic flooding caused from Tropical Storm Debby. There were no injuries to employees or damage to the mobile fleet. Repairs were completed ahead of schedule and under budget.

 

TABLE 1 Financial and Operating Highlights

 

    Q3 2024 Q2 2024 Q1 2024 Q4 2023 Q3 2023
Operating            
Payable Zinc Produced mlbs 8.0   14.5 14.7   13.9   18.3
Payable Zinc Sold mlbs 8.2   14.7 14.4   13.9   18.3
Average Realized Zinc Price $/lb 1.27   1.30 1.11   1.13   1.10
Financial            
Revenue $m 8.27   17.97 11.73   10.91   15.50
Net Income (loss) before tax $m (4.86 ) 2.62 (2.63 ) (6.96 ) 0.50
Earnings (loss) per share – basic $/sh (0.04 ) 0.02 (0.02 ) (0.05 ) 0.00
Cash Flow from Operating Activities before changes in non-cash working capital $m (1.68 ) 6.97 0.26   (1.36 ) 4.21
Cash and Cash Equivalents $m 5.84   5.55 4.18   5.03   4.32
Net Debt 1 $m 30.78   30.63 32.44   30.75   32.93


1
Net Debt is a non-GAAP measure. This term is not a standardized financial measure under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See Non-GAAP Performance Measures below for additional information.

 

As a result of Tropical Storm Debby, revenues were lower during the three and nine months ended September 30, 2024, largely due to the temporary suspension of operations at ESM during the period from August 12, 2024 to September 26, 2024. Additionally, AISC increased to $1.35 in Q3 2024 from $0.79/lb in Q2 2024, primarily due to lower concentrate deliveries during August and September.

 

OPERATIONS REVIEW

 

Mining in the third quarter of 2024 focused on the Mahler, New Fold, and Mud Pond zones. Mining activities remain suspended in the N2D zone while the Company reviews opportunities to restart production in this area. Deepening of the Lower Mahler ramp system provided access to higher-grade ore in the Lower Mahler mining zone that supported higher than budgeted grades. Longhole stope mining in New Fold provided above-target grades and tons. Ore recovery from the longhole stoping in New Fold will continue into the fourth quarter. It is expected that ore from New Fold and Lower Mahler zones will continue to support budgeted head grades for the remainder of the fiscal year. Mining will continue in these key zones during the fourth quarter of 2024.

 

While crushing and hoisting activities were halted from August 12, 2024 to September 26, 2024, mining activities continued and ore was stockpiled in the underground. The Company expects to hoist and mill budgeted tonnage in Q4 plus all underground ore that was stockpiled in Q3. With the excess capacity in the mill, the Company expects to meet full year guidance.

 

Work on projects focused mainly on the rehabilitation of the underground crusher and associated electrical components that were damaged during the flooding caused by Tropical Storm Debby. In addition, a previously unknown raise at the old Streeter Portal at the #2 mine area, which is suspected to have been a major contributor to the inflow, was permanently plugged to prevent any future inflow. Rod mill liners were installed in the third quarter of 2024. In the fourth quarter of 2024, the Company plans to initiate a market search for a replacement underground haulage truck and a mechanical bolter.

 

EXPLORATION UPDATE

 

Kilbourne:

 

Titan has continued work on defining the Kilbourne graphite target, a graphite exploration target hosted within the same stratigraphic sequence as ESM’s zinc mineralization. The host unit is Unit 2 of the lower marbles. Historic mapping and drilling have documented roughly 25,000 ft (7.6 km) of strike length, from surface to a depth of over 3,000 ft (914 m). Roughly 8,500 ft (2.5 km) of this strike length is within the affected area of the Empire State Mine. The remaining strike length is securely within mineral rights held by Titan. Permitting for bringing Kilbourne into production is subject to a state level permitting process.

 

Phase I of drilling at Kilbourne was completed in the second quarter of 2024 and totalled 11,916 ft (3,362 m). Drilling indicates that host lithology can be divided into two zones of mineralization. The upper mineralized zone with an average thickness of 57 ft (17.4 m) and an average grade of 3.1% graphitic carbon (Cg) and the lower mineralized zone with an average thickness of 29 ft (8.8 m) and an average grade of 2.8% Cg. Phase I of Kilbourne drilling successfully tested 8,255 ft of strike length within the ESM active use permit.

 

Phase II of the metallurgical testing performed by Forte Analytical of Wheatridge Colorado was completed in the third quarter. The Company is awaiting assay results from these tests. The Company has additionally sought the services of Metpro Services to help in developing the next stages of metallurgical and process testing. Phase III of metallurgy will take place at SGS Lakefield and is likely to be completed by Q4 2024.

 

Qualified Person

 

The scientific and technical information contained in this news release and the sampling, analytical and test data underlying the scientific and technical information has been reviewed, verified and approved by Donald R. Taylor, MSc., PG, Chief Executive Officer of the Company, a qualified person for the purposes of NI 43-101. Mr. Taylor has more than 25 years of mineral exploration and mining experience and is a Registered Professional Geologist through the SME (registered member #4029597). The data was verified using data validation and quality assurance procedures under high industry standards.

 

Assays and Quality Assurance/Quality Control

 

To ensure reliable sample results, the Company has a rigorous QA/QC program in place that monitors the chain-of-custody of samples and includes the insertion of blanks and certified reference standards at statistically derived intervals within each batch of samples. Core is photographed and split in half with one-half retained in a secured facility for verification purposes. Drill core samples submitted for analysis had a minimum weight of 0.6 lb (0.3 kg) and a maximum weight of 6.0 lb (2.7 kg), with an average weight of 3.6 lb (1.6 kg). Trench samples submitted for analysis had a minimum weight of 4.2 lb (1.9 kg) and a maximum weight of 26.2 lb (11.9 kg), with an average weight of 6.2 lb (13.6 kg).

 

Analysis has been performed as SGS Canada Inc. an independent ISO/IEC accredited lab. Sample preparation (crushing and pulverizing) and total graphitic carbon analysis has been completed at SGS Lakefield, Ontario, Canada. SGS prepares a pulp of all samples and sends the pulps to their analytical laboratory in Burnaby, B.C., Canada for multielement analysis. SGS analyzes the pulp sample by leach and IR combustion for total graphitic carbon (GC_CSA05V) and aqua regia digestion (GE-ICP21B20 for 34 elements) with an ICP – OES finish including Cu (copper), Pb (lead), and Zn (zinc). All samples in which Cu (copper), Pb (lead), or Zn (zinc) are greater than 10,000 ppm are re-run using aqua regia digestion (GO_ICP21B100) with the elements reported in percentage (%).

 

The Company has not identified any drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data set out in this news release. True widths of the mineralized zones described in this news release are not presently known.

Posted November 12, 2024

Share this news article

MORE or "UNCATEGORIZED"


White Gold Corp. Closes $5M First Tranche of Upsized Private Placement

White Gold Corp. (TSX-V: WGO) (OTCQX: WHGOF) (FRA: 29W) is please... READ MORE

December 23, 2024

Osisko Announces Acquisition of Additional Gibraltar Silver Stream Interest and Closing of the Dalgaranga Royalties Acquisition

Osisko Gold Royalties Ltd (TSX:OR) (NYSE:OR) is pleased to announ... READ MORE

December 23, 2024

Canada Nickel Announces Initial Resource at Reid Nickel Sulphide Project

Highlights: Initial Reid Indicated Resource of 0.59 billion tonne... READ MORE

December 23, 2024

NMG Announces the Closing of Aggregate US$50 Million Private Placement by Canada Growth Fund and Investissement Quebec

Nouveau Monde Graphite Inc. (NYSE: NMG) (TSX-V: NOU) confirms it ... READ MORE

December 23, 2024

FALCO ANNOUNCES CLOSING OF BROKERED PRIVATE PLACEMENT

Falco Resources Ltd. (TSX-V: FPC) is pleased to announce the closing of ... READ MORE

December 20, 2024

Copyright 2024 The Prospector News